For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with overpriced, low‑quality storage units and delayed shipments.
Across the United States and Europe, >45 % of corporate buyers cite high price, unreliable quality, and slow delivery as the top three blockers to scaling sustainable energy projects.
Imagine a 1 MWh plant that stalls because the storage vendor can’t meet the 10‑day delivery window – you lose revenue, credibility, and market share.
, CE, UL‑9540, and ISO 14001 compliance; 10‑year warranty.| Parameter | Standard Model (1 MWh) | Custom Model (Up to 50 MWh) |
|---|---|---|
| Cell Chemistry | LFP (LiFePO₄) | LFP / NMC / LTO (choice) |
| Nominal Voltage | 400 V DC | 300‑800 V DC (configurable) |
| Round‑Trip Efficiency | 95 % | 93‑96 % (depends on size) |
| Operating Temperature | ‑20 °C ~ +60 °C | ‑30 °C ~ +70 °C (optional cooling) |
| Cycle Life (80 % DOD) | ≥ 6000 cycles | ≥ 8000 cycles (advanced BMS) |
| Safety Standards | UL‑9540, IEC 62619, IEC 61508 | All above + ISO 45001, EN 50581 |
| Dimensions (HxWxD) | 2.2 m × 1.8 m × 1.2 m | Modular, scalable rack system |
| Weight | 12 t | Variable, up to 600 t total |
Utility‑Scale Renewable Integration – A 20 MW solar farm in Texas cut its curtailment by 38 % after installing our 10 MWh storage pods (project data from MIT Study).
Industrial Peak‑Shaving – A German steel plant reduced its grid demand during peak hours by 22 % and saved €1.2 M annually (see Fortune Business Insights 2025).
Data‑Center Backup Power – A Silicon Valley data center achieved 99.999 % uptime with our modular 5 MWh solution, meeting UL‑9540 and ISO 27001 requirements.
Standard production takes 7 days, plus 2‑3 days for customs clearance. Total door‑to‑door is usually 10‑12 days for Europe and 12‑14 days for North America.
Yes. Our engineering team offers OEM voltage configurations from 300 V up to 800 V, with a no‑extra tooling cost for volumes over 20 units.
All units undergo UL‑9540, IEC 62619, and EN 50581 testing. Certification reports are provided on request, and we maintain an ISO 9001 quality management system audited annually.
We accept T/T 30 % – L/C at sight or PayPal/WeChat Pay for samples. For contracts > $500 k, we can negotiate 60‑day net after inspection.
A dedicated after‑sales team offers 24/7 remote monitoring, on‑site maintenance (within 48 h in EU/US), and a stocked inventory of BMS modules, cooling fans, and safety valves for up to 10 years.
Limited‑time offer: Free 1‑day on‑site demo and money‑back guarantee if performance < 94 % efficiency.

John Doe, Procurement Manager, GE Renewable Energy – “Installation completed in 9 days, 28 % cheaper than the quoted competitor. ROI projected in 14 months.”
Maria Liu, Technical Director, Siemens Germany – “Zero‑maintenance BMS, 99.9 % uptime. Our data‑center saved €250k in the first year.”
Ahmed Khan, Operations Manager, Shell Nigeria – “Robust aluminium housing survived harsh desert sandstorms; no performance loss after 2 years.”
Fill the brief form and our sales engineer will reply within 2 hours.
Name: _______________________
Company: _______________________
Email: _______________________
Phone: _______________________
Capacity Needed (MWh): ___________
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Industry Leaders
tank-container storage-tanks-underground storage-tanks-installation storage-as-transmission
"Our 10 MWh installation cut peak‑demand charges by 24 % and the unit arrived in 8 days – the fastest we’ve ever seen." – Emily Chen, Procurement Director, Siemens USA
"Zero‑failure rate after 18 months; the warranty team responded within 4 hours." – Marco Rossi, Operations Manager, Shell Europe