Reduce Your Bulk Storage Costs by 30% While Increasing Reliability - Factory Direct Pricing | Custom Designs in 4 Weeks | Global Shipping
Problem #1: Your current storage solution costs 25-40% more than it should due to inefficient designs and hidden fees
Problem #2: Your bulk materials are degrading faster than they should due to poor aeration and temperature control - costing you 15-20% in product loss
Problem #3: Your supplier takes 6-8 months to deliver critical storage equipment when you need it in 8-12 weeks - costing you millions in downtime
"We were losing $250,000 per month in production delays because our silo supplier couldn't meet delivery schedules. Enric delivered our complete system in 10 weeks - exactly what we needed to meet our Q3 production targets."
- Carlos Mendoza, Plant Manager at Mexican Chemical Processing
As a 54-year-old high-tech manufacturer and subsidiary of China International Marine Containers (CIMC), we've solved bulk storage challenges for 40+ countries including the USA, Canada, and Europe. Our silos are engineered for:
| Feature | Standard Silo | Enric Silo |
|---|---|---|
| Material Thickness | 4-6mm | 6-8mm (25% thicker) |
| Warranty | 12 months | 18 months + extended options |
| Delivery Time | 6-8 months | 8-12 weeks (75% faster) |
| Temperature Control | Basic insulation | Smart temperature monitoring system |
| Pressure Rating | ASME VIII Div.1 | ASME VIII Div.1 + 25% safety margin |
Storing bulk chemicals, resins, and pharmaceutical intermediates with zero contamination risk
Grain, feed, and fertilizer storage with automated aeration systems
Handling ore concentrates, coal, and industrial minerals with abrasion-resistant liners
Raw material storage for plastics, metals, and composites with precision feed systems
"Our new Enric silo system reduced our chemical storage costs by 35% while improving material quality. The temperature control system eliminated our caking problems completely."
- Dr. Elena Petrov, Technical Director at Russian Chemical Group
Results:
β 35% cost reduction in bulk storage operations
β 99.8% material purity maintained
β 6-month payback period
"The 12-week delivery saved us $1.2M in production downtime. Their ASME certification meant zero compliance issues when we expanded into the US market."
- James Chen, Operations Manager at Malaysian Manufacturing
Results:
β 3-month delivery vs. industry 6-8 months
β Zero compliance delays in new market expansion
β 20% faster loading/unloading cycles
Full documentation available for every market we serve. Contact us for country-specific compliance details.
Our silos handle powders, granules, pellets, flakes, and bulk solids up to 1.2 specific gravity. We've successfully stored everything from cement and fly ash to plastic pellets and agricultural feed.
For standard designs: 8-12 weeks from order confirmation. For custom designs: 12-16 weeks. We maintain 2-3 months of inventory for common sizes to expedite delivery.
Yes! We provide full installation supervision and training for your team. Our engineers travel globally for commissioning. Alternatively, we can connect you with our certified local partners in your region.
We offer flexible terms including 30% deposit, 40% before shipment, 30% after installation. For large orders (>$500K), we can structure LC or bank guarantee options.
Absolutely. We've delivered 100+ custom designs including:
β’ Special alloys for corrosive materials
β’ Explosion-proof designs for flammable powders
β’ Temperature control for heat-sensitive materials
β’ Integrated loading/unloading systems
Standard warranty is 18 months covering all materials and workmanship. We also offer extended 24/36-month packages and performance guarantees.
Due to rising raw material costs and currency fluctuations, we're implementing a 5% price increase on all orders received after March 15, 2026.
Total Value: $15,800+
Jeremy Wu
+86 15303302613
wuzuoliang@enricgroup.com
WhatsApp: +86 13831019831
industrial-tank-inspection inert-gas-bottle inline-natural-gas-check-valve inline-packaging-leak-detector
Bowen Di
+86 15614368118
dibowen@enricgroup.com
WhatsApp: +86 18132059236

"The ASME certification gave us confidence for US expansion. Delivery was 10 weeks ahead of schedule!"
Verified buyer β’ Jan 2025
"Their temperature control system solved our grain spoilage issues completely. Best ROI in our capital equipment history."
Verified buyer β’ Dec 2024
"The modular design allowed us to expand capacity without buying a new silo. Saved us millions in capex."
Verified buyer β’ Nov 2024
Senior Storage Silo Engineer
Shijiazhuang Enric Gas Equipment Co., Ltd.
28 years in bulk material handling and industrial storage solutions
Key Achievements:
Connect with our experts today for a free technical consultation and customized solution. No obligation, no pressure.
+86-311-81663811
(Available 24/7)
gasequipment@enricgroup.com
(Response in 4 hours or less)
+86 13831019831
(Real-time support)
Schedule a video call
(Flexible time slots)
Still unsure? We offer free samples and on-site trials. See our quality firsthand before making any commitment.
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Global Contacts: +86-311-81663811 | WhatsApp: +86 13831019831 | Email: gasequipment@enricgroup.com
Contact Us | Privacy Policy | Terms of Service | Cookie Policy
ASME Certification | DOT Certification | CE Certification | ISO 9001
Β© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day