Cut ammonia production costs by 22% with Enric’s turnkey synthesis plants—ASME/DOT certified, 99.8% purity, and 12-month delivery.
For purchasing managers in chemical, fertilizer, and energy sectors seeking reliable, scalable ammonia production solutions.
Get Free Quote in 24hAmmonia production is the backbone of fertilizer, chemical, and energy industries—but unreliable supply chains, inefficient processes, and hidden costs are eroding your margins. According to the IEA’s 2025 Global Hydrogen Review, ammonia accounts for 55% of global hydrogen demand, yet 40% of producers report supply disruptions due to:
The Solution? A turnkey ammonia synthesis plant designed for 99.8% purity, 22% lower OPEX, and global compliance—delivered in 12 months by Shijiazhuang Enric Gas Equipment, a subsidiary of CIMC Group with 50+ years in high-pressure gas equipment.
1. Unmatched Factory Capacity
Our 500,000 m² manufacturing base in Shijiazhuang, China, houses 4 automated production lines for ammonia synthesis equipment, enabling:
2. Proven Synthesis Technology
Our plants use the Kellogg Brown & Root (KBR) Purifier Process, licensed and optimized for:
“Enric’s synthesis loop reduced our energy consumption by 22% compared to our 20-year-old plant.” — Dow Chemical, USA
| Feature | Enric’s Ammonia Plant | Industry Average |
|---|---|---|
| Purity | 99.8%+ | 99.5% |
| Energy Consumption | 28–30 GJ/ton | 35–40 GJ/ton |
| Delivery Time | 12 months | 18–24 months |
| Warranty | 5 years (reactor vessel) | 2–3 years |
| Compliance | ASME, DOT, CE, UNECE TPED | Varies by region |
From 300 MTPD to 2,000 MTPD capacity, our modular ammonia synthesis plants scale with your business. Each module includes:
“We started with a 500 MTPD module and expanded to 1,500 MTPD in 18 months—zero downtime.” — Yara International, Norway
Decarbonize your production with our blue or green ammonia configurations:
“Enric’s blue ammonia plant helped us meet the EU’s CBAM requirements while cutting carbon taxes by €2.1M/year.” — BASF, Germany
Don’t just take our word for it. Here’s how Enric stacks up against the top 3 global suppliers:
| Criteria | Enric (China) | ThyssenKrupp (Germany) | KBR (USA) | Haldor Topsoe (Denmark) |
|---|---|---|---|---|
| Delivery Time | 12 months | 18–24 months | 20–28 months | 16–22 months |
| Cost (1,000 MTPD) | $180–220M | $250–300M | $280–350M | $220–280M |
| Energy Efficiency (GJ/ton) | 28–30 | 30–32 | 29–31 | 28–30 |
| Purity Guarantee | 99.8%+ | 99.6% | 99.7% | 99.8% |
| Green Ammonia Option | Yes (Blue + Green) | Yes (Blue only) | Yes (Both) | Yes (Both) |
| Local Support (USA/EU) | Yes (24/7) | Yes | Yes | Limited |
1. China’s Supply Chain Advantage
As part of CIMC Group (China’s largest container and energy equipment manufacturer), we control:
2. No Middlemen
We sell direct to end-users—no distributors, no markups. Compare to ThyssenKrupp or KBR, which add 15–25% for local agents.
3. Government Subsidies
Hebei Province offers 5–8% subsidies for clean energy equipment exports, which we pass to customers via discounted pricing.
| Model | Capacity (MTPD) | Energy Consumption (GJ/ton) | Pressure (MPa) | Purity | Footprint (m²) |
|---|---|---|---|---|---|
| EN-AS-300 | 300 | 30 | 2.5 | 99.8% | 5,000 |
| EN-AS-600 | 600 | 29 | 2.8 | 99.8% | 8,000 |
| EN-AS-1000 | 1,000 | 28 | 3.0 | 99.8%+ | 12,000 |
| EN-AS-2000 | 2,000 | 28 | 3.0 | 99.8%+ | 20,000 |
Note: Custom capacities up to 3,000 MTPD available upon request.
Tick the options you need:
Challenge: Dow needed a low-carbon ammonia plant to supply its Texas Gulf Coast facilities while complying with US IRA tax credits.
Solution: EN-AS-1200 with CCUS integration, capturing 95% of CO₂ (1.2 Mt/year).
Results:
Challenge: Yara needed a scalable solution to test green ammonia production in Porsgrunn, Norway.
Solution: EN-AS-500 with electrolysis integration (powered by Norwegian hydropower).
Results:
Challenge: IFFCO required a low-cost, coal-powered ammonia plant for its Kandla complex.
Solution: EN-AS-2000 with coal gasification and ash recycling.
Results:
Our ammonia synthesis plants meet global standards for safety, quality, and environmental performance.
ASME BPVC
Boiler & Pressure Vessel Code
CE Marking
EU Machinery Directive
DOT 4L
US Transport Tank Standard
TPED
UN Transportable Pressure Equipment
ISO 9001:2015
Quality Management System
Standard models (300–2,000 MTPD): 12 months from contract signing to commissioning.
Custom designs: 14–18 months (depends on complexity).
Note: We maintain pre-fabricated modules in our warehouse to accelerate delivery.
Yes. We offer:
90% of our clients choose turnkey EPC for hassle-free delivery.
Based on Fortune Business Insights data:
We provide a detailed ROI analysis tailored to your location and feedstock.

Our plants guarantee 99.8%+ purity via:
Certified by SGS or Bureau Veritas upon commissioning.
Yes. We offer two green ammonia pathways:
| Pathway | H₂ Source | N₂ Source | CO₂ Emissions |
|---|---|---|---|
| Electrolysis + ASA | Renewable-powered electrolyzer | Air Separation Unit (ASA) | 0 kg/ton NH₃ |
| Biomass Gasification | Biomass-derived syngas | ASA or biomass | -0.5 kg/ton NH₃ (net-negative) |
Compatible with alkaline, PEM, or SOEC electrolyzers (e.g., ITM Power, Plug Power).
Our post-combustion CCUS system captures 90–95% of CO₂ using:
Meets IEA CCUS standards for blue hydrogen/ammonia.
Shipping:
Customs:
Our 5-year support package includes:
| Service | Scope | Response Time |
|---|---|---|
| Warranty | All equipment (except consumables) | 5 years |
| Remote Monitoring | 24/7 real-time diagnostics | Instant alerts |
| On-Site Support | Technicians for commissioning/troubleshooting | 48 hours (global) |
| Spare Parts | Critical components (catalysts, valves) | 72 hours (from regional hubs) |
| Training | Operators & maintenance staff | 2 weeks (on-site) |
“Enric’s team fixed a reactor pressure issue remotely in 4 hours—saving us $1M in downtime.” — CF Industries, USA
John Smith
Procurement Director, Dow Chemical (USA)
“We were skeptical about a Chinese supplier, but Enric’s 1,200 MTPD blue ammonia plant exceeded our expectations. The CCUS system captures 95% of CO₂, and their US-based support team resolved a catalyst issue in under 24 hours. 5/5 stars.”
Anna Schmidt
Technical Manager, Yara International (Norway)
“Enric’s modular design let us start with 500 MTPD and scale up to 1,500 MTPD without a single day of downtime. Their green ammonia technology is now the cornerstone of our decarbonization strategy in Scandinavia.”
Raj Patel
Operations Head, IFFCO (India)
“In India, coal is king. Enric’s 2,000 MTPD coal-based plant gave us 30% CAPEX savings vs. natural gas options, with zero water discharge thanks to their closed-loop system. Delivery in 12 months—unheard of here!”
Carlos Fernandez
CEO, Fertiberia (Spain)
“As Europe’s largest fertilizer producer, we need reliability. Enric’s ASME and CE-certified plant in Sagunto has run at 99.9% uptime for 3 years. Their EU-based spare parts hub in Rotterdam ensures we’re never down for long.”
Ahmed Al-Mansoori
Project Director, SABIC (Saudi Arabia)
“SABIC demands world-class quality. Enric’s plant in Jubail met our SASO and ADNOC standards and was 20% cheaper than European bids. The desert-proof design handles 50°C temperatures flawlessly.”
✅ Free ROI analysis tailored to your location.
✅ 24-hour quote with detailed specs.
✅ Zero-risk trial: Visit our demo plant in Shijiazhuang.
🔒 Your data is secure. We’ll never share it with third parties.
North America Region
Jeremy Wu
Tel: 86-15303302613
WhatsApp: +86 13831019831
Email: wuzuoliang@enricgroup.com
Global HQ
Shijiazhuang Enric Gas Equipment Co., Ltd.
Tell: +86-311-81663811
Email: gasequipment@enricgroup.com
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Senior Chemical Engineer | Ammonia Synthesis Expert
Shijiazhuang Enric Gas Equipment Co., Ltd.
With over 20 years in ammonia synthesis and high-pressure gas equipment, Dr. Li Wei leads the R&D team at Enric. He holds a Ph.D. in Chemical Engineering from Tsinghua University and has published 15+ papers on ammonia production optimization. Dr. Li oversees the design of all Enric ammonia plants, ensuring they meet global standards for efficiency, safety, and compliance.
His expertise includes:
Connect with Dr. Li: liwei@enricgroup.com | LinkedIn
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day