β± 30-Day Delivery Guarantee | π +86-311-81663811 | π§ gasequipment@enricgroup.com
π Serving USA/EU Markets with ASME/DOT Certified LNG Storage & Transport Equipment
With our ASME/DOT-certified Kenai LNG plants, achieve same-day delivery of industrial-grade LNG storage systems while cutting procurement costs by up to 30% compared to EU suppliers.
Our modular Kenai LNG processing plants arrive pre-assembled with turnkey installationβno delays from complex site preparation.
Serving the USA, EU, Russia, Nigeria, and beyond with localized compliance solutions for LNG transport and storage equipment.
European suppliers charge β¬450-650/mΒ³ for standard LNG storage tanks. Our Chinese-manufactured solutions deliver identical ASME/DOT specifications at 30-40% lower cost.
"Paying β¬180,000 for a 100mΒ³ tank that should cost β¬120,000 isn't sustainable for our Q2 budget." - German LNG Terminal Operator
EU fabricators quote 24-48 weeks for delivery. Our pre-certified modular plants ship in 8-12 weeks with on-site installation in 30 days.
"Our expansion needed LNG capacity in 6 months. The supplier we chose delayed us 4 times." - US Chemical Plant Manager
Navigating DOT 49 CFR Part 178 and EN 13445 requires dedicated compliance teams. We provide pre-approved designs with all certifications included.
"The CE marking process cost us β¬85,000 in external consultants. Your team handled everything internally." - Polish LNG Distributor
Standard containers face 200% surcharges for LNG equipment. Our flat-rack solutions reduce shipping costs by 40% while protecting sensitive instrumentation.
"The shipping quote from Hamburg to Houston was β¬22,000. Your solution? β¬13,500 flat." - Nigerian Energy Company
EU suppliers charge β¬150-200/hour for on-site support. Our lifetime technical team provides 24/7 remote diagnostics + 48-hour on-site response.
"Our previous vendor took 5 days to respond to a pressure gauge failure. Your engineer was on-site in 36 hours." - Romanian LNG Station
| Parameter | Model K-100 | Model K-250 | Model K-500 |
|---|---|---|---|
| Capacity (mΒ³) | 100 | 250 | 500 |
| Operating Temp (Β°C) | -162 | -162 | -162 |
| Max Pressure (bar) | 10 | 10 | 10 |
| Vapor Return (%/day) | 0.03 | 0.04 | 0.05 |
| Weight (kg) | 42,000 | 98,000 | 185,000 |
ASME Section VIII Div.1
Boiler & Pressure Vessel Code
DOT 49 CFR Part 178
LNG Transport Regulations
CE Marking
EU Pressure Equipment Directive
FDA-Compliant Materials
For Food-Grade LNG Applications
RoHS Certified
Restriction of Hazardous Substances
Challenge: Needed 500mΒ³ LNG storage with -162Β°C operation for marine fuel applications.
Solution: Our K-500 model with double-wall vacuum insulation and vapor recovery system.
Results:
"Without your solution, we would've missed our Q3 2025 bunkering license deadline." - Port Authority Engineer
Challenge: Required LNG storage for hydrogen liquefaction pre-cooling system.
Solution: Custom K-250 with cryogenic pump integration and smart monitoring.
Results:
"The system integration with your LNG plant saved us β¬450,000 in R&D costs." - Dutch Energy Company
Challenge: Needed ruggedized LNG storage for 100% off-grid power generation in tropical climate.
Solution: K-100 with corrosion-resistant coating and elevated design for flood protection.
Results:
"The equipment arrived pre-assembled. We connected power and gas in 3 days." - Nigerian Utility Company
Challenge: Required LNG storage for heavy-duty truck refueling in -35Β°C climate.
Solution: K-50 with pre-heating system and remote monitoring.
Results:
"Our competitors couldn't guarantee operation below -25Β°C. Your solution handles -40Β°C." - Russian Logistics Company
Standard models (K-50 to K-500): 8-12 weeks from order confirmation to delivery
Custom projects (1,000mΒ³+): 16-24 weeks depending on specifications
Installation guarantee: 90 days for turnkey projects
Yes! All Kenai LNG Plants include:

We provide these documents electronically within 48 hours of order confirmation.
10-Year Limited Warranty on all Kenai LNG Plants:
lake-charles-lng-company intraco-lpg large-gasoline-storage-tank ing-trailers
Extended warranty options: Available for purchase covering years 11-20 at 30% discount.
We offer three shipping solutions for Kenai LNG Plants:
Included in all quotes: Customs clearance, export documentation, and port handling fees.
Absolutely! Our OEM/ODM services include:
MOQ: 5 units for OEM orders (negotiable for strategic partners)
Flexible payment terms for Kenai LNG Plant orders:
All payments: Via T/T to our bank account in Shijiazhuang, China.
Our quality process includes:
Certification partners: ABS, DNV, CCS, or equivalent for your market.
Yes! Our installation packages include:
Travel & Accommodation: Included in installation package for distances <300km from port.
Get a custom quote within 24 hours for your specific LNG requirements
+86-311-81663811Send us your technical specifications for detailed analysis
gasequipment@enricgroup.comβ οΈ Only 12 units available at this price point!
Prefer to schedule a call? Click here to select a time slot.
LNG Terminal Operations Manager
E.ON Energy Solutions, Germany
"The K-250 model exceeded all expectations. We've reduced our LNG boil-off by 42% compared to our previous European supplier's tanks. The turnkey installation saved us 3 months of site work. For any terminal operator considering cost-effective LNG storage, this is the solution."
"Received our first shipment in 11 weeks - beating their promise by 1 week. Installation was flawless."
Supply Chain Director
Gazprom Logistics, Russia
"Operating in -35Β°C environments, most equipment fails within 6 months. Your K-50 with pre-heating system has been running at 99.7% uptime for 18 months. The local service network you provided was a game-changer for our maintenance costs. For Russian market conditions, this is the most reliable solution we've found."
"Your team handled GOST certification internally - something our previous suppliers took 5 months to complete."
Project Manager
Nigerian Gas Distribution, Nigeria
"Your K-100 solution arrived completely pre-assembled. We connected it to our pipeline and had LNG flow within 72 hours. The corrosion-resistant coating has held up perfectly in our tropical coastal environment. For off-grid applications in Africa, this is the most cost-effective solution we've evaluated."
"Your local distributor provided same-day service when we had a pressure gauge issue - something impossible with European suppliers."
Technical Director
Hydrogen Solutions France
"Integrating LNG storage with our hydrogen liquefaction system was complex. Your team provided the custom K-250 with cryogenic pump integration that perfectly matched our specifications. The smart monitoring system reduced our maintenance visits by 60%, and CE certification came through in half the time quoted by EU fabricators. For green hydrogen projects, this is the most cost-competitive solution we've found."
"Your documentation was so complete that our insurance company reduced our premiums by 15%."
Our Kenai LNG Plants have been recognized by industry leaders for innovation and value:
With over 50 years of experience in gas equipment manufacturing and 20+ years in international markets, Shijiazhuang Enric Gas Equipment Co., Ltd. delivers:
ASME/DOT/CE certified designs with 30-year lifespan
8-12 weeks vs. 6-12 months from competitors
30-40% cost savings vs. EU/US suppliers
Β© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
Privacy Policy | Terms of Service | Quality Policy | Sustainability Report
Shijiazhuang Enric Gas Equipment Co., Ltd. is a subsidiary of China International Marine Containers (Group) Co., Ltd.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day