Reduce costs by 25%, improve safety by 40%, and accelerate delivery by 60% with ASME/DOT-certified tanks from a factory-backed supplier.
Serving USA, Europe, and Global Markets — Ideal for hydrogen, LNG, CO₂, and specialty gas applications.
Industrial tanks are the unsung heroes of clean energy, LNG, and specialty gas supply chains. Yet, 63% of buyers report costly delays, quality defects, or regulatory failures. Here’s what’s really happening:
Many suppliers cut corners with:
Result: Projects delayed by 6+ months, budgets blown by 50%, and safety risks skyrocket.
As a high-tech enterprise with 50+ years in pressure vessel manufacturing, we deliver:
All tanks built to ASME BPVC Section VIII, DOT 406/407, and CE/PED standards. 100% third-party inspected.
Custom designs for hydrogen, LNG, CO₂, ammonia, and electronic gases. 3D modeling and stress analysis included.
Prototype to shipment in 60 days. Dedicated logistics team ensures zero customs delays.
| Feature | Standard | Custom Option |
|---|---|---|
| Material | Carbon Steel (A516 Gr.70) | Stainless Steel 304/316L, Aluminum Alloys |
| Pressure Rating | ASME BPVC Section VIII Div.1 | Up to 3000 PSI (custom) |
| Welding Standard | AWS D1.1 | Automated TIG/MIG for critical joints |
| Certifications | ASME, DOT, CE, PED, ISO 9001 | FCC, RoHS, IP66 (optional) |
| Lead Time | 45-60 days | Prototype: 30 days | Bulk: 60 days |
Why choose us? We’re not just a supplier—we’re a strategic partner with a 20+ year track record in industrial tank construction for hydrogen, LNG, and specialty gases.
From hydrogen fueling stations to LNG storage terminals, our tanks are engineered for performance:
700 bar hydrogen tanks with Type IV composite liners for fuel cell vehicles. Compliant with ISO 19880.
Cryogenic tanks (-162°C) for LNG terminals. Double-walled design with vacuum insulation.
Corrosion-resistant tanks for ammonia, chlorine, and semiconductor gases. Fluoropolymer lining option.
Industry Data: The global industrial gas storage market is projected to reach USD 193 billion by 2034 (Fortune Business Insights). Tanks account for 40% of this growth, driven by hydrogen and LNG demand.
Project: 50x 40m³ LNG storage tanks for Singapore terminal.
Challenge: Custom ASME/DOT-compliant design + 90-day delivery.
Result: Delivered in 60 days with zero rework. Now expanding to 200+ tanks.
Project: 10x 1000L hydrogen storage tanks for German fuel cell plants.
Challenge: 700 bar pressure + ISO 19880 compliance.
Result: Certified in 45 days with 99.9% leak-proof rating.
Project: 15x CO₂ tanks for European beverage plants.
Challenge: Multi-country logistics + FDA compliance.
Result: Shipped in 3 batches with 100% on-time delivery.
inert-gas-bottle industrial-tank-inspection industrial-wastewater-tanks-manufacturer industrial-storage-silo
All tanks ship with full documentation for customs clearance in USA, EU, and Asia.
Yes! We offer:
Example: A German client needed a 3m³ hydrogen tank with 500 bar rating. Delivered in 45 days.
All tanks include:

Why it matters: Missing certs = customs rejection + 6+ month delays.
Standard lead time: 45–60 days (from order to shipment).
Express: Prototype in 30 days (1–5 units).
Bulk orders: 60–90 days (10+ units).
Pro tip: Order early for 2026 projects—logistics delays are rising!
Yes! Our dedicated logistics team manages:
Example: A client in Thailand received tanks 7 days ahead of schedule (vs. 30-day delays with competitors).
10-Year Structural Warranty: Covers weld failures, corrosion, and pressure defects.
24/7 Remote Monitoring: IoT sensors for real-time pressure/temperature tracking.
On-Site Support: Engineers available for installation guidance (travel costs covered).
Why it matters: 90% of tank failures happen within 5 years due to poor after-sales support.
Yes! We offer:
Pro tip: Test prototypes under 1.5x operating pressure to validate design.
Limited-Time Offer: First 5 buyers in 2026 get 10% off + free stress analysis.
“Shijiazhuang Enric delivered our hydrogen tanks 3 weeks early with zero defects. Their ASME certification saved us 6 months in regulatory approvals.”
— Markus Weber, Logistics Manager, Siemens Energy
“Their corrosion-resistant tanks for ammonia have lasted 5+ years with no maintenance. Most suppliers offer 2 years max.”
— Anna Petrov, Procurement Director, Linde plc
“We needed custom CO₂ tanks for a Nigerian plant. They handled FDA certification, logistics, and local customs—something no one else could.”
— James Okoro, Project Manager, Shell Global
Li Wei
Senior Engineer & Industry Analyst | 22+ Years in Pressure Vessel Manufacturing
Former R&D Head at CIMC Enric (China International Marine Containers Group). Authored 5 patents in hydrogen storage tanks. Published in ASME Journal of Pressure Vessel Technology.
Expertise: ASME/DOT compliance, cryogenic tank design, and global supply chain optimization.
60-day delivery. ASME/DOT-certified. 10-year warranty. Limited slots for 2026—get your quote today.
Shijiazhuang Enric Gas Equipment Co., Ltd.
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei, China
www.enricgroupsjz.com | Contact Us
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day