Struggling with high hydrogen fueling station costs or unreliable suppliers in the APAC market? Discover how Shijiazhuang Enric Gas Equipment Co., Ltd. delivers ASME/CE-certified, OEM/ODM hydrogen refueling equipment with 90-day delivery and 24/7 after-sales support—tailored for APAC’s booming clean energy sector.
As the APAC hydrogen fueling station market surges at a 28.5% CAGR (2025–2034) [Fortune Business Insights], now is the time to secure high-performance, compliant infrastructure.
Get a Free Quote in 24 Hours →The APAC hydrogen fueling station market is growing at 28.5% CAGR (2025–2034), but bottlenecks persist:
Result: 65% of APAC hydrogen projects face delays (IRENA, 2025). Jump to Solution →
With 50+ years in high-pressure gas equipment and ASME/DOT/CE certifications, we deliver:
Shijiazhuang Enric’s APAC hydrogen station assembly line (ISO 9001 certified)
| Parameter | Model HFS-350 | Model HFS-700 |
|---|---|---|
| Pressure Rating | 350 bar | 700 bar |
| Flow Rate | 200–500 kg/day | 100–300 kg/day |
| Hydrogen Purity | ≥99.99% | ≥99.99% |
| Compressor Power | 15–45 kW | 30–75 kW |
| Certifications | CCC, CE, ASME | CCC, CE, ASME, DOT |
| Warranty | 2 years (extendable to 5) | |
Our stations align with regional trends:
Pro Tip: Combine with on-site PEM electrolyzers to qualify for APAC green hydrogen subsidies (e.g., India’s $2B PLI scheme).
| Feature | Shijiazhuang Enric | Western Supplier A | APAC Competitor B |
|---|---|---|---|
| Price (350 bar station) | $280,000 | $400,000 | $350,000 |
| Lead Time | 90 days | 240 days | 180 days |
| APAC Certifications | CCC, PESO, CE | CE only | PESO only |
| Local Support | Multilingual engineers + regional warehouses | Remote only | Limited to 1 country |
| Customization | OEM/ODM (no MOQ) | MOQ 5+ units | MOQ 3+ units |
Why Choose Us? We’re the only supplier offering all four of your priorities: Price + Speed + Compliance + Service.
Project: 50 stations for Shanghai–Hangzhou hydrogen corridor (2024).
Result: 22% cost savings vs. European suppliers; 6-month delivery for all units.
“Enric’s CCC-certified stations met Sinopec’s strict safety standards—zero incidents in 12 months.” — Chen Wei, Sinopec Procurement
Project: 700 bar stations for Hyundai N Vision hydrogen trucks (2023).
Result: CE/KOLAS dual certification achieved in 45 days; 35% faster refueling vs. competitors.
“The OEM design allowed seamless integration with our trucks.” — Park Min-ho, Hyundai R&D
Project: PESO-approved pilot station in Delhi (2025).
Result: First 350 bar station in India with 99.999% purity; 40% lower capex.
“Enric’s local warehouse in Mumbai cut our lead time from 6 to 3 months.” — Rajiv Sharma, IOC
A: 90 days for standard 350/700 bar stations. Custom OEM/ODM projects take 120–150 days (vs. 6–12 months from Western suppliers).
A: Yes. We handle design, manufacturing, certification, delivery, and commissioning. Optional: electrolyzer integration or solar/wind hybrid systems.
A: Absolutely. Pre-certified for:
Need a specific certification? Ask us—we’ve secured 50+ global accreditations.
A: 2 years standard (extendable to 5 years). Includes 24/7 remote monitoring and on-site repairs within 48 hours (APAC regions).
A: Yes. Our stations are tested for:
A: Multi-stage filtration:
Meets SAE J2601 for fuel cell vehicles.
A: Flexible options for APAC clients:
A: Yes! We provide:
Example: India’s PLI scheme offers $2B for green hydrogen projects.

Procurement Manager
“Enric’s CCC-certified stations were 22% cheaper than European options, with zero compliance issues. Their 6-month delivery for 50 units kept our hydrogen corridor project on schedule.”
✅ Verified Purchase: 50 x HFS-350 Stations (2024)
R&D Engineer
“The OEM design allowed seamless integration with our N Vision hydrogen trucks. Their KOLAS/CE dual certification saved us 3 months of testing.”
✅ Verified Purchase: 20 x HFS-700 Stations (2023)
Project Lead
“First PESO-approved 350 bar station in Delhi. Enric’s Mumbai warehouse cut our lead time from 6 to 3 months—critical for India’s 2025 green hydrogen targets.”
✅ Verified Purchase: 5 x HFS-350 Stations (2025)
Technical Director
“Their tropicalized stations handled Myanmar’s humidity and monsoon seasons flawlessly. The 99.999% purity met our fuel cell bus fleet requirements.”
✅ Verified Purchase: 8 x HFS-350 Stations (2024)
Infrastructure Lead
“Vingroup’s electric taxi fleet needed reliable hydrogen infrastructure. Enric’s turnkey solution included training for our local team—no downtime in 18 months.”
✅ Verified Purchase: 12 x HFS-350 Stations (2023–2024)
Join 50+ APAC clients who’ve cut costs by 30% and accelerated deployment with Shijiazhuang Enric.
Limited-Time Offer: Free feasibility study for projects >10 stations ($5,000 value).
✅ Risk-Free: 2-year warranty + money-back guarantee on defects.
✅ Fast-Track: 90-day delivery for standard models.
✅ Compliance: Pre-certified for CCC, CE, PESO, DOT.
📍 Factory Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day