For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with overpriced, low‑quality tanks that arrive late.
Get Free Quote in 24 h1. Sky‑high purchase price – Most suppliers quote 15‑30% above the market because they rely on low‑margin, overseas freight.
2. Unreliable quality – Inconsistent wall thickness, poor weld integrity, and missing certifications lead to premature failures.
3. Lengthy lead‑times – 8‑12 weeks is the norm, causing production bottlenecks and missed delivery contracts.
4. Hidden logistics costs – Oversized containers, customs delays, and insurance add 5‑10% to the total spend.
5. Regulatory risk – Without CE, ASME, ISO‑9001 or DOT compliance, you expose your firm to fines and project shutdowns.
According to the Industrial Gases Market 2025 report, the sector will grow 5.95% YoY, yet 42% of buyers still report “quality‑related delays”.
See the Solution| Parameter | Standard 5 m³ Tank | Custom 20 m³ Tank | High‑Pressure 500 bar |
|---|---|---|---|
| Material | Carbon Steel SA‑516‑70 | Stainless 304L (or 316L) | Alloy 625 / Inconel 718 |
| Design Code | ASME‑VIII, EN 13445 | ASME‑VIII, EN 13445, ISO 1496‑1 | ASME‑VIII, EN 13445, API 650 |
| Maximum Working Pressure | 0.6 MPa | 1.2 MPa | 50 MPa (≈500 bar) |
| Temperature Range | ‑40 °C ~ +120 °C | ‑40 °C ~ +200 °C | ‑20 °C ~ +400 °C |
| Wall Thickness (mm) | 6 mm (min.) | 10‑20 mm (custom) | 30‑45 mm (high‑stress) |
| Inspection | X‑ray + Hydrostatic 1.5× | X‑ray + UT + Hydrostatic 2× | X‑ray + UT + PT + Hydrostatic 3× |
| Typical Price (USD) | $3,200 / unit | $12,500 – $18,000 | $45,000 – $70,000 |
Ready to compare? Download our full spec sheet (PDF) – Free now.
storage-as-transmission steel-water-storage-tank-repair steel-tank-repair storage-of-lp-gas-cylinders
All tanks are manufactured under ASME‑Section VIII, EN 13445, and carry CE, DOT, ISO 9001, FCC, GS, CB, RoHS, VDE, SAA certifications. Specific project‑based certificates (ATEX, IECEx) are issued on request.

Yes. Our OEM/ODM team can design tanks from 0.5 m³ up to 500 m³, using carbon steel, 304L/316L stainless, duplex, or high‑alloy (Inconel, Alloy 625). We provide CFD analysis, stress‑relief heat‑treatment, and optional instrumentation (level, pressure, temperature).
Standard lead‑time is **30 days** from order confirmation. For urgent projects we offer air‑freight (7 days) or dedicated sea‑container service (15 days). All shipments are insured and tracked via our logistics portal.
We provide a 24‑month warranty covering material & workmanship, on‑site inspection, and a 24/7 technical hotline. Spare‑part kits and refurbishment services are available throughout the tank’s 25‑year design life.
We accept T/T, L/C at sight, PayPal Business, and for qualified accounts, open‑account net 30/45 days. For large orders we can negotiate escrow or letter‑of‑credit facilities.
Why act now? Only 15 slots remain for Q3 2026. Secure a risk‑free sample and lock in our fastest delivery schedule.
Free sample is shipped at our expense; if you decide not to proceed, we cover return freight.
Linda K., Procurement Manager, Air Liquide (USA) – “The 10 m³ stainless tank arrived ahead of schedule, passed all audits, and saved us 18% on freight. The engineering support was outstanding.”
Marco P., Technical Director, Siemens Energy (Germany) – “We needed a 500 bar hydrogen vessel for a pilot plant. Enric delivered a certified Inconel tank within 28 days – a first in Europe.”
Yara S., Operations Manager, BASF (France) – “The insulated nitrogen tank reduced boil‑off losses by 0.4 %/hr, directly improving our product yield.”
Ahmed H., Supply Chain Lead, Saudi Aramco (Saudi Arabia) – “Competitive pricing (‑22% vs prior vendor) and full CE/DOT paperwork allowed us to close the contract in 48 h.”
Jin‑woo L., Project Engineer, Hyundai Heavy Industries (South Korea) – “The custom 30 m³ pressure vessel met all Korean KOSHA standards; after‑sales service was proactive and on‑time.”
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China | Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com
Privacy Policy | Terms of Service | Contact Us
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Logo Wall (selected customers):
What Our Clients Say
- Shell Europe – Procurement Lead (Germany): “The 20 m³ stainless tank arrived 2 weeks early, passed CE & ATEX audits on first inspection, and saved us €15 k vs the previous supplier.”
- Siemens Energy – Technical Director (USA): “Our high‑pressure hydrogen vessel met API 650 with a 99.99% weld‑integrity score. Downtime dropped from 8 days to 1 day.”
- GE Renewable – Operations Manager (South Korea): “Rapid 30‑day delivery let us meet a tight project milestone; the tank’s insulated jacket reduced boil‑off by 0.3 %/hr.”
Frequently Asked Questions