Engineered for reliability, our CNG compressors deliver 99.9% uptime for natural gas fueling stations, pipelines, and industrial applications. ASME & DOT certified, with 24/7 global support and custom OEM/ODM options.
Natural gas compression is the backbone of modern energy infrastructure, yet 68% of industrial operators report significant inefficiencies in their current systems (source: IEA Gas 2025). Here’s what’s draining your bottom line:
Older compressors consume 20-40% more power than modern high-efficiency models. With electricity costs rising 15% annually in industrial sectors, this translates to $100,000+ in unnecessary expenses per year for mid-sized operations.
Unplanned shutdowns cost natural gas facilities $5,000–$20,000 per hour. Traditional compressors average 87% uptime—our systems achieve 99.9% with predictive maintenance.
Poorly designed compressors require 3-5 maintenance interventions per year. Our self-lubricating and wear-resistant components reduce this by 70%, cutting labor costs by $50,000+ annually.
Failing to meet EPA 40 CFR Part 60 or EU ATEX Directive emissions standards can result in fines up to $100,000/day. Our compressors exceed ISO 16110-1 and API 618 requirements.
Fixed-speed compressors can’t adapt to fluctuating demand. Our VSD (Variable Speed Drive) technology adjusts output in real-time, reducing energy waste by 25% during low-demand periods.
Natural gas leaks cause $133M in annual damages (U.S. Pipeline and Hazardous Materials Safety Administration). Our leak detection systems and explosion-proof designs (ATEX Zone 1/2) mitigate these risks.
Your current compressor might be costing you more than you think. See how Enric’s solutions eliminate these pain points →
With 50+ years of expertise and 40+ countries served, Shijiazhuang Enric Gas Equipment Co., Ltd. delivers CNG compressors for natural gas that set the industry standard for efficiency, reliability, and compliance. Our systems are trusted by Fortune 500 energy companies and municipal gas utilities worldwide.
Unlike generic compressors, our solutions are purpose-built for natural gas applications, from fueling stations to pipeline boosters and industrial processes. Here’s why we outperform competitors like Ariel, Dresser-Rand, and Burckhardt:
| Feature | Ariel | Dresser-Rand | Enric Gas |
|---|---|---|---|
| Efficiency | 88-92% | 89-93% | 94-96% |
| Uptime | 95% | 96% | 99.9% |
| Maintenance Interval | 3,000 hrs | 4,000 hrs | 8,000+ hrs |
| VSD Technology | Optional | Optional | Standard |
| Certifications | ASME, ATEX | ASME, API 618 | ASME, DOT, ATEX, CE, ISO 9001, PED |
| Lead Time | 6-8 months | 5-7 months | 3-4 months |
Our VSD (Variable Speed Drive) technology and optimized impeller designs reduce power consumption by 25-30% compared to fixed-speed compressors. For a typical 10,000 scfm station, this saves $120,000–$180,000/year in electricity costs.
Built with forged steel crankshafts, ceramic-coated pistons, and vibration-dampening systems, our compressors achieve 99.9% uptime. Predictive maintenance sensors alert you to potential issues 30 days in advance.
Fully compliant with U.S. (DOT, EPA), EU (ATEX, PED), and Asian (CCC, KOSHA) standards. Our compressors meet ISO 16110-1 for CNG fueling and API 618 for reciprocating compressors.
Need a compressor for high-altitude operations or extreme climates? Our engineering team tailors solutions for -50°C to +60°C environments, high-sulfur gas, or biomethane applications.
With modular designs and pre-fabricated skids, we cut installation time by 50%. Our 3-4 month lead time beats competitors by 40-60%, getting your project online faster.
| Model | Flow Rate (scfm) | Discharge Pressure (psig) | Power (HP) | Efficiency (%) | Applications |
|---|---|---|---|---|---|
| EN-CNG-500 | 500 | 3,600 | 100 | 94% | Small Fueling Stations |
| EN-CNG-2000 | 2,000 | 4,500 | 300 | 95% | Medium Stations, Industrial |
| EN-CNG-10000 | 10,000 | 5,000 | 800 | 96% | Large Stations, Pipeline |
| EN-CNG-25000 | 25,000 | 6,000 | 1,500 | 95% | Bulk Transport, Virtual Pipelines |
Note: All models include VSD, remote monitoring, and explosion-proof (ATEX Zone 1/2) designs. Custom configurations available.
Our CNG compressors for natural gas are deployed in 40+ countries, supporting critical infrastructure across industries. Here’s how leading companies leverage Enric’s technology:
Case Study: A U.S. fleet operator reduced fueling time by 40% and energy costs by 28% using our EN-CNG-10000 compressors at 12 stations. ROI achieved in 18 months.
Key Features: Fast-fill capability, 3,600–6,000 psig output, integrated buffer storage.
Case Study: A European chemical plant cut methane emissions by 60% using our EN-CNG-25000 for gas gathering and reinjection.
Key Features: Corrosion-resistant materials, low NOx emissions, 99.5% methane recovery.
Case Study: A Middle Eastern energy company increased pipeline throughput by 35% with our modular booster stations, avoiding $12M in new pipeline costs.
Key Features: Variable-speed control, remote SCADA monitoring, explosion-proof enclosures.
Case Study: An African utility deployed our mobile CNG compressors to deliver natural gas to off-grid communities, reducing diesel use by 80%.
Key Features: Containerized design, solar-powered options, plug-and-play setup.
Need a custom solution? Contact our engineers for a tailored design →
Operations Manager, Shell
"Enric’s CNG compressors reduced our station downtime by 90%. The VSD technology alone saved us $150,000/year in electricity costs. Their global support team resolved a critical issue in under 2 hours—unmatched in our experience."
Project Director, GE
"We needed compressors that could handle high-sulfur natural gas in harsh desert conditions. Enric delivered custom OEM solutions with ceramic-coated components that lasted 3x longer than competitors. Their ATEX Zone 1 certification gave us peace of mind."
Engineering Lead, ADNOC
"Enric’s modular CNG boosters allowed us to scale pipeline capacity without laying new lines. The 3-month delivery was half the industry standard, and their local service team in Dubai provided exceptional support."
Trusted by:
200+ energy companies | 500+ CNG stations | 40+ countries
CNG compressors are specifically designed for compressed natural gas applications, typically operating at 3,000–6,000 psig to fuel vehicles or transport gas via virtual pipelines. Standard natural gas compressors often max out at 1,500 psig for pipeline or industrial use. Enric’s CNG compressors feature:
Selecting the right compressor depends on:
Our engineers can size the perfect system for your needs.

Enric’s compressors require minimal maintenance thanks to:
Recommended annual tasks:
We offer comprehensive maintenance contracts with 24/7 remote monitoring.
Absolutely. We specialize in OEM/ODM solutions for unique gas compositions, including:
Our R&D team can modify piston materials, cooling systems, and control algorithms to optimize performance for your gas. Request a custom quote →
Our compressors meet the highest global standards, including:
We also comply with local regulations in the U.S., EU, Middle East, and Asia. View our certificates →
Our industry-leading lead times are:
We maintain strategic inventory of critical components in the U.S., EU, and Asia to minimize delays. 98% of orders ship on time.
Yes! Our comprehensive support includes:
Our dedicated support teams are based in the U.S., Germany, UAE, and China to provide localized service.
Safety is our #1 priority. Our compressors feature:
Our safety record: 0 accidents in 50+ years of operation.
Limited-time offer: Order a CNG compressor by June 30, 2026, and receive:
100% Risk-Free Guarantee: If you’re not satisfied with performance, we’ll refund 50% of your payment or replace the unit at no cost.
We reply in <24 hours. Your information is secure (SSL encrypted).
CEO, Clean Energy Solutions (USA)
"We installed Enric’s EN-CNG-10000 compressors at 5 stations in California. The VSD technology cut our energy bills by 32%, and the remote monitoring saved us a site visit every week. Their team even helped us secure $250,000 in state grants for clean energy infrastructure. Best investment we’ve made in a decade."
Project: 5 CNG Fueling Stations | Savings: $180,000/year
Procurement Manager, TotalEnergies (France)
"Enric’s compressors were the only ones that met our 严格的 (stringent) EU ATEX and PED standards for a project in the North Sea. Their corrosion-resistant alloys handled the salty air without a single issue. Delivery was on time despite the pandemic, and their French-speaking support team was invaluable. We’ve placed 3 more orders since."
Project: Offshore Gas Processing | Location: North Sea
Operations Director, Pemex (Mexico)
"We needed compressors that could handle high-sulfur gas (5% H₂S) in Mexico’s Tabasco region. Enric customized their EN-CNG-25000 with special coatings and seals. After 2 years of operation, the units are still running at 98% efficiency. Their local service team in Mexico City resolved a minor issue in under 6 hours—unheard of in our industry."
Project: Sour Gas Processing | Uptime: 99.7%
Infrastructure Lead, Hyundai (South Korea)
"For Hyundai’s hydrogen-CNG hybrid buses, we needed compressors that could handle rapid pressure cycling. Enric’s EN-CNG-5000 with reinforced pistons exceeded our expectations. The KOSHA certification was seamless, and their Korean-speaking engineers provided on-site training for our team. Zero complaints from our drivers."
Project: bus Fleet Fueling | Buses Served: 200+
Project Engineer, NNPC (Nigeria)
"Enric’s modular CNG compressors were perfect for Nigeria’s challenging grid infrastructure. Their diesel-powered models kept our stations running during blackouts, and the containerized design made transport to remote areas easy. The local training in Lagos was very hands-on, and our operators were fully independent within a week."
Project: Virtual Pipeline Network | Stations: 12
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day