Shijiazhuang Enric Gas Equipment Co., Ltd. delivers cutting-edge BioLNG (Bio-Liquefied Natural Gas) solutions, combining 40+ years of expertise with internationally certified technology to help industries transition to renewable energy. Our systems reduce CO₂ emissions by up to 85% while ensuring seamless integration with existing LNG infrastructure.
Designed for corporate buyers, fleet operators, and industrial plants, our BioLNG equipment offers high efficiency, rapid ROI, and compliance with EU, US, and Asian regulations.
Industrial energy buyers face three critical challenges in 2026:
1. Carbon Taxes & Compliance Risks
The EU Carbon Border Adjustment Mechanism (CBAM) and US Inflation Reduction Act impose hefty penalties on fossil fuel emissions. Traditional LNG users report 12-18% cost increases from compliance alone (Source: IEA Gas Market Report 2025).
2. Volatile Pricing
LNG spot prices fluctuated between $12-$30/MMBtu in 2025 (IEA), disrupting budgeting for manufacturers, shipping, and power plants. BioLNG, derived from organic waste, offers 30% price stability via localized production.
3. Infrastructure Lock-In
Retrofitting diesel or coal systems for hydrogen costs $500,000-$2M per MW (McKinsey). BioLNG leverages existing LNG storage/tanks, requiring minimal capital expenditure.
4. ESG Pressure
68% of Fortune 500 companies now tie executive bonuses to ESG targets (PwC). Fossil LNG risks reputation damage and investor divestment.
5. Supply Chain Disruptions
Geopolitical tensions (e.g., Ukraine conflict, Red Sea crises) caused LNG shipment delays of 2-6 weeks in 2025. BioLNG enables on-site production, eliminating dependency on global shipping lanes.
6. Waste Management Costs
Landfill fees for organic waste average $50-$100/ton in the US/EU. BioLNG plants monetize this waste, turning liabilities into renewable energy assets.
→ The solution? BioLNG—cleaner, cheaper, and future-proof.
BioLNG (liquefied biomethane) is chemically identical to fossil LNG but produced from organic waste (agricultural, municipal, or industrial). It delivers:
✅ 80-90% CO₂ Reduction vs. fossil LNG (Source: IRENA Green Hydrogen Report 2024)
✅ 10-15% Lower Operating Costs (waste-to-energy subsidies + tax incentives)
✅ Drop-in Replacement for existing LNG infrastructure
✅ -120°C Storage Compatibility (no new tanks required)
✅ 20-Year Asset Lifespan with minimal maintenance
| Criteria | BioLNG | Fossil LNG | Green Hydrogen |
|---|---|---|---|
| CO₂ Emissions | Net-negative (with CCUS) | High (20-30 kg CO₂/MBtu) | Zero (but 8-12 kg CO₂/MBtu with current grid electricity) |
| Infrastructure Cost | Low (uses existing LNG systems) | High (new pipelines/tanks) | Very High ($1.5M-$3M per fueling station) |
| Energy Density | 60 MJ/kg (same as LNG) | 50-55 MJ/kg | 120 MJ/kg (but 3x storage volume at ambient pressure) |
| Production Lead Time | 12-18 months | N/A | 3-5 years (electrolyzer + renewable PPAs) |
| Feed Stock Cost | $0.50-$2.00/kg (waste-based) | $8-$20/MBtu (volatile) | $3-$6/kg (renewable electricity dependent) |
→ BioLNG wins on cost, speed, and compatibility. Hydrogen excels in long-term decarbonization but requires decades of infrastructure buildout.
Shijiazhuang Enric’s BioLNG systems integrate three proprietary advancements:
1. Cryogenic Purification (Patent No. CN10534289B)
Removes CO₂, H₂S, and moisture to 99.9% methane purity, meeting ASTM D7865 and EN 17120 standards for vehicle/industrial use.
2. Modular Liquefaction
5-50 ton/day skid-mounted units enable phased deployment. No need for multi-billion-dollar mega-plants.
Key specs:
3. Waste-To-Energy Optimization
Our AI-driven feedstock blending maximizes yield from:
✅ Heavy-Duty Transport: BioLNG trucks emit 95% less NOx than diesel (CARB 2025). Scania, Volvo, and Iveco already offer BioLNG-compatible engines.
✅ Marine Fuel: 300+ ports globally now supply LNG; BioLNG meets IMO 2050 decarbonization targets without vessel retrofits.
✅ Industrial Heat: Replaces natural gas boilers in food processing, chemicals, and glass manufacturing with zero downtime.
✅ Power Generation: BioLNG peaker plants provide dispatchable renewable energy for grid stability (vs. intermittent wind/solar).
Client: Arla Foods (Denmark) | Project: 20 ton/day BioLNG plant
Challenge: Reduce scope 1 emissions from milk transport trucks by 50% by 2030.
Solution: Enric BioLNG system processing manure from 50,000 cows.
Results (2025):
“Enric’s modular design allowed us to start small and scale. Their team handled permitting, installation, and staff training in just 14 months.” – Jens Hansen, Arla Foods Sustainability Director
❓ How does BioLNG compare to Renewable Natural Gas (RNG)?
✅ BioLNG is liquefied RNG. The key difference is storage and transport:
→ Choose BioLNG if you need portable, scalable, or high-volume renewable gas.
❓ What feedstocks can your BioLNG plants process?
✅ Our systems handle:
| Feedstock | Biomethane Yield (m³/ton) | Pre-Treatment Needed |
|---|---|---|
| Dairy Manure | 50-70 | Solids separation |
| Food Waste | 80-120 | Depackaging |
| Landfill Gas | 100-150 | H₂S removal |
| Sewage Sludge | 30-50 | Thickening |
| Agricultural Residues | 40-60 | Chopping |
→ We provide turnkey feedstock assessment to maximize your ROI.
❓ What’s the typical ROI for a BioLNG project?
✅ ROI ranges from 3-7 years, depending on:
→ Request a customized financial model for your site.
❓ Can BioLNG be used in existing LNG vehicles/engines?

✅ Yes—100% compatible. BioLNG meets the same ASTM D7865 and EN 16723-1 standards as fossil LNG. Major OEMs confirm:
→ No downtime for fleet conversions.
❓ How do you handle permitting and regulatory compliance?
✅ We provide full EPC (Engineering, Procurement, Construction) + permitting support:
Average permitting timeline: 6-12 months (varies by region).
❓ What’s the maintenance requirement for BioLNG plants?
✅ Lower than fossil LNG due to cleaner feedstock:
Maintenance Cost: 2-4% of CAPEX/year.
❓ Can you provide financing or leasing options?
✅ Yes! We partner with:
Typical Terms: 10-15% down payment, 5-8% interest.
→ Ask about our 0% down pilot program for qualified buyers.
❓ How does BioLNG perform in cold climates?
✅ Superior to diesel or hydrogen in sub-zero temperatures:
Proven in: Norway, Canada, and Russia.
Act now and receive:
✅ Free Feasibility Study (worth $15,000)
✅ Priority 2026 Delivery Slot (avoid 12-month waitlists)
✅ 10% Discount on plants ordered before December 31, 2025
✅ Free Staff Training (2-week on-site program)
Risk-Free Guarantees:
📞 Europe: Bowen Di | +86 15614368118 | dibowen@enricgroup.com | WhatsApp: +86 18132059236
📞 North America: Jeremy Wu | +86-15303302613 | wuzuoliang@enricgroup.com | WhatsApp: +86 13831019831
🌍 Global HQ: No. 169, Yuxiang Street, Shijiazhuang, Hebei, China | +86-311-81663811 | gasequipment@enricgroup.com
🔗 Website: www.enricgroupsjz.com
⏰ Only 5 priority slots remain for Q1 2026 delivery.
Rating: ⭐⭐⭐⭐⭐
“We converted 200 trucks to BioLNG in 2024. Enric’s team handled everything—from feedstock sourcing (local landfills) to driver training. Fuel costs dropped 22%, and we’re on track to hit our 2030 carbon neutrality goal 5 years early. The modular plant was up in 10 months.”
Verified Purchase: 15 ton/day BioLNG system (Houston, TX)
Rating: ⭐⭐⭐⭐⭐
“BASF’s Ludwigshafen plant now runs 30% on BioLNG for steam generation. Enric’s cryogenic purification met our 99.9% methane purity requirement—critical for our chemical processes. EU ETS savings: €8M/year. Their remote monitoring system catches issues before they happen.”
Verified Purchase: 50 ton/day BioLNG plant (Ludwigshafen, DE)
Rating: ⭐⭐⭐⭐⭐
“In India, BioLNG was 40% cheaper than diesel for our 500-truck fleet. Enric’s low-maintenance design was perfect for our rural depots. The government subsidy covered 60% of the CAPEX. We’re expanding to 5 plants by 2027.”
Verified Purchase: 10 ton/day BioLNG system (Pune, IN)
Rating: ⭐⭐⭐⭐⭐
“Our 100% BioLNG-powered distribution center in Seville reduced scope 1 emissions by 95%. Enric’s food waste-to-BioLNG solution turned our €200K/year disposal costs into €1M/year revenue. The Spanish government featured us in their 2025 Green Transition Report.”
Verified Purchase: 20 ton/day BioLNG plant (Seville, ES)
Rating: ⭐⭐⭐⭐⭐
“Haier’s Qingdao factory now uses BioLNG for 70% of its energy needs. Enric’s system integrated seamlessly with our existing CHP (Combined Heat & Power) units. Energy costs fell by 18%, and we received a ¥5M subsidy from the Shandong government. Zero operational issues in 1.5 years.”
Verified Purchase: 30 ton/day BioLNG plant (Qingdao, CN)
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day