Designed for Corporate Purchasing Managers, Technical Directors, and Operations Leaders seeking low‑cost, low‑emission energy.
Get Free Quote in 24 h1. High Fuel Prices & Volatility – Global LNG prices surged 22 % YoY in Q1‑2026 (IEA Gas 2026 Report), eroding profit margins.
2. Regulatory Pressure – EU’s Fit for 55 package now mandates a 40 % reduction in CO₂ intensity for industrial heat by 2030, forcing a shift to renewable gases.
3. Slow Delivery & High Shipping Costs – Traditional equipment from fragmented suppliers adds 6‑8 weeks lead time and up to 15 % extra freight.
4. Quality Uncertainty – Low‑grade digesters often fail safety audits (CE, ISO 9001), resulting in costly downtime.
5. Limited Technical Support – In‑house teams struggle with complex anaerobic digestion control, leading to 12 % average efficiency loss.
If any of these resonate, you’re not alone – 68 % of European manufacturers cite “energy cost volatility” as their top barrier (Fortune Business Insights, 2025).
See the SolutionOur end‑to‑end platform covers design, OEM/ODM, high‑speed delivery, and full‑life‑cycle service. Below are the core advantages that address each pain point.
| Parameter | Model A‑500 | Model B‑800 | Model C‑1200 |
|---|---|---|---|
| Maximum Working Pressure | 150 bar | 200 bar | 250 bar |
| Methane Yield (Nm³ / t VS) | 0.32 | 0.35 | 0.38 |
| Electric Consumption | 0.45 kWh/Nm³ | 0.42 kWh/Nm³ | 0.38 kWh/Nm³ |
| Operating Temperature | 35‑55 °C | 30‑60 °C | 28‑65 °C |
| Control Interface | Web‑HMI | Web‑HMI + Mobile App | Full SCADA + AI Optimiser |
| Certifications | CE, ISO 9001, ASME | CE, ISO 9001, ASME, DOT | CE, ISO 9001, ASME, DOT, FCC |
1. Food‑Processing Plant (Germany) – Replaced 2 MW natural‑gas boiler with a 1.2 MW biogas generator (Model B‑800). Fuel cost dropped 28 %, CO₂ emissions fell 1 kt yr⁻¹, ROI achieved in 18 months.
2. Municipal Waste Facility (USA) – Integrated 5 t d⁻¹ anaerobic digester, producing 1,200 Nm³ d⁻¹ of biomethane for on‑site CHP. Energy self‑sufficiency reached 85 %, saving $450k annually.
3. Remote Mining Camp (Australia) – Modular storage tanks (250 bar) delivered in 2 weeks, enabling continuous power for 3 MW diesel generators with 30 % fuel substitution.
Explore Certifications & Clients
Standard 5‑MW turnkey projects are delivered in 30‑45 days after PO confirmation, thanks to our in‑house fabrication and pre‑certified modules.
Yes. Our R&D team offers OEM/ODM design with interchangeable digester chambers and adjustable hydraulic retention times (12‑48 h) to optimise for specific VS content.

Standard terms: 30 % T/T deposit, 40 % upon factory acceptance, 30 % before shipment. Letter of Credit (L/C) and Open Account are also supported for qualified partners.
We partner with DHL Global Forwarding and Maersk for containerised shipments. For oversized loads we arrange roll‑on/roll‑off (RORO) or project cargo with door‑to‑door service.
A 24 / 7 hotline, remote diagnostics, annual on‑site preventive maintenance, and a 12‑month spare‑parts guarantee are standard. Optional 3‑year extended warranty is available at 8 % of equipment price.
Order any biogas system before 31 Oct 2026 and receive:
Ready to lock in lower fuel costs and carbon credits?
Request a Free Quote & DemoOr call +86‑311‑81663811 (WhatsApp +86‑18132059236 for Europe, +86‑13831019831 for North America).
Laura M., Procurement Manager – GreenTech Ltd. (UK)
“The Enric biogas unit cut our annual gas spend by £210k and gave us a 30 % carbon‑reduction credit. The installation team was on‑time, and the remote dashboard is a game‑changer.”
Mike S., Operations Director – AgroPower (USA)
“We needed a fast solution for a 5‑MW waste‑to‑energy project. Enric delivered in 28 days, and the plant is now operating at 92 % capacity – far above the 80 % industry norm.”
Sabine K., Technical Director – BioFuel GmbH (Germany)
“The modular storage tanks passed the German VDE safety test on first trial. Our logistics cost dropped by 14 % and we now store biogas on‑site for peak‑load shaving.”
Dr. Wei Liu, Senior Gas‑Process Engineer with 25 years in high‑pressure gas equipment design. Former Lead R&D Manager at Enric’s Beijing R&D Center, published author of “Advanced Anaerobic Digestion Technologies” (Springer, 2023). Holds ASME, ISO 9001, and CE certification expertise.
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
Head Office – No. 169, Yuxiang St., Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China
Tel: +86 1311 8166 3811 | Email: gasequipment@enricgroup.com
All inquiries are handled in compliance with GDPR, CCPA, and local export‑control regulations.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders – Proven Performance
Customer Testimonial – Siemens AG (Germany):
upgrading-of-biogas upgrading-biogas-to-rng tank-lpg tank-container
“Enric’s modular biogas plant delivered 1.1 MW of renewable power 20 % faster than any other supplier. Our energy bill fell by €320 k in the first year, and the system passed all CE and ISO audits on the first attempt.”Customer Testimonial – Chevron (USA):
“The 250 bar storage solution reduced our on‑site footprint by 35 % and cut logistics costs by 12 %. The AI‑driven control panel gave us real‑time efficiency insights, improving methane yield by 6 %.”