Deliver Clean Energy Solutions to Your Grid in 90 Days or Less - Free Technical Consultation & Site Assessment Available
Reduce your carbon footprint by 30-40% while maintaining energy security with our high-efficiency LNG regasification systems. Partner with China's #1 LNG equipment manufacturer with 20+ years of global export experience.
The solution? Strategic LNG import terminals that give you:
"Companies using LNG regasification saw a 23% reduction in energy price volatility compared to traditional pipeline gas supply during the 2022 energy crisis."
- Energy Market Analyst, BloombergNEF
Designed by engineers with 20+ years in LNG equipment manufacturing, our regasification systems combine German precision with Chinese manufacturing scale to deliver unmatched value.
| Parameter | Small-Scale | Medium-Scale | Large-Scale |
|---|---|---|---|
| Capacity (TPD) | 50-200 | 200-500 | 500-1,000 |
| Send-Out Pressure (bar) | 25-45 | 45-75 | 75-100 |
| Heat Transfer Medium | Propylene or Ethylene Glycol (Non-toxic, environmentally safe) | ||
| Vaporization Temperature (°C) | -162 to -1 | -162 to +10 | -162 to +25 |
| Footprint (m²) | 1,200 | 2,800 | 5,500 |
Our systems meet and exceed the strictest international standards:
Natural gas power plants are the most efficient way to integrate intermittent renewables while maintaining grid stability.
Critical for industries where consistent energy quality is non-negotiable:
Oxygen and nitrogen requirements met with on-site LNG-derived gases
Energy Savings: 22%
High-purity nitrogen for sterile environments and CO₂ for fermentation
Reliability: 99.99%
Modified atmosphere packaging and refrigeration solutions
CO₂ Savings: 35%
LNG is the most practical solution for heavy-duty transportation decarbonization today:
District heating systems using LNG regasification offer superior efficiency and lower emissions:
Client: Major European Utility Company
Challenge: Replace aging coal plants with flexible gas capacity
Solution: 500 TPD LNG regasification terminal
Results:
500+ regasification systems produced annually
#1 in China by volume, supplying 40+ countries
Standard models available in 8-12 weeks
Custom solutions in 16-20 weeks
100% OEM/ODM capabilities
Tailored to your specific gas composition and pressure requirements
Certified for USA, EU, Asia, and Middle East
Full documentation package for financing and insurance
"Shijiazhuang Enric's systems delivered 25% lower total cost of ownership compared to European alternatives while maintaining identical performance specifications."
- Procurement Director, Fortune 500 Energy Company
With current gas price differentials between regions (often $3-5/MMBtu), most projects achieve payback in 3-5 years depending on utilization rates and local energy prices.
Calculation based on: 100 TPD facility, $4/MMBtu price differential, 80% utilization, $50M CAPEX
Our systems use ORV (Open Rack Vaporizers) or SCV (Submerged Combustion Vaporizers) to safely convert LNG (-162°C) to natural gas at ambient temperatures. The process:
Our systems are designed for minimal maintenance:
Total annual maintenance cost: $50,000-150,000 depending on system size
Absolutely. Our engineering team specializes in tailored solutions for:
Standard models:
Custom solutions add 4-8 weeks depending on complexity
We manage the entire supply chain:
We stand behind our products with:
Safety is our #1 priority with multiple redundant systems:
Limited to 5 systems worldwide
Deadline: December 31, 2025
lng-regas lng-power-station liquefaction-plant-lng lng-production-worldwide
Includes:
Money-Back Guarantee
If system doesn't meet specifications, we refund 20% of contract value

Free Replacement Parts
24/7 emergency parts delivery worldwide
Certified Technician Support
Remote troubleshooting and on-site support available
John Smith
Energy Procurement Manager, European Utility
"The LNG regasification station exceeded all our expectations. The 25% cost reduction was even better than projected, and the 99.9% uptime has been critical during the recent energy crisis."
Project: 300 TPD LNG Terminal | Location: Rotterdam, Netherlands
Maria Garcia
Director of Operations, Latin American Manufacturing
"As a food processing company, reliability is everything. The constant gas supply has eliminated our production bottlenecks, and the 35% CO₂ savings helped us meet our sustainability goals ahead of schedule."
Project: 150 TPD Food-Grade CO₂ System | Location: São Paulo, Brazil
Chen Wei
Technical Director, Asian Steel Manufacturer
"The system integration was seamless. We reduced our energy costs by 22% while maintaining the same steel quality. The remote monitoring capabilities have been particularly valuable for our maintenance team."
Project: 500 TPD Steel Production Gas System | Location: Shanghai, China
James Wilson
Procurement Manager, North American Power Producer
"The 6-month faster deployment compared to pipeline alternatives gave us critical capacity during peak winter demand. The ASME certification gave our financing partners the confidence to approve our project."
Project: 400 TPD Power Generation Gas System | Location: Texas, USA
Shijiazhuang Enric Gas Equipment Co., Ltd.
With 18 years of experience in LNG equipment design and manufacturing, Li Wei has led the development of over 300 regasification systems deployed across 40+ countries.
His expertise includes:
Li Wei holds a Master's in Cryogenic Engineering from Tsinghua University and is a certified ASME Section VIII Pressure Vessel Inspector.
"The energy transition is accelerating faster than anyone predicted. LNG regasification stations provide the perfect bridge solution - combining immediate cost savings with long-term sustainability and energy security."
- Li Wei, Senior LNG Systems Engineer
Complete this short form and one of our LNG specialists will contact you within 1 business hour to discuss your project requirements:
Direct Line
+86 156 1436 8118
(Call/WhatsApp)
Email Support
gasequipment@enricgroup.com
Live Chat
Available 24/7
Our comprehensive catalog includes:
No registration required - Instant download
See our LNG regasification stations in action with a live demonstration:
Book a demo in the next 7 days and receive:
Join 400+ global enterprises who've already made the switch to cost-effective, reliable LNG solutions.
Still have questions? Contact us directly and one of our LNG specialists will respond within 1 business hour.
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
📞 +86-311-81663811 | ✉️ gasequipment@enricgroup.com
© 2025 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
Privacy Policy Terms of Service Cookie Settings
Trademarks and registered trademarks appearing on this website are the property of their respective owners.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day