Storage tank design that cuts costs, guarantees compliance, and ships faster than any competitor.
Corporate purchasing managers in the U.S. and Europe report three recurring pain points:
Imagine a 5,000 m³ LNG storage tank that sits idle for months because the design lacked the required CE marking or the welding procedure qualification. The result? Lost revenue, strained supplier relationships, and a damaged brand.
| Parameter | Typical Range | Applicable Standards | Enric Default |
|---|---|---|---|
| Design Pressure (MPa) | 0.5 – 25 | ASME‑VIII, EN 13445 | 15 MPa (hydrogen‑compatible) |
| Design Temperature (°C) | -40 – +250 | ASME‑VIII, API 620 | +200 °C (liquid nitrogen) |
| Material Grade | SA‑516‑70, 304L, 316L, Duplex, Al‑5083 | ASTM, EN, JIS | 304L (default), optional 316L |
| Wall Thickness (mm) | 6 – 80 | ASME‑VIII, EN 13445 | Optimized via FEA (average 12 mm) |
| Internal Coating | Epoxy, PTFE, Phenolic | ISO 2812‑1 | Epoxy (corrosion‑resistant) |
| Inspection Method | RT, UT, PA, VT | ASME‑VIII, API 650 | Full NDT package |
| Maximum Volume | 0.5 m³ – 10 000 m³ | Custom | 5 000 m³ (standard) |
Our tanks are deployed in six high‑growth sectors:
Our client base spans 40+ countries, including Fortune 500 energy majors.
Standard 5 000 m³ tanks are engineered in 14 days after receiving material specs. Complex OEM projects add 3‑5 days per design iteration.
Yes. Our dual‑certification team holds both ASME‑U‑Stamp and CE‑Marking authorizations, ensuring seamless cross‑border compliance.
We provide three service tiers: (1) Delivery Only, (2) Installation Support (local contractor coordination), and (3) Full Turnkey (design‑to‑commission).
Our export team prepares all required documents (commercial invoice, packing list, IEC 62321 material safety data, and regional certificates) and works with your freight forwarder to minimize clearance delays.
A 24‑month warranty covers material defects, plus a 12‑month free‑of‑charge NDT inspection program. Our 24/7 hotline ( +86‑311‑81663811 ) is staffed by certified engineers.

Offer expires in 7 days: Free 1:1 design consultation, no‑cost prototype, and a money‑back guarantee if the tank fails the first NDT audit.
Maria L., Procurement Lead, BASF – “The engineering data package was ready in 48 h, saving us a critical project week.”
David R., Technical Director, Air Liquide – “Zero‑defect welds, full ISO 9001 traceability – exactly what our auditors demand.”
Yuki S., Operations Manager, Mitsubishi Heavy Industries – “Fast shipping from China to Yokohama – we received the tank 3 days before the vessel arrival schedule.”
Thomas B., Supply Chain VP, Schneider Electric – “The cost‑per‑tonne was 22 % lower than our previous supplier, with identical safety certification.”
Dr. Wei Zhang, Senior Process Engineer & International Standards Consultant at Shijiazhuang Enric Gas Equipment Co., Ltd.
With 18 years in pressure‑vessel design, Dr. Zhang authored three ASME‑approved design guides and has overseen >300 MW of hydrogen‑storage projects worldwide.
Contact: wei.zhang@enricgroup.com | +86‑156‑1436‑8118
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day