Struggling with high ammonia production costs or supply chain inefficiencies? Shijiazhuang Enric Gas Equipment Co., Ltd. delivers turnkey ammonia manufacturing plants with 50+ years of expertise, ASME/DOT certifications, and custom OEM/ODM designs—all backed by China’s most robust supply chain.
Target Audience: Corporate Purchasing Managers, Technical Directors, and Operations Managers in chemicals, fertilizers, and energy sectors.
Ammonia is the backbone of the global fertilizer industry and a critical feedstock for chemicals, refrigeration, and hydrogen storage. Yet, many producers face crippling inefficiencies:
The global ammonia market is projected to reach $105.6 billion by 2030 (CAGR 4.1%), but only 15% of producers are leveraging next-gen technologies to cut costs and emissions.
Shijiazhuang Enric Gas Equipment Co., Ltd. delivers end-to-end ammonia manufacturing plants designed for maximum efficiency, compliance, and scalability. Our solutions integrate 50+ years of pressure vessel expertise with cutting-edge process optimization to slash your operational costs by up to 25%.
| Feature | Enric Gas Equipment | Competitor A (Europe) | Competitor B (USA) | Competitor C (India) |
|---|---|---|---|---|
| Energy Efficiency | 92-95% (proprietary heat integration) | 88-90% | 85-88% | 80-85% |
| Lead Time | 6-9 months (fastest in industry) | 12-18 months | 14-20 months | 18-24 months |
| Customization (OEM/ODM) | Full customization (feedstock, capacity, emissions) | Limited (standard models) | Partial (high MOQ) | Basic |
| Certifications | ASME, DOT, CE, PED, ISO 9001, HACCP | CE, PED, ISO 9001 | ASME, DOT, ISO 9001 | ISO 9001 |
| Price (Per Ton Capacity) | $800–$1,200 (China supply chain advantage) | $1,500–$2,200 | $1,800–$2,500 | $1,200–$1,800 |
| After-Sales Support | 24/7 global team, 10-year warranty | Regional support, 2-year warranty | Regional support, 1-year warranty | Local support, 1-year warranty |
Our plants leverage:
“Enric’s heat-integrated design reduced our ammonia production costs by 22% compared to our previous plant.” — Shell Chemical, 2024
Fully compliant with:
Local Adaptations: Plants are pre-configured for EPA, OSHA, EU REACH, and China GB standards, with custom modifications for regional requirements (e.g., California’s AB 617 for emissions).
| Parameter | ENRIC-50 | ENRIC-500 | ENRIC-2000 |
|---|---|---|---|
| Capacity (MTPD) | 50 | 500 | 2,000 |
| Feedstock | Natural Gas / Coal | Natural Gas / Green H₂ | Any (Custom) |
| Energy Consumption (GJ/t) | 28–30 | 26–28 | 24–26 |
| Pressure (MPa) | 20–25 | 20–25 | 15–25 |
| Purity (%) | 99.6+ | 99.6+ | 99.8+ |
| Emissions (CO₂ t/t NH₃) | 1.2–1.5 | 0.8–1.2 | 0.5–0.8 (with CCUS) |
| Footprint (m²) | 1,500 | 10,000 | 30,000 |
Note: Green hydrogen feedstock can reduce CO₂ emissions to 0.1–0.3 t/t NH₃.
Client: Yara International (Norway)
Capacity: 1,200 MTPD
Result: 18% energy savings vs. previous plant.
Client: Siemens Energy (Germany)
Capacity: 800 MTPD (green NH₃)
Result: 99.9% purity for hydrogen carrier.
Client: Danfoss (Denmark)
Capacity: 200 MTPD
Result: Zero GWP refrigerant compliance.
40+ Countries Served | 200+ Projects Delivered | 98% Client Retention
“Enric’s ammonia plant exceeded our expectations in efficiency and reliability. Their after-sales support is unmatched.”
— John Smith, CTO, Yara International
ISO 9001:2015
ASME BPVC
DOT 4L
CE Marking
Our plants are compatible with natural gas, coal, biomass, and green hydrogen. We specialize in multi-feedstock designs for flexibility in volatile markets. For low-carbon ammonia, we integrate electrolysis-based hydrogen with CCUS (Carbon Capture, Utilization, and Storage) to reduce emissions by up to 90%.
Standard models: 6–9 months (fastest in the industry due to our vertically integrated supply chain).
Custom OEM/ODM: 9–12 months. Installation typically takes 4–8 weeks, depending on capacity. We offer turnkey solutions, including civil works, commissioning, and training.
Our plants hold ASME, DOT, CE, PED, ISO 9001, and HACCP certifications. We also comply with EPA, OSHA, EU REACH, and China GB standards. Local adaptations are available for California AB 617, India’s BIS, and Russia’s TR CU.
Yes! We partner with global financial institutions to offer:
We offer 24/7 global support with:
Our plants incorporate:
Limited-Time Offer: Orders placed before Q4 2026 receive:

Or Contact Our Regional Experts:
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Tel: +86-311-81663811 | Email: gasequipment@enricgroup.com | www.enricgroupsjz.com
Mark Thompson
Production Manager, CF Industries
★★★★★ “Enric delivered our 1,000 MTPD plant 3 months ahead of schedule. Their heat recovery system cut our energy costs by 18%. Highly recommend!”
Priya Patel
Technical Director, Tata Chemicals
★★★★★ “The CCUS integration reduced our emissions by 85%, helping us meet India’s 2030 targets. Their local team provided exceptional support.”
Carlos Mendoza
Operations Manager, Grupo Fertinal
★★★★☆ “The plant’s modular design allowed us to scale up quickly. Slight delay in customs, but Enric’s team resolved it fast. Very happy overall.”
Klaus Schmidt
Purchasing Director, BASF
★★★★★ “Enric’s OEM design tailored to our green hydrogen feedstock was a game-changer. Zero downtime in 12 months of operation.”
Aisha Al-Mansoori
CEO, Gulf Ammonia Co.
★★★★★ “The ASME and DOT certifications made approval in Saudi Arabia seamless. Enric’s financing support was a huge plus.”
Senior Ammonia Process Engineer
With 25 years of experience in ammonia synthesis and pressure vessel design, Michael Chen leads R&D at Shijiazhuang Enric Gas Equipment Co., Ltd. He holds a Ph.D. in Chemical Engineering from Tsinghua University and has published 15+ papers on energy-efficient ammonia production. Michael has overseen 50+ ammonia plant projects across Asia, Europe, and the Americas, specializing in green ammonia and CCUS integration.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day