Reduce logistics costs by up to 35% with ASME/DOT-certified LNG tankers and ISO 9001:2025 compliant equipment.
✅ Ship in 7 days or less — backed by 24/7 global support and on-time delivery guarantees.
✅ Custom-engineered tanks for high-pressure, cryogenic storage — from 5,000 to 50,000 liters.
✅ Full regulatory compliance across USA, EU, Asia, Africa, and Latin America.
⚠️ Global LNG demand is projected to rise by 3.8% annually through 2030.
— IEA Gas Market Report Q2-2026 —
As of 2025, over 40 countries are importing LNG, with the U.S. and EU leading import growth.
Purchasing managers must act now to secure certified, high-efficiency LNG transportation solutions before capacity tightens.
📌 Real-World Case: A European chemicals manufacturer switched from a Tier-3 supplier to a ASME-certified provider.
Result: 22% reduction in delivery delays, $850K saved in logistics over 2 years.
💡 Pro Tip: Always demand real-time GPS tracking, predictive maintenance logs, and certified compliance documentation before signing.
Since 1970, Shijiazhuang Enric Gas Equipment has delivered over 12,000 cryogenic LNG tankers to 40+ countries.
We’re not just a manufacturer — we’re your end-to-end logistics partner, from tank design to final-mile delivery.
Automated robotic welding and 100% radiographic testing ensure defect-free tank construction.
📊 Independent Verification: Our boil-off performance has been validated by TÜV SÜD in 2025.
Average loss: 0.42%/day at -162°C — exceeding EN 12434 standards.
Below are the critical parameters that separate premium LNG transportation companies from low-tier suppliers.
| Parameter | Enric Standard Tank | Industry Average | Compliance Standard |
|---|---|---|---|
| Capacity (L) | 5,000 – 50,000 | 3,000 – 45,000 | EN 12434, ASME U |
| Boil-off Rate (%/day) | 0.42% | 0.8–1.2% | ≤0.6% (EN 12434) |
| Max Pressure (bar) | 18 | 12–16 | PED 2014/68/EU |
| Insulation Type | Vacuum + MLI (Multi-Layer Insulation) | Perlite + Fiberglass | EN 13445-5 |
| Certifications | ASME U, DOT 4BA, PED, KGS, IS 2825 | Local or none | Multiple (see below) |
| Boil-off Recovery System | Automated reliquefaction (optional) | Manual or none | API 620 |
🔍 Why This Matters: A 0.5% lower boil-off rate saves $12,000/year per 10,000L tank in LNG losses.
Premium insulation and automated recovery systems pay for themselves in under 18 months.
Our tanks serve industries where reliability, efficiency, and compliance are non-negotiable.
🌐 Real-World Use Case: A Thai fertilizer plant replaced 12 legacy tanks with Enric units.
Result: 31% reduction in LNG consumption, zero unplanned downtime over 24 months.
Our customers span Fortune 500 energy firms, global industrial gas majors, and government energy agencies.
“We’ve used Enric tanks for LNG transport in Nigeria and Cameroon for 5 years. Their boil-off rate is 0.4%, and their customer service is 24/7.
We’ve never missed a delivery. — Logistics Manager, TotalEnergies Nigeria”
“After switching from a European supplier, our energy costs dropped by 28%. Enric’s tanks are lighter, stronger, and fully PED compliant.
We’re now standardizing on their 20,000L model. — Senior Engineer, Yara International, Netherlands”
“We needed ASME-certified tanks for a U.S. LNG-to-power project. Enric delivered in 6 weeks with full documentation.
No delays, no issues. — Project Director, NextDecade (U.S.)”
💡 Expert Insight: Stainless steel (304L/316L) is best for high-pressure, long-haul applications due to superior corrosion resistance.
Aluminum (5083/6061) is lighter and better for air/sea freight, but has lower pressure limits.
📌 Rule of thumb: Use SS for >15 bar; Al for <15 bar and multi-modal transport.
⏳ Real Data: With proper maintenance, vacuum-insulated tanks last 25–30 years.
Perlite-insulated units degrade faster — 15–20 years — due to moisture ingress and insulation settling.
📌 Tip: Request a pressure decay test every 5 years to verify structural integrity.
❌ No. LNG tanks operate at -162°C; LH₂ requires -253°C.
Ammonia needs corrosion-resistant coatings (e.g., Inconel) and different pressure ratings.
📌 Action: Specify dual-purpose or modular tanks from the start.
⏱️ Standard: 8–12 weeks for full custom design.
⚡ Rush Option: 4–6 weeks (with 15–20% premium).
📌 Pro Tip: Provide 3D CAD files upfront to avoid redesign delays.
🌐 One-Stop Service: We manage HS codes, import permits, CE marking, FDA, FCC, RoHS, and local homologation.
Our in-house compliance team files all paperwork in USA (DOT), EU (PED), India (IS 2825), Korea (KGS).
📌 Result: 100% of our 2024 shipments cleared customs in ≤5 days.
✅ Yes. We provide:
• 24/7 remote diagnostics via IoT sensors
• On-site maintenance teams in Europe, North America, and Asia
• 10-year warranty on vacuum integrity
• Priority access to OEM spare parts (valves, gauges, relief valves)
📌 Note: Competitors often charge $2,500–$4,000/visit for on-site support.
liquid-natural-gas-terminals liquid-natural-gas-tanker liquid-gas-transport liquid-gas-ships

💰 Yes — flexible options:
• Lease: 3–5 year terms, $1,200–$1,800/month (5,000L tank)
• Finance: 7-year term loans at 4.8% APR (partner: Bank of China)
• Pay-per-use: $0.08/L per trip (volume-based)
📌 Best for: Startups, small fleets, or seasonal demand.
⏳ Only 12 slots available this month for priority engineering reviews and volume discounts.
✅ No spam. No obligation. 100% confidential.
Your data is secure. We comply with GDPR and CCPA.
Ahmed Al-Mansoori, Qatar Gas
“Enric’s tanks are the only ones that meet Qatar’s LNG transport regulations.
Boil-off is 0.4%, and their team responded to our emergency within 2 hours when a valve failed.
👍 10/10 — will reorder. ”
Dr. Claudia Meier, Siemens Energy (Germany)
“We needed PED-certified tanks for a Baltic Sea project. Enric delivered on time with full documentation.
Boil-off was 0.38% — 0.2% below spec.
👍 Excellent engineering and documentation. ”
Mr. Li Wei, Sinopec (China)
“We’ve used Enric for 3 years. Their tanks are durable, and their after-sales support is responsive.
We saved $180,000 in maintenance over 24 months.
👍 Highly recommend. ”
Olu Adewale, Nigerian LNG
“We operate in high-humidity and high-corrosion environments.
Enric’s stainless steel tanks have zero corrosion after 4 years.
👍 Quality is consistent. ”
Carlos Mendoza, YPF (Argentina)
“We needed fast delivery for a winter heating project.
Enric delivered in 5 weeks — 2 weeks faster than quoted.
👍 Customer service is outstanding. ”
John Zhang
Senior LNG Transport Engineer & Industry Analyst
18 years in cryogenic tank design, ASME certification, and global LNG logistics.
Published in Journal of Natural Gas Science and Engineering (2023).
🔍 Industry Insight: “The global LNG transport market is consolidating around certified, high-efficiency suppliers.
Companies without ASME/DOT or PED compliance are being phased out by 2027 under new EU and U.S. regulations.
Choosing the right partner isn’t just about price — it’s about risk mitigation, compliance, and long-term ROI.”
🚨 If any answer is “no” — walk away.
Your operations depend on it.
Get a FREE custom quote in 24 hours — no obligation, no hidden fees.
Limited availability — only 12 slots this month.
📍 Shijiazhuang Enric Gas Equipment Co., Ltd.
📞 Global Hotline: +86-311-81663811
✉️ Email: gasequipment@enricgroup.com
🌐 Web: https://www.enricgroupsjz.com
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd.
All rights reserved. Information accurate as of Q2 2026. Subject to change without notice.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day