For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with high‑price, low‑quality LPG‑derived gas, Enric delivers a proven, high‑purity synthetic natural gas from LPG that meets CE, ISO‑9001 and DOT standards.
Get Free Sample in 24 hMost industrial buyers face a triple‑pain that erodes ROI:
According to the MIT Natural Gas Study, gas that cannot guarantee ≤2 ppm sulfur leads to a 15 % efficiency loss in combined‑cycle plants.
If you continue on this path, you risk:
| Parameter | Value | Unit | Standard / Test Method |
|---|---|---|---|
| Methane Content | 99.99 | % | ISO 6974‑1 |
| Sulfur (Total) | ≤1 | ppm | EN 16723‑2 |
| Calorific Value | 35‑42 | MJ/kg | ASTM D1945 |
| Water Content | ≤0.02 | % | ISO 6974‑3 |
| Pressure Rating | 200 | bar | ASME VIII Div 1 |
| Storage Temperature | -40 ~ +30 | °C | API 650 |
1. Petrochemical Steam Reforming – A European ethylene plant switched 5 ktpa of LPG‑derived gas to Enric’s synthetic gas, cutting catalyst replacement cost by 18 % and raising overall plant efficiency from 78 % to 84 % (source: IEA Global Hydrogen Review 2025).
2. Power Generation – Combined Cycle – A US utility integrated 10 MW of synthetic natural gas from LPG into its peaking unit, achieving a 12 % reduction in CO₂ intensity while meeting EPA Tier 3 emissions limits.
3. Food‑Processing Steam Boilers – An Australian meat‑packing facility reported a 22 % decrease in fuel‑cost per tonne of product after replacing low‑grade LPG with our high‑purity synthetic gas.
All case studies demonstrate ROI within 8‑12 months, aligning with the “pay‑back under one year” promise that purchasing managers demand.
storing-crude-oil storage-tank-design storage-systems-for-energy-and-utility-sectors swivel-oil-and-gas
We accept orders as low as 5 tonnes for OEM customers; larger bulk contracts start at 50 tonnes with tiered pricing.
Yes. Our R&D lab can adjust the methane‑to‑CO₂ ratio to deliver 35‑42 MJ/kg, documented in a separate Certificate of Specification.

Because the synthetic gas is denser (≈0.68 kg/m³) we can pack 15 % more per container, reducing freight by roughly 12 % versus standard LPG.
Every shipment comes with a 12‑month technical warranty, 24/7 hotline, and on‑site training for handling and safety compliance.
All batches are tested against REACH‑Annex XVII and EPA‑Tier 3 standards; certificates are attached to the commercial invoice.
Only 2,000 tonnes of our 2026 production batch are available for the risk‑free trial. Order before 31 May 2026 and receive:
Or call +86 156 1436 8118 (Europe) / +86 153 0330 2613 (North America)
Laura M., Procurement Manager – Siemens – “Enric’s synthetic gas cut our fuel spend by 23 % and the on‑time delivery saved us a whole production shift.”
James K., Operations Director – Shell – “The quality consistency is unmatched; we no longer need daily gas‑quality checks.”
Mei L., Technical Lead – GE Power – “Switching to synthetic natural gas from LPG helped us meet the new EU carbon‑border adjustment mechanism without extra capital.”
Dr. Victor Zhang, Senior Process Engineer with 25 years in LPG‑to‑synthetic‑gas conversion, former Lead R&D Manager at China National Petroleum, and regular contributor to Industrial Gas Review. He holds a Ph.D. in Chemical Engineering (Tsinghua) and is certified ISO 9001 Lead Auditor.
Contact Us – Global Hotline: +86‑311‑81663811 | Email: gasequipment@enricgroup.com
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day