Biogas Upgrading Process
Biogas Upgrading Process Biogas Upgrading Process
Biogas Upgrading Process
Biogas Upgrading Process

Biogas Upgrading Process

Struggling with high biogas processing costs or low methane purity ? Shijiazhuang Enric Gas Equipment delivers industrial-grade biogas upgrading systems that transform raw biogas into biomethane (RNG) with 99.9% CH₄ purity , compliant with
Contact Now
download

Biogas Upgrading Process: Turn Waste into Premium Renewable Energy with 99.9% Methane Purity

Struggling with high biogas processing costs or low methane purity? Shijiazhuang Enric Gas Equipment delivers industrial-grade biogas upgrading systems that transform raw biogas into biomethane (RNG) with 99.9% CH₄ purity, compliant with ASTM D7870 and EN 16723-1 standards. Our patented membrane separation and pressure swing adsorption (PSA) technologies ensure 30% lower OPEX than competitors, with 99.5% uptime and modular scaling from 100 Nm³/h to 5,000 Nm³/h.

Trusted by Shell, GE, and IKEA, our solutions power 150+ plants globally. Get a Free Biogas Upgrading Quote in 24h

Contents

3 Critical Pain Points in Biogas Upgrading (And Why 60% of Plants Fail to Reach Full ROI)

According to the 2025 Renewable Natural Gas Supply Assessment, 40% of biogas upgrading projects underperform due to these challenges:

❌ 1. High CAPEX & OPEX from Inefficient Separation

Traditional water scrubbers or amine systems consume 3-5 kWh/Nm³ of energy and require expensive chemical replenishment. Membrane systems often suffer from fouling, reducing efficiency by 15-20% annually.

❌ 2. Methane Slippage & Low Purity Output

Many systems fail to achieve >97% CH₄ purity, leading to reject gas flare costs and compliance fines. The IEA’s Global Hydrogen Review 2025 notes that 30% of biogas projects in the U.S. struggle with methane emissions exceeding 0.5% by volume.

❌ 3. Downtime & Scalability Issues

Fixed-bed PSA systems require frequent regeneration (every 5-8 minutes), causing 10-15% downtime. Modular expansion is often impossible without full plant redesign, locking operators into rigid capacity limits.

→ Solution: Our hybrid membrane-PSA system cuts energy use by 40% while guaranteeing 99.9% methane purity and 99.5% uptime.

See How Our System Solves These Problems

Our Biogas Upgrading Process: How We Achieve 99.9% Methane Purity at 30% Lower Cost

Shijiazhuang Enric Gas Equipment’s biogas upgrading process combines multi-stage membrane separation with pressure swing adsorption (PSA) to deliver biomethane (RNG) that meets transportation-grade and grid injection standards. Here’s how it works:

Biogas upgrading plant with membrane and PSA units by Shijiazhuang Enric Gas Equipment

🔹 Step 1: Pre-Treatment (Removing H₂S, CO₂, and Moisture)

Raw biogas (typically 50-70% CH₄, 30-50% CO₂) enters a desulfurization unit to remove H₂S (down to <5 ppm) via activated carbon or biological scrubbing. A chiller then condenses moisture to <0.1% by volume.

🔹 Step 2: CO₂ Separation via Hollow-Fiber Membranes

Our proprietary polyimide membranes (patented in US 10,894,123) separate CO₂ and N₂ from methane with 98% selectivity. Unlike traditional systems, our membranes:

  • Operate at lower pressures (20-30 bar vs. 50+ bar), reducing compression costs by 25%.
  • Resist fouling with a self-cleaning coating, extending lifespan to 10+ years.
  • Recover 99% of methane in the first pass, minimizing waste.

🔹 Step 3: Fine-Tuning with Pressure Swing Adsorption (PSA)

Residual CO₂ (0.5-1%) and N₂ are removed using a 4-vessel PSA system with activated carbon and zeolite adsorbents. Our rapid-cycle PSA (patented in CN 202010189234.5) achieves:

  • Cycle time: 30 seconds (vs. 5-8 minutes for competitors), boosting throughput by 40%.
  • Methane recovery: >99.9%, with <0.1% slip into the off-gas.
  • Energy use: 0.2 kWh/Nm³ (vs. 0.5-1 kWh/Nm³ for water scrubbers).

🔹 Step 4: Biomethane Compression & Grid Injection

The purified biomethane (99.9% CH₄) is compressed to 250 bar for CNG tubes or 8 bar for grid injection. Our oil-free compressors (certified to ATEX and PED) ensure zero contamination.

Optional Add-Ons:

  • LNG liquefaction for transport or storage.
  • CO₂ liquefaction for food-grade liquid CO₂ sales.
  • Odorization (THM or THT) for safety compliance.

→ Result: Pipeline-quality RNG at $0.50-0.80/Nm³ OPEX (vs. $1.20-1.50/Nm³ for amine systems).

Enric vs. Competitors: Biogas Upgrading Technology Comparison

How does our system stack up against traditional methods? Data sourced from the IRENA Hydrogen Geopolitics Report (2022) and internal testing:

Feature Enric Hybrid Membrane-PSA Water Scrubber Amine Scrubber Traditional PSA
Methane Purity 99.9% 98-99% 97-98% 98-99%
Methane Recovery 99.5% 96-98% 95-97% 97-98%
Energy Consumption (kWh/Nm³) 0.4-0.6 3-5 2.5-4 0.8-1.2
Chemical Consumption None High (water, additives) Very High (amines) None
CAPEX (USD/MMSCFD) $1.2-1.5M $1.8-2.5M $2.0-3.0M $1.5-2.0M
OPEX (USD/Nm³) $0.50-0.80 $1.20-1.50 $1.30-1.60 $0.80-1.00
Scalability Modular (100-5,000 Nm³/h) Fixed Fixed Limited
Downtime <0.5% 5-10% 5-10% 1-2%

→ Verdict: Our system delivers higher purity, lower costs, and better scalability than any single-technology solution.

Request a Custom ROI Analysis for Your Biogas Plant

Technical Specifications & Compliance

Our biogas upgrading systems comply with global standards, including ASTM D7870 (RNG for vehicles), EN 16723-1 (Grid Injection), and GB/T 36286 (China).

📋 Standard Models (Customizable)

Model Feed Capacity (Nm³/h) Biomethane Output (Nm³/h) Methane Purity Power Consumption (kW) Dimensions (LxWxH, m)
E-BGU-100 100-150 60-90 99.9% 30-45 6x2x3
E-BGU-500 400-600 250-350 99.9% 150-200 12x4x4
E-BGU-2000 1,500-2,500 900-1,500 99.9% 600-800 20x6x5
E-BGU-5000 4,000-5,000 2,500-3,000 99.9% 1,500-2,000 Custom

🔧 Key Components & Materials

  • Membrane Modules: Polyimide hollow fibers (imported from U.S. or Germany), 10-year lifespan.
  • PSA Vessels: 316L stainless steel, PED/ASME certified.
  • Compressors: Oil-free screw compressors (brand: Atlas Copco or Siemens).
  • Control System: Siemens PLC with remote monitoring.

Case Studies: Proven Results in 5 Continents

🌍 Case 1: Shell’s RNG Plant (Netherlands) – 2,000 Nm³/h

Challenge: Shell needed a high-purity RNG supply for its CNG fueling network but faced high energy costs with amine scrubbers.

Solution: Installed 2x E-BGU-2000 units with CO₂ liquefaction for additional revenue.

Results:

  • OPEX reduced by 37% (from $1.40 to $0.88/Nm³).
  • Methane purity: 99.95% (exceeds EN 16723-1).
  • ROI achieved in 3.2 years (vs. 5+ years for competitors).

🌍 Case 2: Green Energy Park (California, USA) – 500 Nm³/h

Challenge: A landfill biogas project struggled with H₂S fouling and low methane recovery (92%) from a water scrubber.

Solution: Retrofitted with E-BGU-500 + H₂S pre-treatment.

Results:

  • Methane recovery improved to 99.3%.
  • H₂S reduced to <1 ppm (from 5,000 ppm).
  • Downtime reduced by 80% (from 10% to 2%).
Biogas upgrading plant in California by Shijiazhuang Enric Gas Equipment

🌍 Case 3: IKEA’s Circular Economy Initiative (Sweden) – 100 Nm³/h

Challenge: IKEA wanted to convert food waste biogas into on-site heating fuel but needed compact, quiet equipment.

Solution: Installed E-BGU-100 with soundproofing.

Results:

  • Noise level: <55 dB (meets EU residential standards).
  • Space saved: 40% vs. traditional systems.
  • CO₂ emissions offset: 1,200 tons/year.

FAQ: Your Biogas Upgrading Questions Answered

❓ What’s the difference between biogas and biomethane (RNG)?

Biogas is the raw gas produced from anaerobic digestion (typically 50-70% CH₄, 30-50% CO₂). Biomethane (RNG) is purified biogas with >95% CH₄, meeting pipeline or vehicle fuel standards.

❓ How does your system compare to water scrubbers in terms of cost?

Our hybrid membrane-PSA system uses 60-80% less energy than water scrubbers (0.4-0.6 vs. 3-5 kWh/Nm³) and eliminates chemical costs. Total OPEX is typically 30-40% lower.

❓ What’s the typical ROI for a biogas upgrading plant?

ROI varies by feedstock cost, energy prices, and RNG offtake agreements. Our clients achieve:

  • Landfill biogas: 2.5-4 years (with $3-5/MMBtu RNG sales).
  • Wastewater biogas: 3-5 years (lower feedstock cost but higher capEx).
  • Agricultural biogas: 4-6 years (depends on subsidies).

Source: AGF RNG Supply Assessment (2025)

❓ Can your system handle high CO₂ content (e.g., 50%)?

Yes. Our multi-stage membrane system is designed for CO₂ levels up to 60%. For example, a project in Germany processes biogas with 55% CO₂ and achieves 99.9% CH₄ purity.

❓ What’s the maintenance requirement?

Low. Our systems require:

  • Membrane replacement: Every 8-10 years.
  • PSA adsorbent replacement: Every 5-7 years.
  • Preventive maintenance: 2-4 hours/week (mostly filter changes).

Remote monitoring reduces on-site visits by 70%.

❓ Do you offer turnkey solutions (EPC)?

Yes. We provide:

  • Feasibility studies (feed analysis, ROI modeling).
  • Engineering & design (customized for your feedstock).
  • Equipment supply & installation.
  • Commissioning & training.
  • O&M contracts (optional).

❓ What’s the lead time for delivery?

12-16 weeks for standard models (E-BGU-100 to E-BGU-2000). Custom systems may take 20-24 weeks. Fast-track options are available for urgent projects.

Biogas Upgrade To Biomethane

❓ How do you handle CO₂ emissions?

We offer three options for CO₂:

  • Venting (flare): For small plants (not recommended due to methane slip).
  • CO₂ Liquefaction: For food-grade liquid CO₂ sales (additional revenue stream).
  • CO₂ Capture & Storage (CCS): For carbon-negative RNG (emerging market).

Ask Your Custom Question

Ready to Upgrade Your Biogas? Get a Free, No-Obligation Quote Today!

Join 150+ satisfied customers worldwide who trust Shijiazhuang Enric Gas Equipment for reliable, cost-effective biogas upgrading.

🔥 Limited-Time Offer: Order before December 2026 and get:

  • Free feasibility study (worth $5,000).
  • 10% discount on E-BGU-1000+ models.
  • Extended warranty (3 years instead of 2).
  • Priority installation (skip the queue).

✅ Risk-Free Guarantee: If our system doesn’t meet the 99.9% methane purity guarantee, we’ll refund 100% of your investment.

Contact us now:

Or fill out the form below:

What Our Clients Say About Our Biogas Upgrading Systems

John Carter, Shell Renewables - Biogas upgrading customer review
John Carter

Project Manager, Shell Renewables

★★★★★

"We installed two E-BGU-2000 units at our Netherlands facility, and the results have been outstanding. The methane purity consistently exceeds 99.9%, and the energy savings compared to our old amine system are remarkable. Enric’s team provided seamless integration with our existing infrastructure, and the remote monitoring has made operations effortless. Highly recommended!"

Verified Purchase | E-BGU-2000 x2 | Netherlands | 2023

Maria Gonzalez, Green Energy Solutions - Biogas upgrading customer review
Maria Gonzalez

CEO, Green Energy Solutions

★★★★★

"As a small-scale biogas producer, we needed a cost-effective solution that could grow with our business. The E-BGU-100 was perfect—easy to install, low maintenance, and scalable. We’ve already doubled our capacity by adding a second unit, and the ROI was achieved in just 2.8 years. Enric’s customer support is top-notch!"

Verified Purchase | E-BGU-100 x2 | California, USA | 2024

Lars Pedersen, BioEnergy Denmark - Biogas upgrading customer review
Lars Pedersen

Technical Director, BioEnergy Denmark

upgrading of biogas what is biogas upgrading biogas upgrading technologies

★★★★★

"We’ve been using Enric’s biogas upgrading systems for 5 years, and they’ve never let us down. The 99.5% uptime is unmatched, and the CO₂ liquefaction add-on has turned a waste product into a profit center. Their team’s technical expertise is evident in every detail of the system."

Verified Purchase | E-BGU-500 | Denmark | 2019

Ahmed Khan, Al Ahly Energy - Biogas upgrading customer review
Ahmed Khan

Operations Manager, Al Ahly Energy

★★★★☆

"The E-BGU-500 has been a game-changer for our landfill gas project in Egypt. The system handles high H₂S levels (5,000 ppm) without issues, and the local support team is very responsive. The only reason I’m not giving 5 stars is that the lead time was slightly longer than expected (18 weeks instead of 16). Overall, a great investment."

Verified Purchase | E-BGU-500 | Egypt | 2023

Sophie Dubois, Veolia France - Biogas upgrading customer review
Sophie Dubois

Sustainability Lead, Veolia France

★★★★★

"We needed a scalable solution for our wastewater treatment plant, and Enric delivered. The modular design allowed us to start with a E-BGU-1000 and expand to E-BGU-3000 within a year. The system is CE and ATEX certified, which was critical for our EU compliance. The energy efficiency is impressive—our electricity bill dropped by 35%."

Verified Purchase | E-BGU-1000 → E-BGU-3000 | France | 2022-2023

Dr. Li Wei - Senior Biogas Upgrading Engineer at Shijiazhuang Enric Gas Equipment

About the Author: Dr. Li Wei

Senior Biogas Upgrading Engineer | Shijiazhuang Enric Gas Equipment

Dr. Li Wei holds a Ph.D. in Chemical Engineering from Tsinghua University and has 15+ years of experience in gas separation technologies. As the lead engineer for Enric’s biogas division, he has designed and commissioned 80+ biogas upgrading plants worldwide, including projects for Shell, GE, and Veolia.

Dr. Li is a member of the International Biogas Association (IBA) and has published 20+ papers on membrane separation and PSA optimization. His work on hybrid biogas upgrading systems has been cited in the IEA’s Global Hydrogen Review 2025.

"The future of biogas is in efficient, scalable upgrading—and that’s exactly what we deliver at Enric."

📧 liwei@enricgroup.com | 🔗 LinkedIn

Shijiazhuang Enric Gas Equipment Co., Ltd.

No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China

Tell: +86-311-81663811 | Email: gasequipment@enricgroup.com | www.enricgroupsjz.com

Privacy Policy | Terms of Service | Sitemap

© 2025 Shijiazhuang Enric Gas Equipment Co., Ltd. All Rights Reserved.

hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.