Reduce emissions by 30% while cutting fuel costs by 25% with our ASME/DOT certified LNG fuel systems. Get same-day technical consultation from our European/American experts.
Request Custom Quote in 24h Download Technical BrochureDiesel prices fluctuated between $3.80-$4.20/gallon in 2025 (EIA data). With LNG priced at $2.10-$2.50/gallon equivalent, switching could save $0.50-$0.75 per gallon.
Your risk: Over $150,000/year in avoidable fuel costs for a 100-truck fleet
EU 2035 CO₂ reduction targets and US EPA Tier 4 standards are tightening. Non-compliant fleets face fines up to €50,000 per vehicle annually in Europe.
Your risk: Potential 20% operational disruption from route restrictions in 2026
The Suez Canal crisis (2025) caused diesel shortages and 200% price spikes in some regions. LNG offers localized production potential and diversified supply chains.
Your risk: 15-20 days/year of unplanned downtime from fuel shortages
Shijiazhuang Enric Gas Equipment Co., Ltd. delivers end-to-end LNG fuel system solutions with:
Custom tank configurations from 110L to 600L with modular mounting options. Our engineering team has 20+ years of experience in cryogenic systems for heavy-duty applications.
ASME Section VIII Div.1 and DOT 4L certified manufacturing with 0.1% leak rate on pressure tests. Each system undergoes 24-hour helium leak testing before shipment.
From single-tank retrofits to multi-tank systems for 40-ton trucks. Includes:
15-day average lead time from order to shipment (vs. 45-60 days industry average). Our European warehouse (Germany) enables 7-day deliveries across EU.
24/7 technical support with 4-hour response time. Authorized service centers in Germany, USA, and UAE with 2-year warranty on all components.
Factory-direct pricing with volume discounts:
| Parameter | Enric Standard | Enric Premium | Industry Average |
|---|---|---|---|
| Tank Capacity | 110L - 600L | Custom (up to 1000L) | 150L - 450L |
| Max Working Pressure | 2.2 MPa | 2.5 MPa | 1.6 MPa |
| Evaporation Rate | < 0.3%/day | < 0.2%/day | 0.5-0.8%/day |
| Weight (Empty) | 280kg (335L) | Custom | 320kg (335L) |
| Temperature Range | -196°C to +65°C | -200°C to +70°C | -190°C to +50°C |
| Certifications | ASME VIII Div.1, DOT 4L, CE, ISO 9001 | ASME VIII Div.1, DOT 4L, CE, ISO 9001, PED | ASME VIII Div.1, CE |
Long-haul logistics fleets report 18% fuel cost savings with 20% longer engine life due to cleaner combustion. Systems designed for 40-ton payloads with 3,000km range.
Key features: Remote monitoring, automatic pressure regulation, GPS tracking integration
LNG-powered excavators and bulldozers operate in urban areas without restrictions. 35% lower noise enables 24/7 operations in residential zones.
Key features: Quick-fill connectors, cold weather performance down to -30°C, dust-proof components
Ferry operators achieve IMO 2030 compliance with 90% SOx reduction and 85% PM reduction. Systems certified for saltwater environments.
Key features: Marine-grade stainless steel, corrosion-resistant coatings, modular design for ship integration
Data center backup generators use LNG for 99.99% uptime during grid failures. 50% faster refueling than diesel systems.
Key features: Auto-switching systems, remote monitoring, 72-hour continuous operation
"The Enric system exceeded our expectations. Our maintenance costs dropped by 35% and we achieved full compliance with EU 2035 standards ahead of schedule."
Implemented: January 2025 | ROI: 12 months
"The cold weather performance is exceptional. We operate in -25°C conditions with zero downtime for fuel system issues."
Implemented: November 2024 | Savings: €280,000 annually
"The localized manufacturing in China with European quality standards gave us the best of both worlds. Delivery time was 60% faster than competitors."
Implemented: March 2025 | Scalability: 100+ units deployed
ASME Section VIII Div.1
Pressure vessel code compliance
DOT 4L
Cryogenic tank certification
CE Mark
EU market compliance

ISO 9001:2015
Quality management system
FDA Compliant
Material safety standards
RoHS
Restriction of hazardous substances
Chinese Pressure Vessel License
Domestic manufacturing approval
A: For a 100-truck fleet, payback typically occurs between 12-18 months depending on:
A: Modern LNG systems maintain performance down to -40°C with:
A: Maintenance is significantly simpler than diesel systems:
lng-filling-station lng-as-a-fuel lng-as-fuel liquefaction-plant-lng
Cost comparison: LNG systems require 40% less maintenance than diesel equivalents, saving $1,200-$1,800/year per truck.A: Absolutely. Our OEM/ODM capabilities include:
A: Our production timeline:
A: Our service network includes:
A: Flexible payment options to suit your needs:
A: Safety is our top priority with multiple layers of protection:
"The Enric system transformed our operations. We went from 20% downtime on fuel-related issues to zero in 6 months. The ROI was faster than projected, and customer service has been outstanding."
"Their engineering team solved our cold weather challenges that other suppliers couldn't. The system's performance in -30°C conditions has been exceptional. Highly recommend for European operations."
"The factory-direct pricing and customization options were exactly what we needed. Delivery was 2 weeks faster than quoted. Their attention to detail in the manufacturing process is evident."
"Their local support in Russia with Russian-speaking engineers made the transition seamless. The system's low maintenance requirements have been a game-changer for our operations."
Senior LNG Systems Engineer & Clean Energy Consultant
"The LNG fuel system market is experiencing unprecedented growth. In 2025 alone, we saw 40% YoY increase in adoption across Europe and Asia. The key drivers are:
"For fleet managers considering the switch, I recommend starting with a pilot program of 5-10 units. This allows you to validate the ROI and operational benefits before full-scale deployment. The 12-month payback is well within acceptable thresholds for most transportation businesses."
Get a custom ROI analysis for your specific fleet within 24 hours
First 10 qualified buyers receive a free sample system (110L configuration)
5% early bird discount for orders placed by March 15, 2026
Risk-Free Guarantee: 30-day money-back guarantee on all standard configurations
Free lifetime technical support and spare parts availability
We respect your privacy. Your information is secure with us.
Our team of LNG experts is ready to help with:
Available 24/7 in English, German, French, Spanish, Russian, and Chinese
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day