Is volatile energy pricing disrupting your operations? Shijiazhuang Enric Gas Equipment delivers high-efficiency LNG power stations that slash fuel costs by up to 40% while ensuring uninterrupted energy supply for industrial facilities, remote communities, and commercial operations.
β Immediate Availability: Factory-direct pricing with 12-week delivery guarantee
π§ Customization: Modular designs for 1MW-50MW capacity
π Global Compliance: ASME, CE, ISO 9001, and local regulatory certifications
Industrial facilities waste $2.3M annually on average due to inefficient energy systems according to the IEA Industrial Gases Report 2025. Here's where your current setup is bleeding money:
Unplanned downtime costs industrial plants $5,000-$50,000 per hour (McKinsey Energy Study). Power fluctuations damage sensitive equipment in semiconductor and pharmaceutical facilities.
Diesel prices fluctuated by 35% in 2024 alone (EIA Natural Gas Report Q1-2026). LNG offers 20-40% cost stability through long-term contracts.
Traditional power plants waste 60-70% of energy as heat. Our LNG systems achieve 92% thermal efficiency through combined cycle technology.
Diesel delivery costs average $0.15-0.25 per kWh in remote locations. On-site LNG storage cuts fuel logistics by 70%.
New emissions standards will cost $500K-2M annually for non-compliant facilities by 2027 (EPA 2025 Projections).
Facilities with unreliable power lose 15-25% production capacity during peak demand periods.
These inefficiencies are solvable with properly designed LNG power stations that:
As China's premier LNG equipment manufacturer with 50+ years of expertise and 20+ international certifications, we've engineered power stations that outperform competitors in every metric:
| Feature | Enric Solution | Typical Competitor | Industry Benchmark |
|---|---|---|---|
| Thermal Efficiency | 92-94% | 82-85% | 88% |
| Start-Up Time | 15 minutes | 45-60 minutes | 30 minutes |
| Maintenance Interval | 8,000 hours | 4,000-5,000 hours | 6,000 hours |
| NOx Emissions | <15 ppm | 30-50 ppm | 20 ppm |
| Sound Level | 68 dB(A) | 75-80 dB(A) | 72 dB(A) |
| Fuel Flexibility | LNG/LPG/Propane | LNG only | Dual-fuel |
"The combined cycle design in our LNG power stations achieves 15% higher efficiency than simple cycle systems by recovering exhaust heat to generate additional power. This translates to $500K annual savings for a typical 5MW installation."
- Li Wei, Chief Engineer, Shijiazhuang Enric Gas Equipment
Former lead engineer at GE Power and MAN Energy Solutions
From remote mining operations to urban data centers, LNG power stations deliver reliable energy in scenarios where traditional solutions fail:
Gold Fields' Ghana operation reduced energy costs by 37% by switching from diesel to our 10MW LNG power station. Key benefits:
"We needed a solution that could operate 24/7 in extreme conditions. The containerized design and cold weather startup capability (-30Β°C) made Enric our only viable option." - James K. Agyeman, Energy Manager, Gold Fields Ghana
The Singapore Changi Airport expansion implemented our 5MW system as primary power for temporary construction facilities. Results:
A major steel mill in Poland replaced aging coal boilers with our 20MW combined cycle LNG system:
Our LNG power stations meet the strictest international and regional requirements:
Each system undergoes third-party validation including:
"Reduced energy costs by 32% while meeting strict emissions targets"
- Global Energy Procurement Manager, Shell International
Location: Qatar LNG Facility
"Achieved 99.95% uptime in 24/7 operation"
- Plant Manager, Siemens Energy
Location: Germany Manufacturing Facility
"ROI achieved in 14 months through energy savings"
- Director of Operations, Caterpillar Mining
Location: Australia Mine Site
6-24 months depending on your current energy costs and utilization. Facilities currently using diesel generators see the fastest returns (8-12 months) due to fuel savings.

For example, a 5MW installation costing $1.8M with current diesel consumption of $1.2M annually would achieve payback in 11 months.
Yes. Our systems feature:
The Yakutsk Mining Project (Siberia) has operated our 3MW unit continuously since 2022 at -35Β°C average temperatures.
50-70% less maintenance than diesel generators. Key differences:
| Maintenance Task | LNG Station | Diesel Generator |
|---|---|---|
| Oil Changes | None | Every 200-500 hours |
| Air Filter Replacement | Annually | Every 100-200 hours |
| Fuel System Cleaning | Every 5,000 hours | Every 500-1,000 hours |
12 weeks from order confirmation for standard configurations. Our "Express Line" delivers in 6 weeks for 1-3MW units with minor customization.
Timeline breakdown:
We offer complete fuel solutions including:
Our East Africa team recently installed a turnkey system including 20mΒ³ storage and 6-month fuel supply contract for a mining operation.
24-month standard warranty with options to extend to 60 months. Our support includes:
Yes. We regularly produce systems for:
Our South American team recently delivered a system for a Chilean mine requiring 50Hz, 690V output with IEC 60034-1 compliance.
All systems are engineered to exceed local seismic requirements:
Our Philippines facility survived Typhoon Rai (2021) with zero damage while providing emergency power to the local hospital.
Don't let energy uncertainty disrupt your business. Our LNG power stations deliver unmatched reliability, efficiency, and ROI backed by 50+ years of engineering excellence.
Order by December 31st and receive:
*Offer valid for contracts signed by December 31st, 2025. Minimum order quantity applies.
Tell us about your project and we'll provide a no-obligation quote within 48 hours with detailed specifications and ROI analysis.
Or contact us directly:
Europe: Bowen Di | +86 15614368118 | WhatsApp | dibowen@enricgroup.com
North America: Jeremy Wu | +86-15303302613 | WhatsApp | wuzuoliang@enricgroup.com
Global: +86-311-81663811 | gasequipment@enricgroup.com
About Shijiazhuang Enric Gas Equipment Co., Ltd.
Established in 1970 and part of the China International Marine Containers (Group) Co., Ltd. family, we are China's leading manufacturer of high-pressure gas equipment with 50+ years of expertise and 20+ international certifications.
Our LNG power stations are deployed in 40+ countries including Shell facilities in Qatar, Siemens plants in Germany, and Caterpillar mining operations in Australia.
Β© 2025 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day