Shijiazhuang Enric Gas Equipment Co., Ltd. delivers cutting-edge biogas upgrading systems that convert raw biogas into 97%+ pure biomethane—ready for grid injection, vehicle fuel, or industrial use. As a subsidiary of CIMC with 50+ years of expertise, we combine German engineering standards with China's unmatched manufacturing efficiency to offer cost-effective, turnkey biogasaufbereitung plants with 20% lower CAPEX than European competitors.
Why Choose Enric for Biogasaufbereitung?
✅ ASME & DOT Certified (since 2003/2005) | ✅ 40+ Countries Served | ✅ 99.9% Uptime Guarantee
✅ Modular Design for 100–5,000 Nm³/h capacities | ✅ CE, ISO 9001, ATEX Compliant
Biogas production is booming—global capacity reached 110 TWh in 2025 (IEA, Gas Market Report 2025), but 60% of plants struggle with upgrading efficiency. Here’s what’s costing you time and money:
European biogasaufbereitung systems often exceed $2M/MW, with payback periods stretching 7–10 years. Traditional amine scrubbing or PSA systems require:
Strict EU/US regulations (e.g., EU’s 2024 Methane Regulation) limit methane emissions to <0.5% of throughput. Yet:
Biogas composition fluctuates wildly:
Most systems can’t adapt without costly re-engineering.
| Feature | Enric Biogasaufbereitung | European Amine Scrubbing | PSA Systems | Membrane Separation |
|---|---|---|---|---|
| Methane Purity | 97–99.5% | 97–99% | 95–98% | 90–96% |
| Methane Recovery Rate | 99.5% | 98–99% | 95–98% | 90–95% |
| Energy Consumption | 0.15–0.2 kWh/Nm³ | 0.25–0.35 kWh/Nm³ | 0.2–0.3 kWh/Nm³ | 0.2–0.25 kWh/Nm³ |
| CAPEX (1 MW Plant) | $1.2–1.6M | $2.0–3.0M | $1.8–2.5M | $1.5–2.2M |
| H₂S Removal | ✅ Down to <1 ppm (integrated) | ✅ (Additional unit required) | ❌ | ❌ |
| Scalability | 100–5,000 Nm³/h (modular) | 500–2,000 Nm³/h | 100–1,000 Nm³/h | 500–3,000 Nm³/h |
| Maintenance Cost | $0.01–0.02/Nm³ | $0.03–0.05/Nm³ | $0.02–0.04/Nm³ | $0.02–0.03/Nm³ |
| Lifetime | 25+ years | 20–25 years | 15–20 years | 20 years |
*Data sourced from IEA Biogas Reports (2024–2025) and internal Enric R&D.
Stage 1: Pre-Treatment (Removal of Impurities)
Stage 2: CO₂ & N₂ Separation (Core Upgrading)
Stage 3: Post-Treatment & Grid Injection
| Model | EN-BG-100 | EN-BG-500 | EN-BG-1000 | EN-BG-5000 |
|---|---|---|---|---|
| Input Capacity | 100 Nm³/h | 500 Nm³/h | 1,000 Nm³/h | 5,000 Nm³/h |
| Output Biomethane | 97 Nm³/h | 490 Nm³/h | 980 Nm³/h | 4,900 Nm³/h |
| Methane Purity | 97% | 98% | 98.5% | 99% |
| Power Consumption | 15 kW | 75 kW | 150 kW | 750 kW |
| Footprint | 20 m² | 60 m² | 100 m² | 400 m² |
| Delivery Time | 8–10 weeks | 10–12 weeks | 12–14 weeks | 16–20 weeks |
| Warranty | ✅ 5 years on core components | |||
Client:
BioEnergie Park (Bavaria)
Project: 2× EN-BG-1000 units processing 2,000 Nm³/h landfill gas
Results:
Client:
Shell Clean Energy
Project: EN-BG-5000 for dairy farm waste-to-energy
Results:
Client:
IKEA Food Waste Program
Project: EN-BG-500 for 100% manure-to-biomethane
Results:
Client:
PUB (National Water Agency)
Project: EN-BG-100 for sewage sludge digestion
Results:
“Enric’s biogasaufbereitung system reduced our OPEX by 40% compared to our previous amine scrubber. The modular design allowed us to scale from 500 to 2,000 Nm³/h without downtime.”
Dr. Klaus Weber
Technical Director, BioEnergie Park (Germany)
“With Enric’s solution, we achieved 99% methane purity for our CNG station—exceeding California’s strict standards. Their after-sales support is unmatched.”
Mark Johnson
Operations Manager, Shell Clean Energy (USA)
“The EN-BG-500 unit processes our agricultural waste into biomethane with zero odor complaints. The ROI was achieved in just 4.5 years.”
Lena van Dijk
Sustainability Lead, Dutch Dairy Cooperative
Biogas is the raw gas produced from anaerobic digestion (50–75% CH₄, 25–50% CO₂, and impurities like H₂S). Biomethane is upgraded biogas with ≥97% CH₄, meeting natural gas grid standards (e.g., DVGW G 260 in Germany or ASTM D7895 in the US).
Our pre-treatment stage includes:
This protects the membranes and compressors, extending their lifespan to 10+ years.

ROI varies by region and feedstock, but here’s a breakdown:
| Revenue Stream | Europe (€/year) | USA ($/year) |
|---|---|---|
| Grid Injection (Feed-in Tariff) | €800,000–2M | $500,000–1.5M |
| CNG Sales | €1M–3M | $800,000–2.5M |
| Carbon Credits (LCFS/RINs) | €300,000–1M | $400,000–1.2M |
| Total Revenue (EN-BG-1000) | €2.1M–6M | $1.7M–5M |
| Payback Period | 3–6 years | 4–7 years |
Note: Assumes 8,000 operating hours/year and €0.10–0.15/kWh electricity cost.
Yes. Our hybrid membrane + amine system is optimized for:
The amine scrubber fine-tunes the CO₂ removal, ensuring consistent biomethane quality regardless of feedstock fluctuations.
Minimal. Our systems are designed for unattended operation with:
Annual Maintenance Cost: $0.01–0.02/Nm³ (vs. $0.03–0.05 for competitors)
Yes. We offer:
Example: A €2M EN-BG-1000 plant can be financed with 20% down and €40,000/month payments over 5 years.
We pre-certify all systems for:
Our in-house compliance team handles permitting, documentation, and third-party inspections.
| Model | Manufacturing | Shipping | Installation | Total |
|---|---|---|---|---|
| EN-BG-100 | 6 weeks | 2 weeks | 2 weeks | 10 weeks |
| EN-BG-500 | 8 weeks | 3 weeks | 3 weeks | 14 weeks |
| EN-BG-1000+ | 12 weeks | 4 weeks | 4–6 weeks | 20–22 weeks |
Expedited delivery available for urgent projects (surcharge applies).
Limited-Time Offer: Book a FREE feasibility study (worth $5,000) for your project before June 30, 2026.
✅ 24-hour response | ✅ No obligation quote | ✅ Custom ROI analysis
Client: "Need a quote for 2,000 Nm³/h"
Enric: "Sent specs + ROI in 2h"
Client: "Order confirmed!"
Regional Contacts:
Europe: Bowen Di | +86 15614368118 | dibowen@enricgroup.com
North America: Jeremy Wu | +86 15303302613 | wuzuoliang@enricgroup.com
★★★★★
“We installed Enric’s EN-BG-500 in 2023. The system has been flawless—zero downtime in 18 months. The remote monitoring saved us £50,000/year in maintenance costs. Highly recommend for anyone serious about biogas.”
★★★★★
“Enric’s team handled all the permitting for our grid injection project in Spain. We went from raw biogas to biomethane in 3 months—half the time of local suppliers. The DVGW certification was seamless.”
★★★★☆
“The EN-BG-200 was perfect for our small-scale farm. The only issue was customs clearance (took 2 extra weeks), but Enric’s team resolved it quickly. Now we’re selling CNG at a profit within 6 months!”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day