Shijiazhuang Enric Gas Equipment delivers ASME/DOT-certified LNG tanks with 25-year lifespans, cutting costs by 18% for European utilities.
Key Advantages: OEM/ODM design, 30% faster delivery than competitors, global certifications (CE, ISO 9001, ASME, DOT).
🚀 Get Free Technical Consultation
Bowen Di (Europe/Global): +86 15614368118 | WhatsApp: +86 18132059236
Jeremy Wu (North America): +86 15303302613 | WhatsApp: +86 13831019831
Email Now →The global LNG market is projected to hit $200B by 2026 (IEA, 2025), driven by:
Yet 60% of buyers struggle with:
Solution: Partner with manufacturers like Shijiazhuang Enric that combine advanced insulation, global certifications, and proven longevity.
1. Boil-Off Gas (BOG) Losses: 15-25% losses with subpar insulation (IEA, 2025). Our vacuum-insulated tanks reduce this to 0.5% annually.
2. Compliance Nightmares: Missing certifications = export bans. We hold 20+ global certifications (ASME, DOT, CE, ISO 9001).
3. Lead Times: Competitors quote 18+ months. Our modular design cuts this to 12 months.
4. Hidden Maintenance Costs: Poor welding = $50K/year in repairs. Our robotic welding ensures zero leaks for 25+ years.
5. Financing Hurdles: Banks hesitate on unproven suppliers. Our 10-year warranty and ESCO financing remove barriers.
đź’ˇ Pro Tip: Always ask for:
Founded in 1970, Enric is a subsidiary of China International Marine Containers (CIMC)—a $12B global industrial group. Our 300+ engineers design tanks for:
Why We Stand Out:
| Feature | Standard Tank | Enric Premium Tank |
|---|---|---|
| Capacity (mÂł) | 50-200 | 50-250 (customizable) |
| Boil-Off Rate (%/day) | 1.2% | 0.5% (industry best) |
| Insulation | Perlite | Multi-layer vacuum + perlite |
| Certifications | CE | CE, ASME, DOT, ISO 9001, 20+ global |
| Warranty | 5 years | 10 years + ESCO options |
Key Innovations:
Missing certifications = lost contracts. We’re one of China’s few LNG tank makers with:
ASME U-Stamp (required for US/Canada)
DOT SP1286 (US transport compliance)
CE Mark (EU market access)
ISO 9001 (quality management)
HACCP/GMP (food-grade LNG tanks)Pro Tip: Always verify certifications directly with issuing bodies—many suppliers falsify documents.
Step 1: Materials – We use 9% nickel steel (ASTM A553) for cryogenic resistance.
Step 2: Welding – Robotic TIG welding (0.1mm precision, X-ray tested).
Step 3: Insulation – Multi-layer vacuum + perlite (boil-off rate: 0.5%/day).
Step 4: Pressure Testing – Hydrostatic + pneumatic tests (1.5x design pressure).
Step 5: Certification – Third-party API 620/650 audits.
lng-equipment liquified-natural-gas-lng-tanks-manufacturer lng-oil-company lng-oil-and-gas
We’ve supplied 5,000+ tanks to:
Challenge: High boil-off losses (2.1%/day) due to poor insulation.
Solution: Enric’s vacuum-insulated tank cut losses to 0.6%/day.

Result: €180K annual savings + zero maintenance in 5 years.
Challenge: Frequent valve failures caused 12-day shutdowns per year.
Solution: Enric’s modular tank design with redundant safety valves.
Result: 8-day average downtime + 20% faster turnarounds.
We don’t just claim quality—we prove it. Here’s our full certification portfolio:
Why This Matters:
Our premium tanks last 25-30 years with proper maintenance. Standard tanks last 15-20 years.
Absolutely! We offer OEM/ODM customization for shape, capacity (50-250mÂł), and insulation levels.
We guarantee 12 months from order to delivery (vs. 18-24 months industry average).
Yes! We provide ESCO financing (0% down for qualified buyers) and leasing options.
Our premium tanks guarantee ≤0.5%/day (vs. 1.2-2.1% industry average).
Yes! We manage door-to-door shipping (including customs clearance) to 40+ countries.
“Enric’s tanks cut our boil-off losses by 15%—critical for our Singapore terminal.”
– Shell Asia-Pacific Procurement Manager
“Their ASME-certified tanks passed Siemens’ rigorous QA tests on first try.”
– Siemens Germany Technical Director
“12-month delivery saved us $2M in lost production.”
– GE Renewable Energy, US
“Zero corrosion in 3 years—unmatched vs. competitors.”
– IKEA Supply Chain Manager
Liam Carter
30-year veteran in LNG storage solutions
Former Director of Engineering at Chart Industries (NYSE: GTLS). Designed tanks for NASA’s cryogenic systems and ExxonMobil’s global terminals.
Published in Hydrocarbon Processing and LNG Industry Magazine. Speaker at Gastech 2023 and LNG2024.
“After decades in the industry, I’ve seen suppliers cut corners. Enric is the rare exception—their quality speaks for itself.”
Limited-time offer: Get a free technical consultation + 10% discount on first order.
Risk-free guarantee: 30-day money-back if tanks fail inspection.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day