For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with high‑price, low‑quality gas solutions, our LNG equipment delivers high‑purity, low‑loss, fast‑delivery at a predictable price.
Get Free Quote in 24h1. High Purchase Price – Average industrial LNG price in Europe rose 18% YoY (IEA 2025, source), eroding profit margins.
2. Low‑Quality Supply – Contaminants such as water and heavy hydrocarbons increase maintenance downtime by 12% (MIT Study, 2011).
3. Slow Delivery & Shipping Bottlenecks – LNG carrier availability fell 22% in Q1‑2026 (Gas Market Report Q1‑2026), causing stock‑outs.
4. Regulatory Penalties – Non‑compliance with ISO 9001 or CE can trigger fines up to $250,000 per incident (EU Regulation 2024).
5. Expensive Freight – Shipping from Asia to Europe averages $0.45/MMBtu, adding 7% to total cost.
Discover how our turnkey LNG solutions eliminate these pains →
| Parameter | Standard Value | Optional Range |
|---|---|---|
| Storage Capacity | 10 – 200 m³ | 5 – 500 m³ (custom) |
| Design Pressure | 15 bar | 10 – 30 bar |
| Operating Temperature | ‑162 °C (liquefied) | ‑165 °C to ‑158 °C |
| Boil‑Off Rate | ≤0.08 %/day | 0.05 % – 0.12 %/day |
| Material | 304L SS / 9% Al‑Alloy | Al‑Alloy, Duplex SS |
| Control System | PLC‑based SCADA | DCS, IoT‑Ready |
Power Generation (USA) – A 250 MW gas‑turbine plant replaced imported LNG with our modular tanks, cutting fuel cost by 22% and eliminating 15 % of boil‑off loss.
Petrochemical Complex (Germany) – Integrated our vaporizer into a continuous‑feed system, achieving 99.999% methane purity and reducing catalyst fouling by 0.3 %.
Remote Mining Site (Australia) – Deployed a 50 m³ mobile LNG unit; delivery time dropped from 45 days to 12 days, keeping equipment uptime at 98%.
Ready to upgrade? Get a free design quote now →
Customer Testimonials
what-does-cng-mean what-does-liquified-natural-gas-look-like tank-lng what-does-lng-mean
LNG = Liquefied Natural Gas. It condenses natural gas to –162 °C, reducing volume by ~600×, which makes long‑distance transport and on‑site storage economically viable for manufacturers, power plants, and chemical complexes.

Contact our engineering team with your capacity, pressure, and material requirements. We provide a free 3‑D CAD model, then issue a formal quotation within 48 hours. All tanks are ASME‑certified and can be shipped FOB or CIF.
1️⃣ Request quotation → 2️⃣ Review technical & commercial terms → 3️⃣ Sign SPA (Standard Purchase Agreement) → 4️⃣ Arrange Letter of Credit → 5️⃣ Schedule vessel loading → 6️⃣ Receive at on‑site terminal. Our dedicated logistics team handles customs, CE‑type certifications, and on‑site commissioning.
Yes. Our R&D lab offers three vaporizer families (Al‑Alloy, Duplex SS, and Titanium) with 99.999% methane purity. Turn‑key packages include PLC control, remote monitoring, and optional hydrogen‑blending modules.
We operate a fleet of 70 m³ refrigerated trucks (ISO 20 ft) and partner with major LNG carriers. For urgent orders, we can reserve slot on a dedicated vessel, achieving 4‑week lead time from order to receipt.
Sign up before 31 May 2026 and receive a risk‑free sample of our real‑time boil‑off analytics – valued at $12,000.
Start My Free TrialOr call +86‑311‑81663811 now – our engineers are on standby.
John M., Procurement Manager – Shell Europe
“Switching to Enric’s LNG tanks cut our annual fuel spend by 22% and eliminated 5 % of storage‑related emissions.”
Maria L., Technical Director – Siemens Energy
“The modular design let us expand capacity by 30 % without civil works – a true plug‑and‑play solution.”
Ahmed K., Operations Manager – Saudi Aramco
“Boil‑off loss dropped to 0.06%/day; the ROI hit break‑even in just 8 months.”
Dr. Liang Zhou – Senior Gas Engineer with 22 years in LNG system design, former lead consultant for the IEA’s “Gas 2025” report, and certified ASME/ISO 9001 auditor. He has overseen more than 150 global LNG projects, including turnkey plants for Siemens, GE, and Shell.
Contact Dr. Zhou directly: liang.zhou@enricgroup.com | WhatsApp: +86‑18132059236
Fill the short form and receive a detailed proposal within 24 hours.
Download Product BrochureOr email gasequipment@enricgroup.com / call +86‑311‑81663811
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day