ASME/DOT-Certified Solutions for Heavy-Duty Trucks, Ships, and Rail Systems - Free Customization Consultation
Diesel prices surged 220% in 5 years, while LNG costs remained stable at $0.45/L (vs. diesel at $1.20/L). Here’s what’s driving the shift:
🔧 Action Step: Download our LNG Conversion ROI Calculator to see your fleet’s 3-year savings.
We design, manufacture, and certify LNG systems for trucks, ships, and rail under ASME Section VIII, DOT 49 CFR, and EU 2014/90/EU. Here’s what sets us apart:
ASME,
DOT,
CE,
EPA.
| Feature | Diesel | CNG | LNG (Ours) |
|---|---|---|---|
| Energy Density (MJ/L) | 38 | 9 | 25 |
| Range (km) | 800 | 350 | 1,200 |
| CO₂ Emissions (g/km) | 270 | 180 | 120 |
| Fuel Cost ($/L) | 1.20 | 0.75 | 0.45 |
| Maintenance Interval (km) | 300,000 | 350,000 | 450,000 |
For fleets >50 trucks, payback averages 18 months with diesel at $1.20/L and LNG at $0.45/L. Use our ROI calculator for your specific scenario.
Yes! We offer retrofit kits for Cummins ISX12N, Volvo D13, and Scania DC13 engines. Installation takes 3-5 days with no chassis modifications.
We partner with 350+ LNG stations globally. For remote routes, we provide mobile refueling units or on-site liquefaction (24h turnaround).
liquefied-natural-gas-cost liquefaction-of-natural-gas-methods lake-charles-lng-company liquefaction-plant-lng
Absolutely. Our tanks meet EN 13445-3 and ASME Section VIII standards. The boil-off rate is <0.3%/day, and our systems include double-wall insulation and pressure relief valves.
5-year warranty on tanks, 24/7 emergency support, and annual maintenance contracts. Our global service network covers 42 countries.
Yes! We offer -40°C to 50°C operating ranges with heated vaporizers for cold climates and heat-resistant coatings for desert operations.
We partner with 14 leasing companies offering 0% APR for 36 months on fleets >20 units. Ask about our EU Green Deal grants (covers up to 40% of costs).

We maintain 48-hour delivery for critical parts via DHL/FedEx in 92% of global markets. For remote areas, we stock local distributors in 23 countries.
“The Enric team provided end-to-end support—from engineering to installation. Our drivers love the quieter cabins and zero black smoke.”
— Maria Santos, Fleet Manager, TransPortes Chile
“Compliance was seamless. Their CE and DOT certifications saved us 18 weeks in permitting.”
— Johan de Vries, Technical Director, Van der Meer Shipping (Netherlands)
“After-sales support is 24/7. Their engineer flew to Lagos to fix a vaporizer issue—same-day.”
— Amina Okoro, Operations Head, Nigerian Gas Logistics
🔥 $2.1M in EU Green Deal Grants Available – Only 37 spots left for 2026 shipments.
Risk-Free Guarantee: 100% refund if delivery is delayed beyond 180 days. Free samples available for testing.
© 2025 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
Privacy Policy | Terms of Service | Compliance Certifications
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Industry Leaders Worldwide
Our systems power fleets across 42 countries. Here’s what partners say:
“Switching to LNG cut our fleet’s fuel bill by 37% in 12 months. The Enric system’s modular design saved us $180,000 in retrofit costs.”
— Transport Manager, DHL Germany
“Enric’s tanks maintained -162°C for 8 days during our 2025 heatwave. No other supplier could guarantee this.”
— Fleet Director, NYK Line (Japan)
Certifications That Matter