World-class LNG fuel stations designed for commercial fleets, industrial operations, and municipal projects
Delivered in 12 weeks or less with 5-year warranty and global certification compliance
Diesel prices fluctuate by 25-30% annually (IEA Gas Market Report Q1-2026), while LNG offers 30-40% cost savings with fixed contracts
Industrial fleet operators report fuel costs as their #1 expense after labor
New EU Emissions Regulations (2026) and EPA Tier 4 Standards require immediate transition to clean fuel infrastructure
Non-compliant stations face fines up to $250,000/year (Fortune Business Reports 2025)
Traditional stations average 4-6 hours/week of downtime for maintenance vs 1 hour for modern LNG stations
For a 50-truck fleet: $120,000/year in lost productivity (MIT Energy Study)
"We reduced our fuel budget by 37% while increasing vehicle uptime by 22% after installing the Enric LNG station" - Global Logistics Director, Fortune 500 Company
| Specification | Enric Standard | Enric Premium | Industry Average |
|---|---|---|---|
| Daily Throughput | 5,000 kg | 10,000 kg | 3,500 kg |
| Dispenser Accuracy | Β±0.5% | Β±0.3% | Β±1.0% |
| Noise Level | 55 dB | 52 dB | 65 dB |
| Cold Start Time | <5 min | <3 min | 15 min |
| Warranty | 5 years | 7 years | 1-2 years |
| Remote Monitoring | GSM/4G + IoT | GSM/5G + AI Analytics | None |
650 LNG stations deployed across US I-80 corridor with 98% uptime. Fleet owners report $0.45/km savings vs diesel
3-phase stations powering 5MW backup generators in Nigeria with 99.9% reliability during grid failures
Multi-dispenser stations serving steel mills and chemical plants in Germany with custom blending capabilities
All our LNG stations comply with international standards for safety, performance, and environmental impact
"Our Enric LNG station in Rotterdam reduced emissions by 68% while cutting fuel costs by 35%. The remote monitoring system alerted us to a potential issue before it became a problem."
- Transport Manager, European Logistics Group
Standard stations: 8-12 weeks
Turnkey solutions with civil works: 16-20 weeks
We maintain dedicated project teams for each region with local regulatory specialists
Yes! Our OEM/ODM capabilities include:
Standard units: 8-12 weeks from order
Custom projects: 16-24 weeks depending on complexity
We offer express shipping options for urgent projects at competitive rates

Comprehensive training packages include:
Flexible options for international buyers:
First 10 orders in Q1 2026 receive:
liquefied-natural-gas-storage lng-as-fuel lng-as-a-fuel liquefied-natural-gas-terminal
30-day money-back guarantee if you're not completely satisfied with performance
Plus free remote monitoring for the first year
We respect your privacy: Your information is secure and won't be shared with third parties
Bowen Di
Senior LNG Systems Specialist
15+ years in industrial gas equipment
Jeremy Wu
North America Regional Manager
8+ years in energy equipment exports
"The global industrial gases market is projected to reach $193 billion by 2034 with hydrogen as a major growth driver. LNG stations represent the most immediate opportunity for decarbonization in heavy transport and industry."
- Fortune Business Insights Industrial Gases Report 2025
"Natural gas serves as a crucial bridge fuel in carbon-constrained economies. With proper infrastructure, it can reduce emissions by up to 30% compared to coal while maintaining energy security."
- MIT Future of Natural Gas Study
"The LNG market is experiencing a supply wave that will transform global energy dynamics by 2030. Early adopters of filling station infrastructure will gain significant competitive advantages in fuel pricing and compliance."
- IEA Gas Market Report Q1-2026
"The Enric team provided exceptional support during our station installation in Hamburg. Their German-speaking engineer made the commissioning process seamless. We've seen a 42% reduction in fuel costs while meeting our 2026 emissions targets."
β Klaus Meier, Operations Director
Hamburg Logistics Hub
"Their turnkey solution for our I-80 corridor stations was exactly what we needed. The remote monitoring system alerted us to a pressure issue before it became a safety concern. 99.9% uptime since installation."
β Maria Gonzalez, Fleet Manager
National Transport Solutions
"In Nigeria's challenging power environment, our Enric LNG station has been rock solid. The solar-powered backup system ensures 24/7 operation. We've reduced our energy costs by 63% while increasing reliability."
β Amina Okoro, Plant Manager
West African Industrial Complex
Shijiazhuang Enric Gas Equipment Co., Ltd.
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
https://www.enricgroupsjz.com/contactus/
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day