Are you a corporate purchasing manager or technical director seeking cost-effective, high-quality LNG storage and transportation solutions? Our 40 ft LNG ISO container addresses major industry pain points such as high prices, inferior quality, and excessive shipping costs — designed specifically for efficiency and compliance in the USA and other English-speaking markets.
Don’t let these pain points undermine your operational efficiency. Discover how our solution overcomes these challenges.
Elevate your LNG storage & transport operations with our optimized containers designed for your ROI and safety priorities.
| Parameter | Specification | Details |
|---|---|---|
| Container Type | 40 ft LNG ISO Container | Standardized ISO dimensions ensuring intermodal transport compatibility |
| Gross Weight | Up to 36,000 kg | Includes container and LNG payload, optimized for truck and vessel transport |
| LNG Storage Capacity | 20,000 - 24,000 liters | Customizable based on insulation and vessel design |
| Insulation | Vacuum insulated panels + polyurethane foam | Minimizes heat ingress, maintaining LNG at -162°C |
| Material | Stainless Steel 316L inner tank, Carbon Steel outer shell | Corrosion resistant and durable for long-term use |
| Pressure Rating | 0.7 MPa design pressure | Meets ASME and DOT container standards |
| Certifications | ASME, DOT, CE, ISO 9001, CCS | Compliant with US & international regulatory requirements |
| Temperature Range | -196°C to ambient | Suitable for LNG storage and transport |
| Customization | OEM/ODM available | Options for valve placements, dimensions, and additional safety features |
lng iso tank 40ft lng iso container capacity lng iso tank container
Our containers exemplify integration of advanced materials and engineering excellence, ensuring safe, efficient LNG transport compliant with US and global standards.
The 40 ft LNG ISO container is expertly engineered for diverse industrial and commercial uses, including but not limited to:
Case Study: A USA-based energy supplier reduced LNG transport costs by 25% and improved delivery timelines by 30% after switching to our customized 40 ft LNG ISO containers with vacuum insulation and optimized valve layouts. Safety incidents dropped to near-zero with enabled monitoring sensors.
Typically, our standard 40 ft LNG ISO containers ship within 6-8 weeks after order confirmation. OEM/ODM customization may require 8-12 weeks depending on specifications.
Yes, we offer flexible OEM and ODM services, including customized insulation thickness, valve configuration, and instrumentation options to match your technical requirements.

Our LNG containers are certified to ASME Section VIII, DOT, ISO 1496-3, CE, and hold ISO 9001 quality management certification, ensuring compliance with USA and international standards.
We coordinate turnkey logistics including ocean freight, customs clearance, and inland transport. Our strong partnerships enable competitive shipping rates, significantly reducing your total landed cost.
We offer comprehensive support including installation guidance, training, maintenance planning, and 24/7 technical hotline to promptly address any operational issues.
Don't miss our limited-time offer: free LNG container sample inspection and money-back guarantee if requirements are unmet. Secure your project's success with proven quality and fast delivery.
Mark S., Supply Chain Manager, Texas LNG Co.
"Enric's 40 ft LNG ISO containers delivered on all fronts: on-time delivery, high-quality build, and excellent customer support. We saw a 37% cost reduction compared to our previous vendor."
Linda R., Operations Director, Green Energy Group
"The OEM customization option enabled us to optimize container dimensions and insulation. The team provided detailed technical support throughout installation and commissioning."
Kevin B., Technical Lead, North American Gas Solutions
"Their strict adherence to ASME and DOT standards gave us peace of mind in regulatory compliance. The containers handled multiple cross-border shipments flawlessly."
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Social Proof & Certifications
Shijiazhuang Enric Gas Equipment Co., Ltd. manufacturing facility – advanced production line for LNG containers.