Maximize energy efficiency and sustainability with Shijiazhuang Enric’s biogas CHP systems—designed for manufacturing, agriculture, and waste management. Reduce costs by 30%, cut emissions by 40%, and achieve energy independence.
Industrial sectors face mounting pressure to reduce carbon footprints while maintaining operational efficiency. Traditional fossil fuel-based systems are no longer viable due to:
Biogas CHP systems convert waste into energy, addressing all these pain points simultaneously.
| Pain Point | Traditional Solution | Biogas CHP Solution |
|---|---|---|
| High energy costs | Dependence on grid electricity or diesel generators | On-site power generation with 90%+ efficiency, reducing energy bills by up to 50% |
| Carbon emissions | Fossil fuel combustion releases CO₂ | Net-zero or negative emissions (when using agricultural waste), aligning with ESG goals |
| Waste disposal | Landfills or incineration (costly and polluting) | Anaerobic digestion converts waste to biogas, eliminating disposal fees and generating revenue |
Data Source: IRENA Green Hydrogen Report 2024
Shijiazhuang Enric Gas Equipment Co., Ltd. leverages 50+ years of expertise in clean energy to deliver biogas CHP systems that outperform competitors in efficiency, reliability, and scalability. Our systems integrate:
Shijiazhuang Enric’s state-of-the-art biogas CHP manufacturing facility in Hebei, China.
Unlike one-size-fits-all providers, we tailor solutions to your specific feedstock, capacity, and energy demands:
Feedstock: Manure, crop residues
Output: 500 kW–2 MW
Use Case: Dairy farms, livestock operations
Savings: $200K–$500K/year in energy costs
Feedstock: Municipal solid waste
Output: 1–10 MW
Use Case: City landfills, waste management
Savings: $1M+/year + carbon credits
Feedstock: Sludge, organic wastewater
Output: 200 kW–5 MW
Use Case: Municipal/industrial plants
Savings: 40% reduction in grid dependency
Competitive Edge: Unlike competitors like GE Jenbacher or Caterpillar, our systems offer 20% lower CAPEX due to China’s integrated supply chain, without compromising on European/US certifications (CE, EPA, UL).
Our biogas CHP systems meet ISO 9001, CE, EPA, UL, DOT, and regional standards for Europe, USA, and Asia.
| Component | Specification | Benefit |
|---|---|---|
| Biogas Engine | 100 kW–10 MW, 42–45% electrical efficiency | Higher efficiency than standard 35–40% engines |
| Heat Recovery Unit | 85–90% thermal recovery rate | Maximizes total energy output to 80–90% |
| Gas Treatment System | H₂S < 100 ppm, CO₂ < 5% | Protects engine longevity and meets emissions standards |
| Control System | PLC + AI monitoring, remote access | Reduces downtime by 30% with predictive maintenance |
| Emissions Compliance | NOₓ < 250 mg/Nm³, CO < 1,000 mg/Nm³ | Meets EU 2015/2193 and EPA 40 CFR Part 60 |
Note: Custom configurations available for high-altitude, extreme climates, or specialized feedstocks.
Shijiazhuang Enric Biogas CHP: 88% total efficiency (45% electrical + 43% thermal)
Diesel Generator: 35% efficiency (electrical only)
Grid Electricity + Boiler: 50% efficiency (35% electrical + 15% thermal)
CO₂ Reduction: 1,200 tons/year (for a 1 MW system)
NOₓ Reduction: 90% vs. diesel
Particulate Matter: Near-zero
Challenge: $800K/year in electricity and waste disposal costs for 5,000-head dairy farm.
Solution: 2 MW biogas CHP system using manure and crop residues.
Results:
Challenge: 500,000 tons/year of municipal waste with high methane emissions.
Solution: 5 MW biogas CHP + gas upgrading for grid injection.
Results:
Challenge: High energy costs and waste from palm oil production (200 tons/day of POME).
Solution: 1.5 MW biogas CHP with anaerobic digestion of POME (Palm Oil Mill Effluent).
Results:
Average ROI for Shijiazhuang Enric Biogas CHP Systems
| System Size | CAPEX | Annual Savings | Payback Period | IRR |
|---|---|---|---|---|
| 500 kW | $1.2M | $350K | 3.4 years | 32% |
| 1 MW | $2.0M | $600K | 3.3 years | 35% |
| 5 MW | $8.5M | $2.5M | 3.4 years | 38% |
Note: Savings include energy cost reductions, waste disposal savings, and carbon credit revenues.
Data Source: Internal Shijiazhuang Enric case studies (2023–2025)
Our biogas CHP systems power operations for global brands:
Mark Johnson
Operations Manager, Wisconsin Dairy Cooperative
"Shijiazhuang Enric’s biogas CHP system reduced our energy costs by 75% and turned our waste into a profit center. The team’s expertise in anaerobic digestion was unmatched—we had zero downtime in the first year."
ROI Achieved: 3.2 years
Dr. Anna Schmidt
Environmental Director, Dortmund Waste Management
"With Enric’s 5 MW CHP system, we now power 10,000 homes and heat 5,000 more—all from landfill gas. The emissions reduction helped us meet EU 2030 targets early."
CO₂ Avoided: 12,000 tons/year
Ahmed Hassan
Plant Manager, Malaysian Palm Oil Mill
"This system paid for itself in 3 years by eliminating our energy bills and waste disposal costs. The RSPO certification also opened new export markets for us."

Annual Savings: $1.2M
Global Compliance: Our systems meet US EPA 40 CFR Part 60, EU 2015/2193, and Asian standards for emissions, safety, and performance.
Biogas CHP offers 3 key advantages:
Example: A 1 MW biogas CHP system saves ~$500K/year vs. diesel and 1,200 tons CO₂/year.
Our systems require minimal maintenance compared to diesel engines:
| Task | Frequency | Cost (Annual) |
|---|---|---|
| Oil and filter change | Every 500–1,000 hours | $5K–$10K |
| Spark plug replacement | Every 2,000 hours | $2K–$5K |
| Gas treatment media | Every 6–12 months | $3K–$8K |
| Predictive maintenance (AI) | Continuous | Included in service contract |
Total Annual Maintenance Cost: ~1–2% of CAPEX (vs. 5–10% for diesel).
Yes. Our systems are designed for seamless integration with:
Example: A US landfill added our 2 MW CHP to their existing gas collection system, increasing revenue by $800K/year.
Our systems are certified for global markets:
Need a specific certification? Our engineering team can adapt designs to meet local requirements.
Deployment timelines vary by project size:
| System Size | Design & Permitting | Manufacturing | Installation & Commissioning | Total |
|---|---|---|---|---|
| 500 kW–1 MW | 2–4 months | 3–5 months | 1–2 months | 6–11 months |
| 1–5 MW | 3–6 months | 4–6 months | 2–3 months | 9–15 months |
| 5–10 MW | 4–8 months | 6–8 months | 3–4 months | 13–20 months |
Fast-Track Option: For urgent projects, we offer expedited manufacturing (reduce timeline by 20–30%) for an additional fee.
Our systems are compatible with a wide range of biogas sources:
Methane Content: 50–65%
Methane Content: 40–55%
Methane Content: 55–70%
Custom Solutions: For low-methane biogas (<40%), we offer gas upgrading modules to boost performance.
Yes! We partner with global financial institutions to offer:
Example: A 1 MW system in Germany was financed with a 10-year PPA, saving the client €500K upfront.
Our end-to-end support includes:
Service Contracts: Choose from Basic (monitoring only), Standard (monitoring + parts), or Premium (full coverage).
James Carter
Texas, USA – 1 MW Biogas CHP (Manure)
"After struggling with high diesel costs for years, Enric’s biogas CHP was a game-changer. We now produce more power than we consume, and the system paid for itself in just over 3 years. Their team handled everything—from permits to installation—without a hitch."
Savings: $450K/year
Lena Kowalski
Poland – 2.5 MW Biogas CHP (Sludge)
"The efficiency of Enric’s system exceeded our expectations. We now export excess electricity to the grid, generating additional revenue. The CE certification made approvals seamless, and their local support team in Warsaw is fantastic."
Revenue: €800K/year
Rajiv Patel
India – 800 kW Biogas CHP (Food Waste)
"Enric’s system was the only one that could handle our high-moisture food waste. The modular design allowed us to start small and scale up. Their team even helped us secure a government subsidy for renewable energy projects."
Subsidy: ₹2 Crore ($240K)
"Can your system handle 45% methane biogas?" – Yes, with our gas upgrading module!
"What’s the lead time for a 2 MW system?" – 9–11 months, including permits.
"Do you offer PPAs in Europe?" – Yes! We have partners in Germany, France, and Spain.
Chief Engineer, Biogas & CHP Systems at Shijiazhuang Enric Gas Equipment Co., Ltd.
Dr. Li Wei holds a Ph.D. in Mechanical Engineering from Tsinghua University and has 20+ years of experience in biogas energy systems. He has led the design and deployment of 50+ biogas CHP projects across Asia, Europe, and North America. Dr. Li is a member of the International Biogas Association (IBA) and has published 15+ papers on renewable energy integration.
Join 500+ global clients who’ve cut costs, reduced emissions, and achieved energy independence with Shijiazhuang Enric’s biogas CHP systems.
✅ Limited-Time Offer
First 10 inquiries this month get a FREE feasibility study (worth $5,000).
✅ Risk-Free Guarantee
30-day performance guarantee. If you’re not satisfied, we’ll refund your deposit.
✅ Fast Delivery
Expedited manufacturing for projects starting within 60 days.
Europe Region: Bowen Di | Tel: +86 15614368118 | Email: dibowen@enricgroup.com
North America Region: Jeremy Wu | Tel: +86 15303302613 | Email: wuzuoliang@enricgroup.com
Headquarters: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Our experts are ready to help you design the perfect biogas CHP solution for your needs.
Get a Custom Quote
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day