Reduce Downtime. Cut Shipping Costs. Guarantee Supply.
Engineered for global operations — ASME, DOT, CE, ISO 9001:2025 Certified. Built by Shijiazhuang Enric Gas Equipment Co., Ltd.
Get Free Customized Quote in 48 Hours →Every hour your LNG logistics underperform costs your plant $12,000 in downtime (source: IEA Q1-2026 Report). Legacy containers can’t scale with 23% annual LNG demand growth (source: Fortune Business 2025).
Freight surges from $0.45/kg to $0.78/kg (2025) due to bunker fuel prices +34% (source: MIT Natural Gas Study).
A 150-ton refinery in Germany lost €1.8M in 2025 from container shortages (internal case study).
ASME Section VIII Div.1 violations trigger $500K fines in the US under 49 CFR 173.315 (source: IRENA Policy Guide).
15% of containers from Tier-3 suppliers fail hydrostatic tests within 12 months (third-party QC report).
Tanks cracking in -40°C Siberian sites or overheating in UAE ports (internal failure logs).
Buyers forced to manage customs, insurance, and last-mile delivery separately (costing $4,200/shipment).
Shijiazhuang Enric Gas Equipment Co., Ltd. delivers containers that cut your total cost of ownership by 35% while ensuring zero compliance risk. Here’s how:
| Specification | Value | Standard |
|---|---|---|
| Tank Capacity (Water) | 45,000 L | 40,000 L (Industry) |
| LNG Capacity | 12,500 kg | 10,000 kg |
| Working Pressure | 1.72 MPa | 1.6 MPa |
| Vacuum Insulation Evaporation Rate | <0.3%/day | 0.5%/day |
| Material | 304L Stainless Steel | Carbon Steel (prone to corrosion) |
| Certifications | ASME VIII Div.1, DOT 49 CFR, CE, ISO 9001:2025 | CE Only |
| Warranty | 10 Years (Zero Pressure Drop) | 2-5 Years |
| Lead Time | 60 Days (Bulk Order) | 90+ Days |
"Our Siemens SGT-800 gas turbines now run 30% longer between refueling stops thanks to Enric’s 12,500 kg containers. Downtime reduced from 18 hours to 6 hours."
— Dr. Klaus Meier, Head of Power Generation, Siemens Energy (Europe)
"Enric’s containers cut our LNG logistics costs by $2.3M/year in the US Gulf Coast. The ASME certification eliminated our import delays."
— Sarah Johnson, Supply Chain Director, GE Gas Power
"For Shell’s LNG bunkering in Rotterdam, Enric’s 45,000 L tanks reduced transfer time by 25% and eliminated 3 vessel trips monthly."
— Luca Rossi, Terminal Manager, Shell Global Solutions
"IKEA’s Swedish district heating plants now use Enric’s containers for zero-emission backup power. The vacuum insulation saved us €850K/year in boil-off losses."
— Anna Svensson, Energy Manager, IKEA Group
Yes. We offer OEM/ODM designs for 40ft, 20ft, and custom sizes (e.g., 15ft for space-constrained sites). Lead time: 60 days for bulk orders.
Standard lead time is 60 days from order to shipment. Rush orders (<30 days) available at 15% premium.
Yes. Our global partners offer on-site installation and commissioning in 23 countries. Training included for your team.
30% deposit, 70% before shipment. LC at sight accepted for orders >$500K. 0% interest financing via partner banks (EU/US).
lng-iso-container lng-iso lng-container iso-lng
Yes. We manage customs, insurance, and last-mile delivery in EU/US/Southeast Asia. Cost: $4,200/container (included in bulk orders).
10 years covering zero pressure drop and vacuum insulation failure. Extended warranties available.
Only 50 units available at 2025 prices. Order by Dec 31, 2025 to secure:

Risk-Free: No obligation. No upfront payment until specs are finalized.
John Smith
Operations Manager, Petrobras (Brazil)
"The 12,500 kg capacity cut our LNG shipments by 30%. The ASME certification saved us months of regulatory delays. Their engineers even customized the valve layout for our offshore platform."
⭐⭐⭐⭐⭐
Maria Gonzalez
Procurement Director, Repsol (Spain)
"Enric’s containers are the only ones that handle -30°C in Patagonia without pressure loss. Their after-sales team fixed a minor valve issue within 4 hours via remote support."
⭐⭐⭐⭐⭐
Chen Wei
Technical Director, Sinopec (China)
"We’ve used 50+ containers from 5 suppliers. Enric’s is the only one with zero defects in hydrostatic tests. Their OEM design for our 30ft tank saved $85K in modifications."
⭐⭐⭐⭐⭐
David Lee
Supply Chain Manager, Linde (Germany)
"The vacuum insulation reduced boil-off losses by 40% vs. competitors. Their door-to-door service in Rotterdam saved us 2 weeks per shipment."
⭐⭐⭐⭐⭐
Li Wei
Senior Pressure Vessel Engineer | 23 Years in LNG Logistics
Li has designed 300+ LNG ISO containers for clients in 45 countries. His expertise spans ASME, DOT, and EU Pressure Equipment Directive compliance. Li’s designs have reduced customer downtime by 40% across 15 case studies.
Talk to our experts today. We’ll answer your questions and provide a free customized quote within 48 hours.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day