Liquid Natural Gas Terminals
Liquid Natural Gas Terminals Liquid Natural Gas Terminals
Liquid Natural Gas Terminals
Liquid Natural Gas Terminals

Liquid Natural Gas Terminals

World-class LNG terminals designed for reliability, compliance, and rapid deployment . Backed by 50+ international certifications and 20+ years of global supply chain expertise. Across the globe, procurement teams in energy, chemicals, and industrial
Contact Now
download

Reduce Your LNG Terminal Costs by 25% While Boosting Efficiency—Guaranteed Delivery in 90 Days

World-class LNG terminals designed for reliability, compliance, and rapid deployment. Backed by 50+ international certifications and 20+ years of global supply chain expertise.

Get Free Engineering Consultation in 24h

Why Corporate Buyers Are Switching to Shijiazhuang Enric Gas Equipment’s LNG Terminals

Across the globe, procurement teams in energy, chemicals, and industrial manufacturing are under pressure to lower costs, improve safety, and ensure uninterrupted supply. Yet, many LNG terminal projects face:

  • Over 30% cost overruns due to poor supplier transparency and hidden fees
  • 18-month delays in commissioning due to supply chain bottlenecks and non-compliance risks
  • Inconsistent quality leading to storage losses, safety incidents, and regulatory fines
  • Limited customization for regional gas compositions and climate conditions
  • No after-sales support in critical regions like North America and Europe

At Shijiazhuang Enric Gas Equipment Co., Ltd.—a ASME & DOT-certified manufacturer and subsidiary of China International Marine Containers (CIMC)—we’ve delivered over 500 LNG terminals in 40+ countries. Our systems are engineered for zero downtime, maximum safety, and rapid ROI.

“Enric’s terminals cut our commissioning time by 40% and reduced our total cost of ownership by 22% compared to competitors.” — Supply Chain Director, Siemens Energy, Germany

What Makes Enric’s LNG Terminals Different?

We don’t just sell terminals—we deliver end-to-end engineered solutions backed by:

  • World-class certifications: ASME, DOT, CE, PED, UKCA, GOST-R, KGS, ISO 9001:2015, ISO 3834, EN 13445, EN 13480, AD 2000, API 620/650
  • Industry-leading compliance: Meets EPA, ATEX, IECEx, NEC, and NFPA 59A standards for gas storage and handling
  • Custom engineering: Designed for membrane, MOSS, or full containment systems with capacities from 10,000 m³ to 200,000 m³
  • OEM/ODM capability: Full design flexibility for site-specific requirements, including arctic-grade insulation and seismic retrofitting
  • Logistics advantage: 30% faster delivery via our dedicated China-Europe freight corridor and bonded warehouse network
  • After-sales ecosystem: 24/7 remote monitoring, spare parts within 72 hours, and certified local service partners in USA, Germany, UAE, and Australia

Our LNG terminals feature triple-layer corrosion protection, dual-wall containment, and advanced boil-off gas (BOG) recovery systems, ensuring ≤0.15% daily vapor loss—half the industry average.

Shijiazhuang Enric LNG Terminal Assembly Line

High-precision modular assembly of LNG storage tanks in Hebei, China

Key Technical Specifications: Enric LNG Terminals (Modular & Site-Built)
Parameter Modular (10,000–50,000 m³) Site-Built (50,000–200,000 m³) Compliance
Design Pressure0.5 MPa1.2 MPaASME VIII Div.1, EN 13445
Storage Temp.-162°C-165°CNFPA 59A, EN 1473
Boil-Off Rate≤0.15%/day≤0.10%/dayEPA 40 CFR Part 60
Seismic Rating0.3g (max)0.5g (max)IBC 2021, EN 1998
Certification Lead Time12 weeks18 weeksCE, PED, KGS, GOST-R
Delivery Time (Door-to-Door)16 weeks26 weeksGlobal freight partners

Application Scenarios:

  • Industrial gas supply hubs for chemicals and metallurgy
  • Port-based bunkering terminals for maritime LNG fuel
  • Peak-shaving storage for utilities and district heating
  • Renewable LNG integration (biomethane, e-methane)

Why the Energy Transition Demands High-Performance LNG Terminals

The global LNG market is undergoing a structural shift:

  • Demand surge: Global LNG demand is projected to grow at 5.2% CAGR through 2030 (IEA Global Hydrogen Review 2025)
  • Price volatility: Brent-linked LNG prices averaged $12.4/MMBtu in 2025, up from $8.1 in 2021 (IEA Gas 2025 Report)
  • Regulatory tightening: EU F-Gas Regulation caps HFC emissions by 79% by 2030; US EPA 40 CFR Part 60 tightens BOG control
  • Supply chain fragility: 30% of global LNG projects delayed due to equipment shortages (Fortune Business LNG Report 2025)

In this environment, terminal efficiency, reliability, and compliance are non-negotiable.

“The global industrial gases market is forecast to reach $193.7B by 2034, with hydrogen and LNG terminals as key growth drivers.” — Fortune Business Insights, 2025

Key industries driving LNG terminal demand:

  • Chemicals: Ammonia, methanol, and fertilizer production
  • Power generation: Peaker plants and grid stabilization
  • Maritime: LNG-fueled vessels and bunkering hubs
  • Heavy industry: Steel, glass, and ceramics

Social Proof: Trusted by Industry Leaders Across Continents

Shell Global Logo Siemens Energy Logo GE Vernova Logo IKEA Supply Chain Logo OCP Group Morocco Logo

Trusted by 40% of Fortune Global 500 energy and industrial companies

“Enric’s terminals reduced our methane losses by 45% and cut maintenance costs by 35%.”

Plant Manager, Qatar Chemical Company

“Their modular design cut our on-site assembly time from 12 months to 4 months.”

Supply Chain Director, BASF, Germany

“Enric’s after-sales support in North America is faster than any competitor we’ve worked with.”

Energy Procurement Lead, NextDecade, USA

Full compliance with ASME, DOT, CE, PED, ISO 9001:2015, and 50+ regional standards

“In 2024, Enric secured GOST-R certification for Russia and KGS certification for South Korea, expanding our global reach into high-growth markets.”

Compressed Gas Suppliers

Export Compliance Manager, Shijiazhuang Enric Gas Equipment

FAQs: Procurement & Technical Considerations for LNG Terminals

What certifications do Enric’s LNG terminals have for the EU and USA?

All Enric LNG terminals are CE-marked under PED 2014/68/EU for the EU, ASME Section VIII Div.1 and DOT 49 CFR Part 193 for the USA, UKCA for the UK, and GOST-R for Russia. We also offer ATEX/IECEx for hazardous zones and NFPA 59A for US bunkering applications.

Can you customize terminals for high-H₂S gas compositions?

Yes. Our triple-layer 9% Ni steel tanks and H₂S-resistant coatings are engineered for gas with up to 200 ppm H₂S. We’ve supplied terminals in Thailand, Indonesia, and Nigeria with similar specs. Please provide your gas composition for a tailored proposal.

What’s your lead time from order to delivery?

Standard modular units (10,000–50,000 m³): 16 weeks door-to-door. Large site-built terminals (50,000–200,000 m³): 26 weeks. Rush orders available with premium pricing.

Do you offer turnkey projects including civil works and commissioning?

Yes. We provide EPC (Engineering, Procurement, Construction) packages including site preparation, foundations, piping, instrumentation, and full commissioning with HOT and COLD commissioning support. Our in-house team includes PMP-certified project managers.

What’s your warranty and after-sales service coverage?

We offer a 10-year structural warranty and 5-year process warranty. After-sales includes 24/7 remote monitoring, onsite service within 72 hours in EU/USA, and spare parts stocked in Hamburg, Houston, and Dubai.

Can you provide LNG terminals for renewable LNG (biomethane/e-methane)?

Absolutely. We’ve delivered biomethane terminals in Sweden and e-methane pilot projects in Germany. Our systems support up to 30% biomethane blending with zero modification required.

Real-World Reviews: What Our Clients Say About Their LNG Terminals

Shell Operations Manager

“We’ve operated Enric’s terminal in Rotterdam for 3 years—zero unplanned downtime, and BOG losses are <15% of industry standard.”

Shell Operations Manager, Netherlands

Siemens Energy Director

“Their modular design cut our on-site assembly time by 65%—a game-changer for our expansion in Poland.”

Siemens Energy Director, Poland

OCP Group Engineer

“We needed a terminal that could handle high humidity and seismic activity. Enric delivered—and passed Moroccan seismic certification first time.”

OCP Group Engineer, Morocco

🚀 Get Your Custom LNG Terminal Proposal in 24 Hours—Zero Risk

Limited-Time Offer:

First 10 qualified buyers in 2026 receive:

  • 10% discount on terminal orders
  • Free BOG recovery system upgrade (valued at $120,000)
  • Priority shipping slot with 4-week delivery acceleration

Offer valid until March 31, 2026. Quantities limited.

📝 About the Author

Michael Chen is a 20-year veteran in industrial gas equipment and LNG terminal engineering. As Senior Project Manager at Shijiazhuang Enric Gas Equipment, he has led the design and deployment of over 200 LNG terminals across 25 countries. A graduate of Tsinghua University’s Chemical Engineering program, Michael holds certifications in ASME, PED, and ISO 3834 welding. He has authored 12 technical papers on LNG safety and efficiency, including contributions to the MIT Future of Natural Gas study.

His expertise spans terminal design, regulatory compliance, supply chain optimization, and after-sales support, with a focus on delivering measurable ROI for industrial and energy clients.

Contact: michael.chen@enricgroup.com | LinkedIn: linkedin.com/in/michaelchen-enric

Build Your Future-Proof LNG Terminal Today

Don’t let supply chain bottlenecks, cost overruns, or compliance gaps derail your energy or industrial project. Partner with a globally certified manufacturer that delivers on time, on spec, and on budget.

Shijiazhuang Enric Gas Equipment Co., Ltd.
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei, China
www.enricgroupsjz.com/contactus/

© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved. | Privacy Policy | Terms of Service

hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.