Defining the gold standard in high-pressure gas separation and compression technology for the global petrochemical industry.
As a global leader in gas processing, we specialize in the high-efficiency lpg gas cng infrastructure. Our systems are engineered for maximum purity and operational safety, ensuring that industrial gas streams are compressed with absolute precision.
By integrating cryogenic separation technology with our lpg gas cng compressors, we reduce energy consumption by 22% while increasing throughput, providing a sustainable edge in a competitive petrochemical landscape.
A synergy of advanced materials, intelligent control, and extreme precision.
Utilizing aerospace-grade alloys to ensure zero corrosion and maximum lifespan.
AI-driven pressure modulation for optimal energy efficiency.
Advanced cooling cycles to prevent thermal degradation during peak loads.
Empirical data demonstrating our superiority in gas compression efficiency.
Precision data for high-pressure gas compression and separation units.
| Product Series | Max Pressure | Flow Rate | Energy Class | Cooling Type | Certification |
|---|---|---|---|---|---|
| Enric Ultra-X1 | 250 Bar | 5000 Nm3/h | A+++ | Liquid Nitrogen | ISO 9001 / CE |
| Enric Ultra-X2 | 300 Bar | 8000 Nm3/h | A++ | Water-Cooled | ASME / CE |
| Enric Pro-C1 | 150 Bar | 3000 Nm3/h | A+ | Air-Cooled | ISO 14001 / CE |
| Enric Pro-C2 | 200 Bar | 6000 Nm3/h | A | Water-Cooled | TUV / CE |
| Enric Titan-S1 | 400 Bar | 12000 Nm3/h | A++ | Hybrid-Cooled | ISO 45001 / CE |
| Enric Titan-S2 | 450 Bar | 15000 Nm3/h | A+ | Liquid Nitrogen | API 618 / CE |
| Enric Nano-L1 | 100 Bar | 1000 Nm3/h | A+++ | Air-Cooled | UL / CE |
| Enric Nano-L2 | 120 Bar | 2000 Nm3/h | A++ | Water-Cooled | ISO 9001 / CE |
Note: All pressure ratings are based on standard ISO operating conditions. Custom configurations available upon request for extreme environment deployment.
Proven performance across diverse industries and challenging environments.
CNG Station Optimization
Implemented high-pressure CNG compressors that increased fueling speed by 35% in sub-zero Arctic conditions.
LPG Recovery Plant
Deployed a multi-stage separation unit that recovered 12% more propane from waste streams, reducing environmental impact.
Industrial CNG Scale-up
Installed a centralized compression hub serving 50+ factories, reducing local fuel costs by 18% via bulk CNG logistics.
High-Temp CNG Ops
Developed customized cooling jackets for compressors operating in 50°C+ ambient temperatures, ensuring 99.9% uptime.
Intermodal LPG Transfer
Integrated a seamless transfer system between ship and rail, reducing transit leaks to near-zero levels.
High-Altitude CNG
Optimized compression ratios for low-density air environments, maintaining consistent flow at 4,000m elevation.
Tailored solutions for demanding industrial environments worldwide.
High-volume LPG recovery and compression for feedstock processing in large-scale refineries.
Fast-fill compression modules for heavy-duty vehicle fleets and public CNG infrastructure.
Virtual pipeline systems utilizing high-pressure CNG cylinders for remote energy delivery.
High-precision gas dosing and compression for specialized catalyst synthesis.
Ultra-pure CNG systems for specialized ground support and propulsion testing.
Biomethane compression for grid injection and sustainable CNG distribution.
Every unit undergoes a 48-hour stress test under 1.5x rated pressure to guarantee absolute structural integrity.
Vacuum-sealed aluminum foil and reinforced steel crates ensure zero oxidation during long-haul maritime transit.
Full documentation including Material Test Reports (MTR) and pressure certificates for every shipment.
Certified by international auditing bodies for safety and performance.
Expert answers to common technical and commercial inquiries.
With standard maintenance, our systems are designed for a operational lifespan of 15-20 years due to the use of anti-corrosive titanium alloys.
Yes, we offer fully bespoke engineering, including custom pressure ratings, specialized cooling modules, and AI-control logic tailored to your specific site.
All our units are CE, ASME, and ISO certified, meeting the most stringent international safety standards for high-pressure gas equipment.
We utilize a proprietary multi-stage cooling cycle, ranging from traditional water-cooling to advanced cryogenic liquid nitrogen heat exchangers.
Typical lead times range from 6 to 12 weeks depending on complexity, including the design, manufacturing, and rigorous testing phases.
We provide a full integration service, including site surveys and custom flange adapters to ensure seamless compatibility with your existing piping.
Partner with the world leader in Gas Compression and Separation Equipment. Experience the unmatched reliability of our lpg gas cng solutions.