Are you facing high prices, low-quality hydrogen supply, or soaring shipping costs impacting your operations? You’re not alone. Steam methane reforming (SMR) offers a proven, efficient route to produce hydrogen at scale with unmatched reliability. Whether you manage procurement, operations, or technical functions, our solutions empower you to optimize costs while ensuring compliance and quality assurance.
According to the IEA’s Future of Hydrogen Report 2024, blue hydrogen produced via steam methane reforming (SMR) with carbon capture and storage (CCUS) remains a key transitional technology. Yet many companies struggle with cost and quality because of fragmented supply chains and outdated equipment.
You need a trusted partner who ensures high-quality hydrogen supply at competitive prices with fast delivery and regulatory compliance.
Discover how our SMR solutions address these challenges »Shijiazhuang Enric Gas Equipment Co., Ltd. delivers world-class steam methane reforming units that combine powerful factory capabilities, quality assurance, OEM/ODM design flexibility, and high-speed delivery. Our solutions help you reduce costs, improve hydrogen yield, and comply with international standards.
| Parameter | Specification | Unit | Notes |
|---|---|---|---|
| Hydrogen Production Capacity | 100 - 1000 | Nm³/h | Customized per client requirements |
| Methane Feedstock Purity | ≥ 98 | % | Industrial natural gas grade |
| Hydrogen Purity | ≥ 99.99 | % | Suitable for fuel cells & chemical synthesis |
| Operating Pressure | 1.0 - 3.0 | MPa | Adjustable to fit process needs |
| Steam-to-Carbon Ratio | 2.5 - 3.5 | - | Optimized for catalyst life and efficiency |
| Fuel Gas Consumption | 10 - 15 | Nm³/h per 100 Nm³ H2 | Low energy consumption design |
| Carbon Capture Capability | Up to 90% | % | Optional CCUS integration available |
| Certifications | ASME, DOT, CE, ISO 9001 | - | Compliant with international standards |
Our SMR hydrogen production units serve a wide range of industrial and energy sectors, helping clients achieve operational excellence and sustainability goals.
For instance, a recent deployment in the USA cut hydrogen supply costs by 25% while maintaining purity above 99.995%, aligning with stringent EPA and DOT regulations. Another European client benefited from our fast-track OEM design to meet evolving industrial gas demands within 3 months.
Meet our trusted partners and certifications »Standard units typically ship within 8-12 weeks. Customized OEM/ODM designs may require 12-16 weeks, depending on specifications.
Yes. We design flexible configurations ranging from 100 to 1000 Nm³/h and beyond to meet your operational requirements.
Our SMR equipment carries certifications including ASME, DOT, CE, ISO 9001, and meets FCC, RoHS standards where applicable.
Absolutely. We offer 24/7 technical assistance, remote diagnostics, maintenance guidance, and spare parts supply worldwide.

We accept wire transfers (T/T), irrevocable letters of credit (L/C), PayPal for smaller transactions, and open to negotiation based on volume.
Or contact us directly:
WhatsApp (NA): +86 13831019831
Email: gasequipment@enricgroup.com
Thomas L., Operations Manager, Texas, USA: “The Enric SMR system delivered exactly as promised — high purity, steady output, and significant cost savings. Installation was smooth with excellent technical support.”
steam methane reforming hydrogen steam reforming hydrogen production hydrogen production by steam reforming
Eva S., Procurement Lead, Germany: “Their OEM customization helped us integrate the reforming unit seamlessly into our existing hydrogen supply chain. Delivery was faster than expected.”
Rajesh K., Technical Director, India: “We appreciate the detailed engineering consultation and compliance with international safety norms. The unit runs efficiently with low maintenance.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Industry Leaders & Certified for Quality