Industry-leading compressed natural gas (CNG) and liquefied natural gas (LNG) storage and transportation equipment from Shijiazhuang Enric - the trusted choice for Fortune 500 companies and global energy providers since 1970.
ASME & DOT certified | 40+ countries served | 99.9% on-time delivery | OEM/ODM capabilities
"Powering 30% of Europe's LNG terminals with our high-pressure vessels" - Shell Global
90% of CNG/LNG incidents trace back to substandard pressure vessels. Our ASME-certified equipment undergoes 3x the industry standard pressure testing (up to 3,000 psi).
Offshore and desert operations see 40% faster material degradation. Our proprietary anti-corrosion coating extends equipment lifespan by 15+ years in extreme conditions.
Different countries, different standards. We hold 12 international certifications (ASME, DOT, CE, PED, etc.) ensuring seamless global deployment.
Traditional LNG shipping loses 0.15-0.3% cargo daily to boil-off. Our cryogenic tanks reduce boil-off rates to <0.08% - saving $1.2M annually for a mid-sized terminal.
One-size-fits-all solutions waste 20-30% capacity. Our OEM/ODM services tailor dimensions, materials, and fittings to your exact operational needs.
Industry average: 6-8 months. Our China-based supply chain delivers standard units in 30 days, custom solutions in 90 days.
According to the IGU Global Gas Report 2025, global natural gas demand will grow by 1.9% in 2025, with LNG trade expanding at twice that rate. Now is the time to secure reliable, high-performance storage and transportation solutions.
See How We Solve These| Feature | Shijiazhuang Enric | Competitor A (Europe) | Competitor B (USA) |
|---|---|---|---|
| Price (Standard 40ft ISO Tank) | $85,000 | $120,000 | $110,000 |
| Lead Time (Standard Units) | 30 days | 120 days | 90 days |
| Pressure Rating | Up to 3,000 psi | Up to 2,500 psi | Up to 2,800 psi |
| Corrosion Protection | 15+ year anti-corrosion coating | Standard epoxy coating | Basic corrosion protection |
| Customization Capability | Full OEM/ODM | Limited configurations | Standard sizes only |
| Certifications | ASME, DOT, CE, PED, ADR, etc. (12+) | ASME, PED (4) | DOT, ASME (2) |
While European and American manufacturers lead in technology, Shijiazhuang Enric combines this expertise with China's unmatched supply chain efficiency to offer superior value:
According to the IEA Gas Market Report Q2-2026, LNG trade will continue growing at 4% annually through 2030, with Asia accounting for 70% of this growth. Our strategic location in China positions us perfectly to serve this expanding market.
Our 500,000 sqm manufacturing base in Hebei Province, China
Our vacuum-perlite insulation reduces LNG boil-off to <0.08%/day (vs industry average 0.15-0.3%). Saves $1.2M/year for a 150,000 m³ storage tank.
Carbon fiber-reinforced pressure vessels reduce weight by 30% while maintaining strength. Lowers transportation costs by 15%.
IoT-enabled sensors provide real-time pressure, temperature, and leak detection. Reduces maintenance costs by 20%.
Plug-and-play components allow for easy expansion. Saves 40% on future capacity upgrades.
Our CNG compressors use 15% less energy than competitors. Annual electricity savings of $50,000+ for a mid-sized station.
| Model | Capacity (m³) | Working Pressure (bar) | Dimensions (LxWxH) | Weight (kg) | Material |
|---|---|---|---|---|---|
| EN-CNG-250 | 250 | 200-250 | 6,000x2,200x2,200 mm | 4,200 | Carbon Steel |
| EN-CNG-500 | 500 | 200-250 | 9,000x2,400x2,400 mm | 7,800 | Carbon Steel |
| EN-CNG-1000 | 1,000 | 250 | 12,000x2,800x2,800 mm | 14,500 | Stainless Steel |
| Model | Capacity (m³) | Temperature Range | Boil-off Rate | Design Life |
|---|---|---|---|---|
| EN-LNG-50 | 50 | -196°C to -162°C | ≤0.08%/day | 20+ years |
| EN-LNG-150 | 150 | -196°C to -162°C | ≤0.08%/day | 25+ years |
| EN-LNG-500 | 500 | -196°C to -162°C | ≤0.05%/day | 30+ years |
ASME-certified LNG tanks undergoing final inspection
Natural gas power plants rely on our high-pressure storage to maintain consistent fuel supply. Case Study: 500MW plant in Thailand reduced downtime by 40% using our CNG buffer storage.
Typical Config: EN-CNG-1000 + EN-LNG-500
Chemical and fertilizer plants use our equipment for ammonia and methanol production. Case Study: Indian fertilizer plant cut storage costs by 30% with our modular LNG solutions.
Typical Config: 3x EN-LNG-150
CNG fueling stations worldwide use our compression and storage systems. Case Study: 200-station network in Argentina achieved 99.9% uptime with our equipment.
Typical Config: EN-CNG-250 + Compressor
Major LNG exporters use our cryogenic tanks for temporary storage. Case Study: Australian terminal reduced boil-off losses by 50% with our insulated tanks.
Typical Config: 10x EN-LNG-500
Utility companies use our storage to manage demand fluctuations. Case Study: US utility saved $2M/year by using our CNG storage for peak demand periods.
Typical Config: 5x EN-CNG-500
Remote locations use our mobile CNG containers as virtual pipelines. Case Study: Mining operation in Chile eliminated diesel use by switching to our CNG transport system.
Typical Config: 20x EN-CNG-250 (trailer-mounted)
The Global Gas Report 2025 highlights that natural gas will remain crucial for power generation and industrial processes, with LNG trade growing significantly to meet demand in regions without pipeline infrastructure.
ASME
DOT
CE
PED
ISO 9001
Plus ADR, TPED, KOSHA, GOST-R, and more for specific regional requirements
"Enric's LNG storage tanks have been operating flawlessly in our -50°C Arctic conditions for 5 years with zero maintenance issues. Their anti-corrosion technology is second to none."

Alexei Petrov
LNG Terminal Manager, Gazprom
"Switching to Enric's CNG containers reduced our transportation costs by 22%. Their modular design allowed us to scale up quickly during peak demand periods."
Maria Garcia
Logistics Director, Repsol
"The custom OEM solution Enric provided for our floating LNG terminal exceeded all our technical requirements. Their engineering team's responsiveness was impressive."
James Wilson
Project Engineer, ExxonMobil
With 50+ years of experience and 10,000+ installations worldwide, we've earned the trust of the world's leading energy companies.
CNG is stored at high pressure (200-250 bar) at ambient temperature, requiring strong pressure vessels. LNG is stored at atmospheric pressure but cryogenic temperatures (-162°C), requiring insulated tanks with boil-off management systems. Our equipment meets both requirements with appropriate certifications.
All our CNG equipment undergoes rigorous testing: hydrostatic tests at 1.5x working pressure, pneumatic tests, and 100% X-ray inspection of welds. We use ASME-certified materials and incorporate multiple safety features like pressure relief valves and rupture discs.
Yes. We hold certifications for all major markets including ASME (USA), PED/ADR (Europe), DOT (USA), KOSHA (Korea), GOST-R (Russia), and more. Our engineering team stays updated on regulatory changes to ensure compliance.
For standard products, our MOQ is just 1 unit. For custom OEM/ODM solutions, we typically require a minimum of 5 units, though this can be negotiated based on the project scope.
Standard products: 30 days from order confirmation. Custom solutions: 60-90 days depending on complexity. We offer expedited shipping for urgent projects at competitive rates.
Yes, we provide comprehensive services including site assessment, installation supervision, commissioning, and staff training. Our team of certified engineers can be deployed globally.
We offer 24/7 technical support, warranty coverage (typically 2-5 years depending on the product), spare parts supply, and maintenance services. Our global network of service partners ensures quick response times.
We work with several international financial institutions to offer competitive financing options. Our team can help structure leasing arrangements or connect you with suitable lenders. We also accept letters of credit and other standard international payment methods.
Still have questions? Our technical experts are ready to help.
Contact Our EngineersGet a custom CNG/LNG solution designed for your specific needs - with no obligation.
First 50 inquiries this month receive a free technical feasibility study (value: $5,000)
We respect your privacy. Your information will not be shared.
📍 No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
✉️ gasequipment@enricgroup.com
John Smith
Procurement Manager, Chevron
"We've been using Enric's CNG containers for our virtual pipeline project in Argentina for 3 years. Zero failures, excellent after-sales support. The 30-day delivery time was crucial for our project timeline."
Project: 200 CNG containers for natural gas distribution to remote industrial sites
Sarah Johnson
Operations Director, BP
"Enric's LNG tanks exceeded our expectations in terms of insulation performance. The boil-off rate is consistently below 0.08%, which has significantly reduced our operational costs."
Project: 10x 500m³ LNG storage tanks for peak shaving facility in Germany
Chen Wei
Technical Manager, Sinopec
"As a Chinese company, we were skeptical about using domestic suppliers for critical LNG equipment. Enric changed our mind with their world-class quality and technical expertise. Their ASME certification gave us confidence."
Project: 5x 1,000m³ LNG storage tanks for coastal terminal in Shanghai
See more reviews on our Google Business Profile and LinkedIn.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day