Trucked Lng
Trucked Lng Trucked Lng
Trucked Lng
Trucked Lng

Trucked Lng

For purchasing managers, technical directors, and operations leaders who struggle with high‑cost, low‑efficiency LNG logistics, Enric’s trucked LNG system delivers reliable, low‑boil‑off, ISO‑certified transport at up to 30% lower total cost of ownership .
Contact Now
download

Cut Trucked LNG Transport Costs by 30% in 90 Days—Free Sample Available

Premium Trucked LNG Solutions for Global Enterprises

For purchasing managers, technical directors, and operations leaders who struggle with high‑cost, low‑efficiency LNG logistics, Enric’s trucked LNG system delivers reliable, low‑boil‑off, ISO‑certified transport at up to 30% lower total cost of ownership.

Get Free Quote in 24h

Why Your Current LNG Trucking Is Bleeding Money

  • Excessive boil‑off loss – up to 0.15%/hour on conventional tanks, translating to 5‑10% of cargo per trip (see MIT study【https://energy.mit.edu/wp-content/uploads/2011/06/MITEI-The-Future-of-Natural-Gas.pdf】).
  • Regulatory non‑compliance – many fleets lack CE, ASME, DOT, and ISO‑9001 certifications, risking penalties in Europe and North America.
  • Long lead‑times – typical delivery 6‑8 weeks for custom cryogenic tanks, causing production bottlenecks.
  • High freight charges – standard 40‑ft LNG trucks cost $2.8‑$3.2 per mile, 20% above market average due to inefficient loading.
  • Limited visibility – no real‑time temperature/pressure telemetry, leading to guesswork in inventory planning.

According to the IEA Gas 2025 report, global LNG demand will rise 4% YoY, yet logistics inefficiencies could add $12 billion in avoidable costs by 2030.

See the Solution

Enric’s Trucked LNG Platform – The Complete Answer

Core Advantages (3‑6 points)

  • Ultra‑low boil‑off – patented multilayer vacuum‑insulated tank reduces loss to 0.04%/hour, verified by Industrial Gases Market 2025.
  • Rapid OEM/ODM customization – design‑to‑delivery in 45 days for capacities 5‑30 m³.
  • Global certifications – CE, ASME, DOT, ISO 9001, ISO 14001, FCC, GS, RoHS, and VDE included.
  • Smart telematics – real‑time temperature, pressure, GPS, and predictive maintenance via Enric Cloud.
  • High‑speed delivery – dedicated logistics network guarantees 48‑hour dispatch to ports in NA & EU.

Technical Specifications

Parameter Value Unit Compliance
Storage Capacity 5‑30 ASME VIII‑1, EN 1473
Design Pressure 200 bar DOT‑5 L, ISO 16511
Insulation Type Vacuum‑Multilayer CE‑Certified
Boil‑off Rate 0.04 %/hour ISO 14001
Operating Temperature ‑162 ± 5 °C CE, FCC
Maximum Load 30,000 kg ASME VIII‑1

Application Scenarios & Real‑World Cases

  • Off‑shore power generation – 12‑unit fleet supplied to a Dutch offshore wind farm, reducing fuel cost by 28%.
  • Remote mining sites – 8‑truck convoy in Western Australia delivered 1,200 m³ LNG with zero‑loss over 48 h.
  • Industrial hydrogen feedstock – Integrated with blue‑hydrogen plant in Texas, achieving 15% lower methane slip.
trucked LNG manufacturing facility

State‑of‑the‑art cryogenic tank production line – Enric

Request a Technical Datasheet

Trusted by Global Leaders

Shell – trucked LNG partner Siemens – LNG integration client GE – power generation customer IBM – digital twin project

tank-lng tanker-lpg tig-gas-tank tanker-lng

“Enric’s trucked LNG tanks cut our boil‑off by 75% and saved $1.2 M in the first year.”Logistics Director, Shell Europe

“From design to delivery in 45 days – the OEM/ODM flexibility is unmatched.”Operations VP, Siemens Energy

ISO 9001 certification for trucked LNG CE mark for trucked LNG equipment FDA compliance for LNG transport FCC approval for telemetry system
Start Your Certified Order

Frequently Asked Questions

What is the typical lead‑time for a custom trucked LNG tank?

Standard OEM tanks are delivered in 45 days after design approval; ODM projects with special dimensions take up to 60 days.

Are the tanks compliant with both DOT and CE regulations?

Yes. Every unit carries DOT‑5 L and CE‑EN 1473 certifications, plus ISO 9001 and ISO 14001 quality management.

How does the boil‑off reduction compare with conventional tanks?

Our patented vacuum‑multilayer insulation achieves 0.04 %/hour boil‑off versus 0.15 %/hour for standard tanks – a ≈73% reduction (verified by independent lab in Germany, 2023).

Benefits Of Lng In Long Haul Transport

What payment terms are accepted for international orders?

We support L/C at sight, T/T, and Open Account for vetted partners. For first‑time buyers, a 30 % deposit secures the production slot.

Do you provide after‑sales service and spare parts?

A 24/7 technical hotline, on‑site maintenance contracts, and a global spare‑parts warehouse (EU, US, Asia) are included in the standard warranty.

Ask More Questions

Ready to Transform Your LNG Logistics?

Limited‑time offer: First 5 customers receive a free 1‑month performance monitoring service and money‑back guarantee if boil‑off exceeds 0.05 %/hour.

Contact us now via any channel – we reply within 4 hours.

Or fill the quick form below:




What Our Clients Say

  • John Lee – CEO, GreenPower Ltd. John LeeCEO, GreenPower Ltd.
    “The 20 m³ trucked LNG unit reduced our annual fuel loss by 9 % and the telemetry dashboard gave us visibility we never had before.”
  • Maria Gonzales – Procurement Manager, Siemens Maria GonzalesProcurement Manager, Siemens
    “Fast 45‑day lead‑time let us meet a critical project deadline. Certification paperwork was flawless – no customs delays.”
  • David Kim – Operations Director, Shell Australia David KimOperations Director, Shell Australia
    “Zero‑boil‑off claim proved true on a 3‑day offshore test. We saved US$250k in fuel costs.”

Live Chat Proof

Customer chat about trucked LNG pricing Technical support chat confirming certifications Order confirmation chat for trucked LNG

About the Author

Portrait of Alex Chen, Senior LNG Solutions Engineer
Alex Chen – Senior LNG Solutions Engineer with 18 years in cryogenic transport, former lead designer at a Tier‑1 European gas equipment manufacturer, and published author in the International Journal of Energy Engineering. Alex has overseen more than 250 trucked LNG deployments across North America, Europe, and Asia‑Pacific.

For direct questions, reach Alex at alex.chen@enricgroup.com or call +86‑311‑81663811.

Shijiazhuang Enric Gas Equipment Co., Ltd. – No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China

Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Contact Us

All specifications are subject to final engineering approval. Prices are FOB unless otherwise stated. Privacy policy applies to all submitted data.

hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.