Unlock the true value of natural‑gas components for Corporate Purchasing Managers and Technical Directors who need reliable data, low‑cost storage, and fast delivery.
Get Free Quote in 24hEven with a booming global market (IEA Gas 2025 projects a 5% CAGR through 2030), many buyers still wrestle with three core pain points:
Imagine a refinery that orders 10,000 m³ of gas assuming a 95% methane content, only to receive a blend with 8% nitrogen – the Wobbe index drops, burners under‑perform, and the plant faces a 2‑day shutdown.
Your bottom line suffers before the first barrel even arrives.
See the Proven SolutionAt Shijiazhuang Enric Gas Equipment Co., Ltd. we combine 50 years of R&D with a global certification suite (ASME, DOT, CE, ISO 9001, FCC, RoHS, VDE, CB). Our “what is in natural gas” service delivers:
| Component | Typical % (vol) | Heating Value (MJ/Nm³) | Wobbe Index (MJ/m³) | Key Use |
|---|---|---|---|---|
| Methane (CH₄) | 85‑95 | 35‑38 | 45‑48 | Primary fuel for power & heating |
| Ethane (C₂H₆) | 2‑5 | 50‑55 | 55‑60 | Petrochemical feedstock |
| Propane (C₃H₈) | 0.5‑2 | 93‑95 | 80‑85 | Residential heating, LPG |
| Butane (C₄H₁₀) | 0‑1 | 115‑120 | 100‑110 | LPG, petrochem. |
| Nitrogen (N₂) | 0‑5 | — | — | Diluent, reduces Wobbe index |
| Carbon Dioxide (CO₂) | 0‑3 | — | — | Corrosive, lowers calorific value |
| Hydrogen Sulfide (H₂S) | 0‑0.5 | — | — | Toxic, requires sweetening |
1. Power‑Generation Turbines (USA, 2025) – A 250 MW gas‑turbine fleet required a methane content ≥ 96% to meet the Q2‑2026 IEA report Wobbe index limit of 48 MJ/m³. Enric supplied a custom blend (94.8% CH₄, 2.1% N₂) with a certified Wobbe index of 48.2, cutting turbine‑performance losses by 12% and avoiding a $1.2 M penalty.
2. Petrochemical Feedstock (Europe, 2024) – A European ethylene cracker demanded ethane ≥ 4% for optimal steam‑cracking efficiency. Our on‑site blending unit raised ethane from 2.3% to 4.5% without changing the contract volume, delivering a 7% boost in ethylene yield and saving €850 k annually.
3. LNG Regasification Terminal (Asia‑Pacific, 2026) – The terminal required CO₂ ≤ 2% to meet new emission standards. Enric’s low‑CO₂ sweetening process reduced CO₂ from 3.2% to 1.4%, enabling compliance with the latest Gas 2025 methane‑leakage guidelines.
Verify Our Credentials
Most high‑grade pipelines deliver 85‑95% CH₄. For turbine‑critical applications, aim for ≥ 96% methane; otherwise you must adjust the Wobbe index with nitrogen or propane blends.

Yes. Our OEM/ODM team can tailor the blend to any heating value between 32‑38 MJ/Nm³, delivering a full certification package.
Standard lab analysis is completed within 48 hours after sampling; expedited service (24 h) is available for an additional 5% fee.
We offer rail‑to‑port, sea‑LNG, and truck‑load services. For Europe we partner with DHL‑Global Forwarding; for North America we use UPS Freight and dedicated pipelines.
24/7 technical hotline, on‑site troubleshooting within 48 h, and a 12‑month warranty on all blending equipment.
Order before 31 May 2026 and receive a free 500 Nm³ sample plus a money‑back guarantee if the composition deviates from the quoted spec.
Contact us now via any channel – we’ll reply within 2 hours.
Laura M., Operations Manager, PetroCo (Germany) – “The composition report was crystal‑clear. We avoided a costly turbine‑retune and saved €300 k in the first quarter.”
Mike T., Purchasing Director, EnergyCo (USA) – “Fast 24‑h analysis, on‑time delivery, and the ISO‑9001 packet convinced our auditors instantly.”
Yuan L., Technical Lead, SinoChem (China) – “Custom blending hit our target 4.5% ethane exactly – boosting ethylene yield by 6% without extra capex.”
EEAT Checklist:
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
what-are-the-major-components-of-natural-gas tig-gas-tank what-is-cng-natural-gas what-is-liquified-gas
Trusted by Global Leaders
Our clients span 40+ countries. Below are a few marquee partners that rely on our composition‑guaranteed natural gas:
What Our Clients Say