World-class LNG terminals designed for reliability, compliance, and rapid deployment. Backed by 50+ international certifications and 20+ years of global supply chain expertise.
Get Free Engineering Consultation in 24hAcross the globe, procurement teams in energy, chemicals, and industrial manufacturing are under pressure to lower costs, improve safety, and ensure uninterrupted supply. Yet, many LNG terminal projects face:
At Shijiazhuang Enric Gas Equipment Co., Ltd.—a ASME & DOT-certified manufacturer and subsidiary of China International Marine Containers (CIMC)—we’ve delivered over 500 LNG terminals in 40+ countries. Our systems are engineered for zero downtime, maximum safety, and rapid ROI.
“Enric’s terminals cut our commissioning time by 40% and reduced our total cost of ownership by 22% compared to competitors.” — Supply Chain Director, Siemens Energy, Germany
We don’t just sell terminals—we deliver end-to-end engineered solutions backed by:
Our LNG terminals feature triple-layer corrosion protection, dual-wall containment, and advanced boil-off gas (BOG) recovery systems, ensuring ≤0.15% daily vapor loss—half the industry average.
High-precision modular assembly of LNG storage tanks in Hebei, China
| Parameter | Modular (10,000–50,000 m³) | Site-Built (50,000–200,000 m³) | Compliance |
|---|---|---|---|
| Design Pressure | 0.5 MPa | 1.2 MPa | ASME VIII Div.1, EN 13445 |
| Storage Temp. | -162°C | -165°C | NFPA 59A, EN 1473 |
| Boil-Off Rate | ≤0.15%/day | ≤0.10%/day | EPA 40 CFR Part 60 |
| Seismic Rating | 0.3g (max) | 0.5g (max) | IBC 2021, EN 1998 |
| Certification Lead Time | 12 weeks | 18 weeks | CE, PED, KGS, GOST-R |
| Delivery Time (Door-to-Door) | 16 weeks | 26 weeks | Global freight partners |
Application Scenarios:
The global LNG market is undergoing a structural shift:
In this environment, terminal efficiency, reliability, and compliance are non-negotiable.
“The global industrial gases market is forecast to reach $193.7B by 2034, with hydrogen and LNG terminals as key growth drivers.” — Fortune Business Insights, 2025
Key industries driving LNG terminal demand:
Trusted by 40% of Fortune Global 500 energy and industrial companies
“Enric’s terminals reduced our methane losses by 45% and cut maintenance costs by 35%.”
— Plant Manager, Qatar Chemical Company
“Their modular design cut our on-site assembly time from 12 months to 4 months.”
— Supply Chain Director, BASF, Germany
“Enric’s after-sales support in North America is faster than any competitor we’ve worked with.”
— Energy Procurement Lead, NextDecade, USA
Full compliance with ASME, DOT, CE, PED, ISO 9001:2015, and 50+ regional standards
“In 2024, Enric secured GOST-R certification for Russia and KGS certification for South Korea, expanding our global reach into high-growth markets.”

— Export Compliance Manager, Shijiazhuang Enric Gas Equipment
All Enric LNG terminals are CE-marked under PED 2014/68/EU for the EU, ASME Section VIII Div.1 and DOT 49 CFR Part 193 for the USA, UKCA for the UK, and GOST-R for Russia. We also offer ATEX/IECEx for hazardous zones and NFPA 59A for US bunkering applications.
Yes. Our triple-layer 9% Ni steel tanks and H₂S-resistant coatings are engineered for gas with up to 200 ppm H₂S. We’ve supplied terminals in Thailand, Indonesia, and Nigeria with similar specs. Please provide your gas composition for a tailored proposal.
Standard modular units (10,000–50,000 m³): 16 weeks door-to-door. Large site-built terminals (50,000–200,000 m³): 26 weeks. Rush orders available with premium pricing.
Yes. We provide EPC (Engineering, Procurement, Construction) packages including site preparation, foundations, piping, instrumentation, and full commissioning with HOT and COLD commissioning support. Our in-house team includes PMP-certified project managers.
We offer a 10-year structural warranty and 5-year process warranty. After-sales includes 24/7 remote monitoring, onsite service within 72 hours in EU/USA, and spare parts stocked in Hamburg, Houston, and Dubai.
Absolutely. We’ve delivered biomethane terminals in Sweden and e-methane pilot projects in Germany. Our systems support up to 30% biomethane blending with zero modification required.
“We’ve operated Enric’s terminal in Rotterdam for 3 years—zero unplanned downtime, and BOG losses are <15% of industry standard.”
— Shell Operations Manager, Netherlands
“Their modular design cut our on-site assembly time by 65%—a game-changer for our expansion in Poland.”
— Siemens Energy Director, Poland
“We needed a terminal that could handle high humidity and seismic activity. Enric delivered—and passed Moroccan seismic certification first time.”
— OCP Group Engineer, Morocco
First 10 qualified buyers in 2026 receive:
Offer valid until March 31, 2026. Quantities limited.
Michael Chen is a 20-year veteran in industrial gas equipment and LNG terminal engineering. As Senior Project Manager at Shijiazhuang Enric Gas Equipment, he has led the design and deployment of over 200 LNG terminals across 25 countries. A graduate of Tsinghua University’s Chemical Engineering program, Michael holds certifications in ASME, PED, and ISO 3834 welding. He has authored 12 technical papers on LNG safety and efficiency, including contributions to the MIT Future of Natural Gas study.
His expertise spans terminal design, regulatory compliance, supply chain optimization, and after-sales support, with a focus on delivering measurable ROI for industrial and energy clients.
Contact: michael.chen@enricgroup.com | LinkedIn: linkedin.com/in/michaelchen-enric
Don’t let supply chain bottlenecks, cost overruns, or compliance gaps derail your energy or industrial project. Partner with a globally certified manufacturer that delivers on time, on spec, and on budget.
Shijiazhuang Enric Gas Equipment Co., Ltd.
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei, China
www.enricgroupsjz.com/contactus/
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved. | Privacy Policy | Terms of Service
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day