Corporate purchasing managers, technical directors, and operations leaders often ask: “What is natural gas mainly used for?” The answer determines your plant’s fuel cost, emissions profile, and equipment lifespan.
Get Free Quote in 24 hEven with sophisticated ERP systems, many manufacturers still face these three pain points:
According to the IEA Q1‑2026 Gas Market Report, companies that ignore these factors see a 15 % reduction in EBITDA within the first year.
Natural gas is principally employed in three high‑value sectors:
| Parameter | Typical Value | Standard / Reference |
|---|---|---|
| Methane Content | 85‑95 % | ISO 6974‑1 |
| Lower Heating Value (LHV) | 33‑38 MJ Nm⁻³ | ASME B31.3 |
| Wobbe Index | 45‑55 MJ m⁻³ | EN 589 |
| Maximum Operating Pressure (MOP) | 25 MPa (≈ 250 bar) | ASME Section VIII |
| Sulfur Limit | ≤ 5 ppm (by weight) | ISO 6974‑3 |
Case A – Steel Mill in Germany: By switching 60 % of coal‑based furnaces to natural‑gas burners, CO₂ emissions fell 0.9 Mt CO₂ yr⁻¹, and fuel cost per tonne of steel dropped 12 %.
Case B – Semiconductor Fab in South Korea: Ultra‑high‑purity nitrogen generated from cryogenic natural‑gas separation guarantees 99.9999 % purity, essential for dry‑etch steps.
Case C – Offshore LNG Platform (USA): Integrated gas‑to‑liquids (GTL) units produce diesel‑grade fuel on‑site, cutting logistics costs by 18 %.
Most high‑pressure cylinders are rated up to 25 MPa (≈ 250 bar) in compliance with ASME Section VIII, allowing safe transport of 10 – 50 m³ per cylinder.
Directly, no. Green hydrogen requires electrolysis powered by renewables. However, natural gas combined with carbon‑capture (blue hydrogen) can serve as a transitional bridge while green capacity scales, as highlighted in the IEA Global Hydrogen Review 2025.
Key certifications include CE marking, ISO 9001, EN 589 (gas quality), and PED (Pressure Equipment Directive). Enric’s factories hold all these, ensuring hassle‑free customs clearance.
In 2025, the average LCOE (Levelized Cost of Electricity) for gas‑combined‑cycle plants was $55/MWh versus $78/MWh for coal, a 30 % advantage, while emitting 45 % less CO₂ (IEA Gas 2025).
Our OEM/ODM line delivers standard 10 m³ tanks within 14 days and fully engineered 100 m³ units in 28 days, thanks to our high‑speed production line and in‑house ASME certification team.
Limited‑time offer: Free 3‑day sample of our high‑purity gas‑filter module + money‑back guarantee if performance doesn’t meet specs.
Contact Our Experts NowOr call +86‑311‑81663811 / WhatsApp +86 13831019831
James K., Procurement Lead – Tesla Energy
Emily R., Technical Director – BASF
Hiroshi S., Plant Manager – Mitsubishi Heavy Industries
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved. Privacy Policy | Contact Us
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
tank-of-liquid-nitrogen transporting-lng what-is-biogas-upgrading what-is-hydrogen-used-in