For Purchasing Managers, Technical Directors & Operations Leaders who need a reliable, low‑carbon fuel that ships fast and costs less.
Get Free Quote in 24 h1. Sky‑rocketing LNG spot prices – In Q1‑2026 global LNG averaged $12.5/MMBtu, a 15 % rise from 2025 (IEA 2026 report).
2. Long lead‑times & customs delays – Average delivery from Asia to Europe now exceeds 45 days, jeopardizing plant‑run continuity.
3. Compliance nightmares – Multiple regions demand CE, ISO 9001, DOT, and local environmental permits; missing one can halt a shipment.
4. Hidden logistics costs – Freight, vapor‑loss insurance, and boil‑off penalties add up to 10‑15 % of FOB price.
5. Quality uncertainty – Variations in methane purity (92‑96 %) affect turbine efficiency and emissions reporting.
If any of these sound familiar, you’re losing up to $250,000 per year on a 10 kt LNG contract.
See How We Solve It →| Parameter | Typical Value | Unit | Applicable Standard |
|---|---|---|---|
| Methane Purity (CH₄) | 96‑99 | % | ISO 18245 |
| Boil‑Off Rate (BOR) | ≤ 0.12 | %/day | ASME BPVC §VIII‑1 |
| Storage Temperature | -162 ± 0.5 | °C | EN 12285‑2 |
| Pressure (Vapor) | 0.2‑0.3 | MPa | ISO 10156 |
| Density (Liquid) | 426‑452 | kg/m³ | API 521 |
| Calorific Value | 48‑55 | MJ/kg | ISO 6976‑1 |
| Carbon Content | ≤ 0.5 | % by mass | EPA GHG Reporting |
| Vapor Recovery Efficiency | ≥ 95 | % | EPA MMS Rule 2004 |
| Maximum Tank Size | 200 | m³ | ASME Section VIII‑2 |
Note: All parameters are verified by our in‑house laboratory (ISO 17025 accredited) and third‑party auditors.
Power Generation – 15 MW Combined‑Cycle Plant (Germany)
Our LNG supplied 12 kt/yr with 96.8 % purity, cutting CO₂ emissions by 0.45 t/MWh and delivering a 12 % OPEX reduction versus heavy‑fuel oil. MIT 2011 study confirms LNG’s lower lifecycle emissions.
Chemical Feedstock – Ammonia Plant (South Korea)
Integrated 8 kt of blue‑LNG (SMR + CCUS) achieving 90 % CO₂ capture. Result: $1.2 M annual carbon‑credit revenue and compliance with the Global Hydrogen Review 2025 targets.
Maritime Propulsion – 3‑Ship Fleet (USA Gulf Coast)
Swapped diesel for LNG, reducing NOx by 85 % and fuel cost by 13 % after accounting for lower freight rates.
Our clients include:
“Switching to Enric’s LNG cut our fuel‑costs by 14 % and eliminated boil‑off losses. The certification package saved us 3 weeks of paperwork.” – Maria L., Procurement Director, Shell Europe
“The OEM‑ODM tank design matched our offshore platform constraints perfectly – delivery in 28 days, on schedule.” – Jae‑Hoon K., Technical Director, Samsung Heavy Industries
All products comply with CE, ISO 9001, ASME, DOT, FCC, and regional environmental regulations.
Ask for Certification Copies →LNG is primarily methane (CH₄) cooled to –162 °C, while LPG is a mix of propane‑butane stored at near‑ambient pressure. LNG offers higher energy density (≈ 22 MJ/L) and lower carbon intensity, making it ideal for large‑scale power and industrial use.

Yes. Up to 20 % hydrogen by volume can be blended without major retrofits, improving carbon intensity by ~ 10 % (see IEA 2025 Gas Outlook).
Standard terms are 30 % T/T on order, 50 % upon loading, and 20 % after receipt of certificate of quality. Letters of credit (L/C) are also accepted for high‑value contracts.
Our cryogenic tanks incorporate vapor‑recovery compressors that re‑condense boil‑off gas back into the cargo, limiting loss to ≤ 0.12 %/day – the industry best‑in‑class figure.
We offer road‑tankers with ISO LNG containers, rail‑compatible tank cars, and dedicated LNG carriers for > 5 kt shipments. All routes are pre‑cleared for customs and have real‑time tracking via our SCADA portal.
Order a 5 kt free‑sample shipment within the next 14 days and receive a money‑back guarantee if purity falls below 96 %.
Contact us via any channel – we reply within 2 hours.
“The delivery speed cut our project schedule by 3 weeks. The real‑time temperature monitoring dashboard saved us from a potential boil‑off incident.” – David R., Operations Manager, TotalEnergies
“Compliance was a nightmare until Enric bundled CE, ISO 9001, and DOT docs. We passed the audit on day 1.” – Laura S., Procurement Lead, Siemens Energy
“The 0.12 %/day boil‑off rate is the lowest we’ve seen – saved us $45k on a 12 kt cargo.” – Mark T., Technical Director, GE Power
James K. Liu – Senior Gas‑Process Engineer with 22 years in cryogenic equipment design, former Lead Consultant for the International Gas Association, and published author of “Cryogenic Storage Technologies” (Springer, 2023). James has overseen > 150 LNG projects across Europe, North America, and Asia, ensuring compliance with ASME, CE, and ISO standards.
Ready to future‑proof your energy procurement?
Start Your LNG Project Today
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day