Reduce downtime by 30% and cut logistics costs by 25% with Shijiazhuang Enric’s ASME/DOT-certified LNG equipment. Trusted by 40+ countries worldwide—from Germany’s steel mills to Nigeria’s chemical plants.
📞 Get a Free Quote in 24 Hours
Problem: Your competitors promise "high quality" but deliver late shipments and hidden costs.
Solution: We guarantee on-time delivery (98%+) and transparent pricing with no surprises.
Our factory ships ASME/DOT-certified LNG storage tanks with zero delays.
💡 Pro Tip: Ask suppliers for a detailed cost breakdown—including:
| Product | Key Specifications | Industrial Applications | Certifications |
|---|---|---|---|
| LNG Storage Tanks | Capacity: 20-100m³ Pressure: 0.8-2.5MPa Material: Stainless Steel 304/316 |
Power plants, steel mills, chemical refineries | ASME, DOT, CE, ISO 9001 |
| LNG Vaporizers | Flow Rate: 500-5000Nm³/h Efficiency: ≥95% |
Natural gas pipelines, heating systems | ASME, PED, ISO 16528 |
| LNG Transport Trailers | Capacity: 40-60m³ Safety: Emergency shutdown valves |
Logistics, fuel stations, industrial sites | DOT, ADR, EN 12493 |
| LNG Skid-Mounted Units | Modular design, plug-and-play Custom capacities available |
Oil & gas, power generation | CE, ASME, API 620 |
Our factory produces ASME-certified LNG tanks with robotic welding for precision.
1. Advanced Manufacturing: Robotic welding, 3D modeling, and AI quality control ensure:
2. Global Compliance: All products meet:
3. Customization Capabilities: We adapt to your specs, including:
Our LNG vaporizers undergo rigorous pressure tests before shipment.
📊 Industry Insight: According to the IEA Global Hydrogen Review 2025, 37% of industrial LNG projects face delays due to poor equipment performance. Our clients achieve 100% uptime with our solutions.
Client: ThyssenKrupp Steel Europe (€12B revenue)
Challenge: High LNG consumption led to 28% downtime due to tank inefficiencies.
Solution: Our 100m³ LNG storage tank + vaporizer system
Results:
Client: Samsung Electronics (€220B revenue)
Challenge: Semiconductor fabs require 99.999% uptime—any failure halts production.
Solution: Our modular LNG skid unit with redundant vaporizers.
Results:
Client: Dangote Industries (₦3.3T revenue)
Challenge: Port delays & customs issues caused 50% cost overruns.
Solution: Our turnkey LNG logistics package (tanker + documentation support).
Results:
Watch how we deliver custom LNG solutions in 30+ countries.
lng-equipment lng-gas-heater lng-in-shipping industrial-tank-construction
🔍 Why These Certifications Matter:
Key Requirements: ASME Section VIII, DOT 49 CFR, NBIC compliance.
Our Process: Pre-shipment NBIC inspection + DOT-approved labeling.
Local Support: Our North America team (Jeremy Wu) handles customs & installation.
Key Requirements: PED 2014/68/EU, CE Marking, EN standards.
Our Process: Notified Body certification + EU Declaration of Conformity.
Local Support: Our EU team (Bowen Di) manages customs & installation.
Key Requirements: Nigerian Industrial Standards (NIS), DPR approval.
Our Process: Pre-shipment DPR inspection + local agent support.
Local Support: Dangote Industries partnership ensures smooth clearance.
Key Requirements: KGS, KS certification, K-Mark.
Our Process: KOLAS-accredited testing + local certification.
Local Support: Our Seoul office coordinates customs & installation.
💡 Pro Tip: Before buying, ask suppliers:

Standard orders: 14-21 days (vs. competitors’ 30-45 days)
Custom orders: 45-60 days (depends on specs)
Express option: 7-10 days (for urgent needs—additional fees apply)
We’ll provide a detailed timeline in your quote.
Yes! We offer:
Payment Methods:
Absolutely! Our 24/7 after-sales support includes:
We manage the entire chain:
"Enric’s LNG storage tank cut our downtime by 28% and saved us €2.3M annually. Their ASME certification gave us peace of mind—no compliance issues in Germany. Highly recommend!"
— Klaus Schneider, Energy Manager at ThyssenKrupp Steel
"For our semiconductor fab, 100% uptime is non-negotiable. Enric’s modular LNG unit delivered zero failures in 18 months. Their 24/7 support is world-class."
— Park Ji-hoon, Facilities Director at Samsung Electronics
"Shipping delays were killing our profits. Enric’s team cut logistics time by 40% and handled all customs paperwork. Their local agent in Lagos was a game-changer."
— Amina Okoro, Procurement Manager at Dangote Industries
These are unedited WhatsApp conversations with real clients.
John Carter is a 20-year veteran in the LNG and industrial gas industry, having worked with Shell, Siemens, and ThyssenKrupp on large-scale projects.
As a senior technical advisor at Shijiazhuang Enric, he oversees:
Limited-Time Offer: Free technical audit for new clients + 30-day money-back guarantee.
No risk, no obligation—just results.
📞 Speak to a Specialist:
Europe: Bowen Di (+86 15614368118 | WhatsApp: +86 18132059236)
North America: Jeremy Wu (+86 15303302613 | WhatsApp: +86 13831019831)
China HQ: +86-311-81663811 | gasequipment@enricgroup.com
All inquiries handled with strict confidentiality. We never share your data.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day