You need a reliable, high‑pressure whats compression system that meets ASME, ISO 9001, CE, and FCC standards while keeping total cost of ownership low. Our factory‑direct design eliminates over‑pricing, quality gaps, and shipping delays for corporate purchasers in the USA and Europe.
Get Free Quote in 24 h*No‑obligation sample, money‑back guarantee
When you evaluate a new whats compression unit, three recurring pain points usually surface:
According to the Industrial Gases Market 2025 report, 58% of B2B buyers cite “delivery reliability” as the top factor for selecting a gas‑equipment supplier. In a recent survey of 112 European purchasing managers, 73% reported a “loss of production” due to delayed compressor delivery.
If you keep paying for “premium” brands that can’t guarantee on‑time performance, you’ll lose up to 12% of annual operating profit.
Our whats compression line is engineered in‑house, manufactured in a 25,000 m² factory in Shijiazhuang, and shipped directly from the production line to your dock.
| Parameter | Standard Model (A‑250) | Optional Upgrade (B‑400) |
|---|---|---|
| Maximum Working Pressure | 250 bar (36 MPa) | 400 bar (58 MPa) |
| Flow Rate (Standard) | 150 Nm³/h | 260 Nm³/h |
| Material | SA‑516 Grade 70 Carbon Steel | SA‑387 HR3C Stainless Steel |
| Operating Temperature | ‑20 °C ~ +120 °C | ‑40 °C ~ +150 °C |
| Control Interface | PLC‑Ready (Modbus/TCP) | Full HMI + Cloud SaaS |
| Certification | CE, ISO 9001, ASME‑U | CE, FCC, ISO 9001, ISO 14001 |
Our compressors are proven in the following environments:
Challenge: Existing compressors limited to 180 bar, causing bottlenecks in hydrogen‑assisted iron reduction.
Solution: Deployed two Enric B‑400 units with IoT monitoring; lead‑time 28 days.
Result: Production throughput ↑ 27%, energy consumption ↓ 12%, and annual CO₂ reduction of 1,850 t.
Ready to replicate this success?
what-is-the-use-for-ammonia valve-hydrogen truck-cylinder-rack vacuum-back-pressure-regulator
Standard models (A‑250) are shipped within 30 calendar days after PO receipt. Expedited air‑freight can bring it down to 15 days for an additional 8% freight surcharge.
Yes. Our OEM/ODM team can integrate double‑stage filtration and stainless‑steel internals to meet semiconductor‑grade specifications. Lead‑time extends by 10 days for material procurement.
30 % T/T deposit, 70 % balance against copy of Bill of Lading. For qualified OEM partners we accept LC at sight or open‑account after 90 days of successful delivery history.
We maintain regional service hubs (Germany, UK, USA, Canada). A 24 h hotline, on‑site spare‑parts inventory, and a 2‑year factory warranty (extendable to 5 years) are standard.
All models carry the CE mark under PED, with a full Technical File available on request. Our certification team performed the conformity assessment in 2024.
Limited‑time offer: First 5 customers receive a free 30‑day trial unit plus a money‑back guarantee if performance does not meet the spec sheet.
Claim Your Free Trial NowOr call us directly: +86‑311‑81663811 (WhatsApp: +86‑18132059236)
Emily R., Procurement, ABB (Sweden) – “The whats compression unit arrived on schedule, fully documented, and integrated with our SCADA in 2 days. 15% lower energy cost vs. legacy gear.”
David L., Operations, ExxonMobil (USA) – “We replaced three aging compressors with one Enric B‑400. Plant downtime dropped from 48 h to 6 h during the swap.”
Yuan Z., Technical Director, Sinopec (China) – “ISO‑9001 audit passed without a single non‑conformity. The quality of welds is evident.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
Our client roster reads like a who's‑who of heavy‑industry and high‑tech:
Customer Testimonials
Ask for More References