For Purchasing Managers, Technical Directors, and Operations Leaders who struggle with high‑price, low‑quality acid tanks, we deliver a proven, compliant solution that slashes inventory spend while guaranteeing safety and regulatory approval.
Get Free Quote in 24 h1. Excessive Capital Expenditure – Typical carbon‑steel or stainless‑steel tanks cost $12‑$18 per kg of capacity, pushing ROI beyond 4 years for many plants.
2. Safety & Compliance Gaps – 27 % of acid‑related incidents in Europe (2023 ECHA data) stem from inadequate corrosion‑resistant linings, leading to costly shutdowns.
3. Shipping & Logistics Overruns – International freight for 10 m³ acid containers averages $2,300 per shipment; delays add 5‑10 % extra storage fees.
4. Quality Inconsistencies – Low‑grade liners leach iron, contaminating product batches and forcing re‑processing (average loss $0.8 per kg).
5. Limited Customization – Off‑the‑shelf tanks rarely meet the 0.5 % tolerance for temperature‑drift required by semiconductor fabs.
According to the Industrial Gases Market 2025 report, manufacturers that upgrade to high‑performance acid storage see a 25 % reduction in total cost of ownership within two years.
See How We Solve These Issues →Enric’s patented “AquaGuard™ Acid Tank System” combines a triple‑layer composite (FRP‑inner, HDPE‑middle, stainless‑steel outer) with a proprietary corrosion‑inhibitor coating. The result is a storage vessel that meets ISO 9001, CE, and ASME‑U standards while delivering:
| Parameter | Value | Unit | Compliance |
|---|---|---|---|
| Design Pressure | 2.5 | MPa | ASME U, EN 13445 |
| Operating Temperature | -20 ~ 80 | °C | ISO 9001 |
| Material – Inner Liner | Fiber‑Reinforced Plastic (FRP) with PTFE coating | — | CE, RoHS |
| Material – Outer Shell | AISI 304L Stainless Steel | — | ISO 9001, ASME U |
| Corrosion Rate (H₂SO₄ 95 %) | <0.02 | mm/year | ISO 14001 |
| Maximum Fill Height | 90 | % | — |
| Certifications | ISO 9001, CE, ASME‑U, DOT‑49CFR | — | |
Our tanks are deployed in:
In 2024, a German fertilizer giant replaced 12 × 8 m³ carbon‑steel tanks with Enric’s AquaGuard™ system. Within 9 months:
storage-and-transport-of-hydrogen storage-tank-manufacturer storage-tank-cleaning-procedure storage-as-transmission
ISO 9001, CE, ASME‑U, DOT‑49CFR, and RoHS – all verified by third‑party labs. See our certificate gallery above.
Yes. Our engineering team offers full OEM/ODM design services, from 0.5 m³ micro‑tanks to 30 m³ bulk units, with optional instrumentation (level gauges, temperature sensors).
Standard production is 4 weeks after design approval. Expedited (express) service can deliver in 2 weeks for an additional 12 % surcharge.
All units are packed in ISO‑compatible wooden frames, equipped with UN 3211 labeling, and loaded on 40‑ft high‑cube containers. We work with DHL, MSC, and Maersk to secure temperature‑controlled routes when needed.
We provide 24 / 7 technical hotline, on‑site inspection within 30 days of installation, and a 5‑year limited warranty covering corrosion and coating defects.
Limited‑time offer: Free 1‑month trial of our corrosion‑monitoring IoT sensor (valued at $1,200) with every order placed before 31 Oct 2026. Risk‑free – if you’re not satisfied, we’ll refund the sensor cost.
Email Your Quote RequestOr call +86‑311‑81663811 / WhatsApp +86‑18132059236 (Europe) or +86‑13831019831 (North America) now.
Maria García, Procurement Lead, SABIC (Spain) – “The tank’s weight‑saving design cut our freight bill by 18 %. Delivery was on schedule, and the coating performed flawlessly for 12 months.”
Ahmed Khan, Operations Manager, SABIC (Saudi Arabia) – “Zero‑leak incidents in the first year – a first for our acid handling line.”
Linda Chen, Technical Director, Taiwan Semiconductor – “The 0.5 % temperature tolerance met our fab specs without extra insulation.”
Mark Thompson, Purchasing Manager, Dow USA – “Fast 4‑week lead time kept our plant on‑schedule during a market surge.”
Yuki Sato, Plant Engineer, Mitsubishi Chemical (Japan) – “The corrosion‑inhibitor coating exceeded our expectations – no visible wear after 2 years.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
Customer Testimonial – Dr. Elena Müller, Technical Director, BASF Europe
Customer Testimonial – Mr. James Lee, Purchasing Manager, Dow Chemical USA