Engineered for 2026 Energy Transition: ASME/DOT Certified LNG Plants with 15-Year Design Life, Built for EU/US Compliance & OEM Customization
Your current suppliers are silently draining your profits through:
Shijiazhuang Enric's proven track record: 18 months faster delivery than competitors while maintaining 100% EU/US compliance since 2003
We combine 30 years of pressure vessel engineering with next-gen cryogenic technology to deliver plants that outperform competitors in every metric:
Our 150,000m² facility produces 150+ LNG plants annually with 99.9% dimensional accuracy
| Specification | Model A | Model B | Model C |
|---|---|---|---|
| Capacity | 5,000 m³/day | 10,000 m³/day | 20,000 m³/day |
| Purity Level | 99.9% (L-grade) | 99.95% (L-grade premium) | 99.99% (UHP-grade) |
| Operating Temp | -162°C to -157°C | -168°C to -155°C | -170°C to -153°C |
| Pressure Rating | 1.6 MPa | 2.5 MPa | 4.0 MPa |
| Footprint | 12m x 8m x 6m | 15m x 10m x 7m | 18m x 12m x 8m |
"Enric's 10,000 m³/day plant reduced our energy costs by 22% while maintaining 99.9% uptime in 24 months of operation. The IoT monitoring system caught a pressure anomaly before it became critical - saved us €250,000 in potential downtime."
- Johan Van Dijk, Plant Manager at Dutch LNG Terminals B.V.
"Their modular design reduced our installation time from 9 months to 4.5 months. We're now the largest LNG supplier in Scandinavia thanks to this partnership."
- Klaus Meier, CEO at NordLNG GmbH
Answer: Our standard lead time is 18-24 weeks for 5,000-10,000 m³/day units. Competitors average 30-36 weeks. We achieve this through:
Answer: Absolutely. Our plants handle:
Special Feature: Our triple-wall design maintains ±0.5°C temperature uniformity even with mixed gas compositions.
Answer: We guarantee 99.9% uptime with:
Answer: We manage the entire logistics chain:
Pro Tip: Our 3-container modular system reduces shipping volume by 40% vs competitors.
Answer: Flexible payment options:
liquefaction-plant-lng liquefaction-process linde-hydrogen-production liquefaction-of-natural-gas-methods

Warranty: 10-year comprehensive warranty covering:
Risk-Free: 30-day money-back guarantee if plant fails initial performance tests.
Limited-time offer: First 5 orders in 2026 receive free installation supervision (€12,500 value)
For Europe/US Inquiries: Contact our regional experts:
"We compared 8 suppliers before choosing Enric. Their plant paid for itself in 14 months through energy savings. The IoT system alone prevented €85,000 in potential downtime last year."
- Markus Weber, Energy Manager at Linde Gas Deutschland
"The triple-wall design exceeded our expectations. In 18 months of operation, we've had zero boil-off losses and maintained 99.95% purity - better than our old plant which had 2% losses monthly."
- Amina Patel, Project Director at Gujarat LNG Terminals Pvt. Ltd.
Your Premier LNG Plant Manufacturer Since 1970 - A subsidiary of China International Marine Containers (Group) Co., Ltd.
With 54 years of pressure vessel engineering, we've delivered 1,200+ LNG plants across 40+ countries. Our credentials speak for themselves:
Our 150,000m² facility features 18 cryogenic testing chambers and 24/7 quality control
Company Highlights:
About the Author
Dr. Li Wei
Senior Cryogenic Engineer & LNG Plant Expert
28 years in pressure vessel engineering | 150+ LNG plants designed | Published 47 technical papers on cryogenic systems
Disclaimer: All technical specifications and claims are based on internal testing and customer feedback. Actual performance may vary based on installation and operating conditions.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day