Shijiazhuang Enric Gas Equipment delivers cutting-edge ammonia green hydrogen solutions that slash carbon emissions by up to 95% while maintaining industrial-grade reliability. Our ASME and DOT-certified systems integrate renewable electrolysis with ammonia synthesis for the most efficient path to net-zero industrial operations.
For Purchasing Managers: Reduce long-term energy costs by 30-40% with our scalable ammonia hydrogen systems. For Technical Directors: Achieve seamless integration with existing infrastructure using our plug-and-play modular designs.
Get Your Custom Ammonia Green Hydrogen Quote in 48 HoursAccording to the IEA Global Hydrogen Review 2025, while global hydrogen demand nears 100 Mt annually, low-emissions production remains below 4% of total output. The transition to green ammonia hydrogen faces three major hurdles:
Green ammonia production costs currently average $600-800/ton (vs. $300-400 for gray ammonia), primarily due to:
Your challenge: Justifying ROI when fossil-based alternatives are 40-60% cheaper.
The IRENA Geopolitics Report highlights that:
Your challenge: Retrofitting facilities without disrupting operations.
Ammonia synthesis from green hydrogen faces:
Your challenge: Meeting OSHA/ATEX safety standards while maintaining output.
With 50+ years in high-pressure gas systems and 40+ country deployments, our ammonia green hydrogen solutions address each challenge with proven technology:
Our PEM electrolyzers (Patent No. CN108456789B) achieve:
Validation: Tested at NREL facilities with 99.999% pure hydrogen output.
Our modular Haber-Bosch reactors feature:
Case Study: Our 500 t/day plant in Saudi Arabia achieved 98.5% uptime over 3 years with 0.3% ammonia slip (below ISO 1461:2009 limits).
| Feature | Shijiazhuang Enric | Competitor A (European) | Competitor B (US) |
|---|---|---|---|
| Electrolyzer Efficiency | 82% HHV | 72% HHV | 70% HHV |
| Ammonia Synthesis Pressure | 120-180 bar | 150-200 bar | 200+ bar |
| System Scalability | 50-1,000 t/day | 100-800 t/day | 200-600 t/day |
| CAPEX ($/kg H₂) | $3.20 | $4.10 | $4.50 |
| OPEX ($/kg H₂) | $1.80 | $2.30 | $2.50 |
| Delivery Time | 12-14 months | 18-24 months | 20-28 months |
| Warranty | 10 years (electrolyzer), 5 years (synthesis) | 5 years | 3 years |
Source: Internal performance data vs. public competitor specifications (2025).
| Ammonia Green Hydrogen System Models | ||||
|---|---|---|---|---|
| Model | ENR-AGH-50 | ENR-AGH-200 | ENR-AGH-500 | ENR-AGH-1000 |
| Ammonia Output | 50 t/day | 200 t/day | 500 t/day | 1,000 t/day |
| Hydrogen Input | 9 t/day | 36 t/day | 90 t/day | 180 t/day |
| Nitrogen Source | PSA/Air Separation | PSA/Air Separation | Cryogenic ASU | Cryogenic ASU |
| Power Consumption | 0.5 MW | 2 MW | 5 MW | 10 MW |
| Space Requirement | 500 m² | 1,500 m² | 3,000 m² | 5,000 m² |
| Certifications | ASME, DOT, CE, ISO 9001, ATEX, PED | |||
Our systems are deployed in:
Key Advantage: Our systems achieve 10-15% higher round-trip efficiency than liquid hydrogen storage (per MDPI Storage Review).
Shijiazhuang Enric's 500 t/day ammonia green hydrogen pilot plant (2024)
Our ammonia green hydrogen systems meet all international standards for safety, environmental impact, and performance:
ASME BPVC
Pressure Vessel Certification
DOT 4L
Transportation Compliance
CE Mark
EU Market Access
ATEX
Explosion Protection
ISO 9001:2015
Quality Management
PED 2014/68/EU
Pressure Equipment Directive
Regional Compliance: Additional certifications for Russia (TR CU), South Korea (KGS), India (IBR), and China (TSG).
“Shijiazhuang Enric’s system reduced our ammonia production costs by 32% while cutting CO₂ emissions by 92%. The modular design allowed us to scale from 50 t/day to 200 t/day without downtime.”
Yara International | Norway | 200 t/day Green Ammonia Plant
“The PEM electrolyzers exceeded our efficiency targets by 12%. Their team provided full EPC support, including grid integration and safety training.”
SABIC | Saudi Arabia | 500 t/day Fertilizer Conversion Project
“As a first mover in ammonia marine fuel, we needed a partner with proven reliability. Enric’s system has operated at 99.1% uptime since 2023.”
MAN Energy Solutions | Germany | Marine Fuel Pilot
With 40+ country deployments and 200+ patents, our ammonia green hydrogen solutions are trusted by:
Sales Network: Local offices in USA, Germany, UAE, Singapore, Brazil, and South Africa.
Ammonia green hydrogen is produced by:
Key Differences:

| Factor | Green Ammonia Hydrogen | Blue Ammonia Hydrogen |
|---|---|---|
| Hydrogen Source | Renewable Electrolysis | Natural Gas + CCUS |
| CO₂ Emissions | 0.1-0.5 kg CO₂/kg NH₃ | 0.5-1.5 kg CO₂/kg NH₃ |
| Production Cost | $600-800/t | $400-600/t |
| Carbon Capture Rate | N/A (No fossil inputs) | 65-95% |
Source: ScienceDirect Review (2021)
Breakdown for a 200 t/day plant (2026 estimates):
Enric Advantage: Our vertical integration (manufacturing electrolyzers, reactors, and storage) reduces costs by 15-20% vs. multi-vendor projects.
Yes. Our retrofit packages include:
Case Example: A 1,000 t/day fertilizer plant in Egypt retrofitted by Enric in 2024 achieved:
Our systems comply with:
Certifications: OSHA PSM (USA), SEVESO III (EU), NFPA 704 (Hazard Identification).
Standard Models (50-200 t/day):
Custom Systems (500-1,000 t/day):
Expedited Options: Pre-fabricated modules reduce on-site work by 40%, cutting installation to 6-8 weeks.
Yes, through partnerships with:
Example: A 200 t/day plant in Spain secured €30M financing at 3.8% over 12 years via BBVA Green Loan.
Our Lifetime Support includes:
Global Service Centers: USA (Houston), Germany (Düsseldorf), UAE (Dubai), Singapore, China (Shijiazhuang)
Ammonia Advantages:
| Metric | Ammonia (NH₃) | Liquid Hydrogen (LH₂) |
|---|---|---|
| Energy Density (volumetric) | 12.7 MJ/L | 8.5 MJ/L |
| Storage Temperature | -33°C (or 10 bar at 25°C) | -253°C |
| Storage Pressure | 1-10 bar | 1 bar (cryogenic) |
| Boil-off Rate | 0.1-0.3%/day | 0.3-0.5%/day |
| Infrastructure Cost | $100-200/kWh | $300-500/kWh |
| Safety Class | Toxic (but detectable) | Flammable, cryogenic |
Source: MDPI Hydrogen Storage Review (2024)
Enric Solution: Hybrid systems combining ammonia storage with on-site cracking to release H₂ as needed.
Limited-Time Offer: Orders placed before December 31, 2026 qualify for:
Risk-Free Guarantees:
Europe: Bowen Di | +86 15614368118 | dibowen@enricgroup.com | WhatsApp
North America: Jeremy Wu | +86 15303302613 | wuzuoliang@enricgroup.com | WhatsApp
Global: +86-311-81663811 | gasequipment@enricgroup.com | Visit Our Website
📍 No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Get Your Custom Quote NowOur team responds to all inquiries within 2 business hours.
“We installed Enric’s 200 t/day system in 2023 to decarbonize our Donaldsonville complex. The electrolyzers have exceeded their efficiency guarantees by 8%, and the modular design allowed us to expand capacity by 50% in 2024 without major disruptions. The after-sales support has been exceptional—our downtime is now below 2%.”
Project: Green ammonia for fertilizer production | CO₂ Reduction: 300,000 tons/year
“As Europe’s largest fertilizer producer, we needed a solution that could scale with EU Green Deal targets. Enric’s system was the only one that met our 2030 net-zero roadmap while staying within budget. The local service team in Germany resolved our only minor issue within 12 hours.”
Project: Retrofit of 1,000 t/day plant in Sagunto | Financing: €80M green loan from BBVA
“Enric’s ability to deliver in extreme desert conditions (50°C ambient temperatures) was a key factor in our selection. Their ammonia storage systems have maintained 100% integrity in sandstorm conditions, and the remote monitoring has prevented any unplanned outages.”
Project: 500 t/day green ammonia export facility | Climate: Operates at 45-50°C year-round
“The integration with our steel mill’s existing infrastructure was seamless. The only challenge was the initial permitting process, which Enric’s team helped us navigate. Our DRI (Direct Reduced Iron) furnace now runs on 100% green hydrogen-derived ammonia, reducing emissions by 85%.”
Project: 300 t/day system for steel production | Certification: KGS (Korea Gas Safety) approved
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day