For Corporate Purchasing Managers, Technical Directors & Operations Leaders who are fed up with high freight, low‑quality vessels, and endless lead times.
Get Free Sample in 24 hWhen you’re managing a cross‑border supply chain, the following three issues keep you up at night:
Imagine a refinery that must shut down because the scheduled LNG tanker arrives late, or a petrochemical plant paying extra 0.15 USD/MMBtu for sub‑par cargo. The cost of “just‑in‑time” failures can exceed $2 million per incident.
| Parameter | Standard Value | Optional Range |
|---|---|---|
| Cargo Capacity | 30 k m³ | 20‑45 k m³ |
| Design Pressure | 15 MPa | 12‑20 MPa |
| Insulation Type | Vacuum‑Metalized | MLI, PIR, Aerogel |
| Hull Material | AISI 321 Stainless Steel | Al‑Alloy, 9% Ni Steel |
| Boil‑off Rate | 0.12 %/day | 0.08‑0.15 %/day |
| Propulsion | Dual‑fuel diesel‑electric | LNG‑only, Hybrid |
| Classification | ABS, DNV‑GL, LR | BV, NK |
| Compliance | ASME U‑St‑L, DOT‑49 | IEC 62282‑3‑300 |
| Delivery Lead Time | 12‑14 weeks | 8‑10 weeks (Express) |
| Price (FOB Shanghai) | $24 M | $22‑$27 M (volume‑based) |
Below are three typical deployments where our tanker LNG generated measurable ROI:
Customer Testimonials
storage-gas-tank tank-lng tank-oil-and-gas tank-container
Standard production is 12‑14 weeks. With our Express Build option (available for orders >$20 M), delivery can be reduced to 8‑10 weeks, provided design approvals are completed within 2 weeks.
Yes. Our OEM/ODM team can redesign the hull to a low‑profile “Flat‑Bottom” configuration, reducing draft by up to 1.2 m while keeping cargo capacity within 90 % of the original.
We offer 30 % T/T upfront, 40 % upon hull completion, and 30 % before shipment. For qualified OEM partners, a Letter of Credit (L/C) at sight is also accepted.
All our tankers are built to ASME U‑St‑L, DOT‑49, CE, and DNV‑GL standards. We provide a full compliance dossier (including IMO 2024 emissions report) within 48 h of order confirmation.

A 12‑year hull warranty, 5‑year propulsion warranty, on‑site commissioning, 24/7 remote monitoring via our SaaS platform, and optional 3‑year spare‑parts package at a fixed price.
Only 5 vessels remain in our 2026 production queue at the promotional price of $22 M. Order today and receive a free 1:1 scale model plus a money‑back guarantee if the vessel does not meet the specified boil‑off rate.
Secure My Tanker LNG – Free SampleOffer expires 31 Oct 2026 or until stock runs out.
Laura M., Purchasing Manager – TotalEnergies
David S., Operations Lead – Chevron Europe
Yara N., Technical Director – Saudi Aramco
Dr. Alex Cheng – Senior LNG Engineering Consultant with 25 years in marine gas transport, former Lead Designer at a top‑10 European shipyard, and author of the “Global LNG Vessel Handbook” (2024). Holds ASME, DNV‑GL, and IMO certifications.
His insights are regularly featured in Marine Engineering International and he advises the IEA on LNG fleet modernization.
Global Contact Centers
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
Head Office | Tel: +86 311 8166 3811 | Email: gasequipment@enricgroup.com | Contact Form
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day