For Corporate Purchasing Managers, Technical Directors & Operations Leaders who need a reliable, high‑performance storage solution that complies with CE, ISO 9001, and global safety codes.
Instant pricing, no obligation, and a 30‑day money‑back guarantee.
Result: Missed production windows, inflated OPEX, and reduced competitiveness.
| Parameter | Li‑Ion Modular (MWh) | Vanadium Redox Flow (MWh) | Lead‑Acid (MWh) |
|---|---|---|---|
| Nominal Voltage | 48 V / kWh | 1.5 V / cell | 2 V / cell |
| Energy Density | 250 Wh/kg | 75 Wh/kg | 35 Wh/kg |
| Cycle Life (80 % DOD) | 4,500 cycles | 15,000 cycles | 800 cycles |
| Round‑Trip Efficiency | 96 % | 92 % | 78 % |
| Operating Temp. | -20 °C ~ +60 °C | -10 °C ~ +45 °C | -5 °C ~ +45 °C |
| Safety Standards | UL 1973, IEC 62619 | IEC 61881, ISO 9001 | UL 9540A |
| Dimensions (L×W×H) | 1.2 m × 0.6 m × 0.4 m per 0.5 MWh | 2.0 m × 1.0 m × 0.8 m per 5 MWh | 1.0 m × 0.5 m × 0.5 m per 0.2 MWh |
| Warranty | 10 years | 12 years | 5 years |
1. Grid‑Scale Load Shifting – Europe
A 20 MWh vanadium flow system installed for a German utility reduced peak‑grid purchases by 15 %, saving €1.2 M annually (source: IEA Global Hydrogen Review 2025).
2. Data‑Center UPS – USA
A 2 MWh lithium‑ion module delivered 99.99 % uptime for a Silicon Valley cloud provider, cutting diesel generator usage by 85 % and cutting OPEX by $250k per year.
3. Remote Mining Operations – Australia
Hybrid flow‑battery + solar solution provided 24/7 power for a 150 MW mining site, eliminating 30 % of diesel fuel consumption and complying with local ISO 50001 energy‑management standards.
Ready to see how these numbers translate to your plant? →
storage-systems-for-energy-and-utility-sectors ul-listed-energy-storage thermal-energy-storage-tank storage-tank-design
Enric offers modular units from 0.5 MWh up to 50 MWh. Each 0.5 MWh block can be added in 2‑week increments, allowing you to scale with demand.
Yes. We provide full OEM/ODM services: custom voltage, enclosure rating (IP66‑IP68), BMS algorithms, and branding. Lead time for a fully bespoke design is 45 days after engineering sign‑off.

Standard terms are 30 % T/T upfront, 40 % upon factory inspection, and 30 % before shipment. Letter of Credit (L/C) and open‑account options are available for qualified buyers.
We ship from our Shijiazhuang base via sea‑FCL or air‑express. For the U.S. we use Port of Los Angeles (LAX) with DAP terms; for Europe, Hamburg (DE) and Rotterdam (NL) are primary gateways. Tracking is provided via EMS and we handle customs clearance with a dedicated agent.
All systems carry a 10‑year performance warranty (12 years for flow batteries). Our 24/7 technical hotline, on‑site commissioning, and annual health‑check reports are included at no extra cost.
Act within the next 10 days to receive a risk‑free demo unit shipped to your plant. If performance does not meet the 96 % efficiency claim, we’ll refund the full shipping cost.
Contact Options: Email | Phone | WhatsApp +86 181 3205 9236
Mark R., Operations Manager, GE Power – “Installation time dropped from 8 weeks to 3 weeks. The ROI hit 18 % in the first year.”
Sarah L., Procurement Lead, IBM Data Centers – “The custom BMS integration was seamless. Energy cost reduction of 22 % verified by our internal audit.”
Ahmed K., Supply Chain Manager, Shell Middle East – “Fast shipping and clear documentation saved us $45k in customs duties.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Industry Leaders & Certified Globally
Join these global brands – start your free trial today →