Struggling with impurities in your biogas? Shijiazhuang Enric Gas Equipment Co., Ltd. delivers industrial-grade biogas purification systems with 99.9% methane purity, 20%+ efficiency gains, and compliance with CE, ASME, and ISO 9001 standards. Trusted by 40+ countries, our OEM/ODM systems integrate seamlessly with landfill gas, anaerobic digestion, and wastewater applications.
Cut operational costs by 30% while meeting EPA and EU emissions regulations.
Get a Free Quote in 24h →Your biogas plant isn’t performing as expected, and the culprit is likely contaminants. Raw biogas contains 30-50% CO₂, 1-5% H₂S, and trace siloxanes, which:
Without purification, your biogas is a liability—not a revenue stream.
Solution? A system that removes 99.9% of impurities while maximizing methane recovery. See How →
Shijiazhuang Enric’s biogas purification systems leverage pressure swing adsorption (PSA) and membrane separation to deliver pipeline-grade biomethane. Here’s how we solve your pain points:
| Industry | Input Gas | Output Purity | Key Benefit |
|---|---|---|---|
| Landfill Gas | 50% CH₄, 50% CO₂ | 99.5% CH₄ | Eligible for RIN credits (US) and CFD tariffs (UK) |
| Wastewater Treatment | 60% CH₄, 40% CO₂ | 99.7% CH₄ | Reduces digester foaming by 80% |
| Agricultural Biogas | 65% CH₄, 35% CO₂ | 99.9% CH₄ | Meets California LCFS standards for vehicle fuel |
Pro Tip: For H₂S > 5,000 ppm, our biological desulfurization pre-treatment achieves <1 ppm in a single pass.
| Feature | Enric System | Competitor A (Europe) | Competitor B (US) |
|---|---|---|---|
| Methane Recovery Rate | 98% | 92% | 90% |
| H₂S Removal | <1 ppm | 5 ppm | 10 ppm |
| Lead Time | 8-12 weeks | 20-24 weeks | 16-18 weeks |
| Warranty | 5 years | 2 years | 3 years |
| Price (1,000 Nm³/h) | $450,000 | $600,000 | $550,000 |
Data sourced from public tender documents (2025) and Fortune Business Insights.
| PSA Biogas Purification System | |
|---|---|
| Capacity Range | 100–5,000 Nm³/h |
| Methane Purity | 97–99.9% (adjustable) |
| CO₂ Removal Efficiency | 99.5% |
| H₂S Removal | <1 ppm (or <10 ppb with activated carbon) |
| Power Consumption | 0.2–0.3 kWh/Nm³ |
| Operating Pressure | 4–8 bar(g) |
| Certifications | CE, ASME, ISO 9001, ATEX, PED |
| Dimensions (1,000 Nm³/h) | 12m (L) × 3m (W) × 4m (H) |
Challenge: 10,000 tons/year of food waste producing 2,500 Nm³/h of raw biogas with 8,000 ppm H₂S.
Solution: 2 × 1,500 Nm³/h PSA units + biological desulfurization.
Result:
Challenge: 1,200 Nm³/h biogas with 38% CO₂ causing CHP engine failures.
Solution: Membrane + PSA hybrid system.
Result:
Challenge: 500 Nm³/h from dairy waste with high siloxane content.
Solution: Compact PSA + activated carbon.
Result:
Data verified by IRENA and customer audits.
“Enric’s system reduced our H₂S levels from 5,000 ppm to <1 ppm in one pass. The 5-year warranty gave us confidence—no other supplier offered that.”
— Mark Johnson, Operations Manager, Clean Energy Systems (USA)
“We tested 3 PSA systems. Enric’s had the highest methane recovery (98%) and lowest power consumption. Payback period: 2.1 years.”
— Dr. Anna Schmidt, Technical Director, GreenGas Germany
PSA (Pressure Swing Adsorption) uses adsorbents like activated carbon to selectively remove CO₂ and H₂S. Best for high-purity (99%+) methane but has higher CAPEX.

Membranes separate gases based on molecular size. Lower cost but typically achieves 97-98% purity. We often combine both for optimal results.
Yes. Our pre-treatment unit removes 99% of siloxanes using activated carbon + cooling. Siloxanes are converted to silica gel, which is automatically purged.
8-12 weeks for standard models. Custom configurations (e.g., H₂S > 10,000 ppm) may take 14-16 weeks. We offer rental units for urgent needs.
Yes. Our on-site commissioning includes:
Optional: $10,000 for extended warranty + annual maintenance.
Typical payback period:
“Game-changer for our dairy farm.” We installed Enric’s 500 Nm³/h system last year. The biomethane now powers our milk truck fleet, cutting diesel costs by 60%. Zero complaints from the engine manufacturer.
— Dairy Farmer, Wisconsin (USA)
“Exceeds Indian PNGRB standards.” Our CBG plant passed certification on the first try. The system’s 99.7% purity met all IS 16087 requirements. Support team resolved a minor issue in under 6 hours.
— CBG Plant Manager, Gujarat (India)
“Reliable but expensive.” The system works flawlessly, but the initial cost was 20% higher than local suppliers. However, the low maintenance (only €5,000/year) justifies the investment.
— Biogas Consultant, Bavaria (Germany)
Limited-Time Offer: Order before June 30, 2026 and get:
100% Satisfaction Guarantee: If methane purity drops below 99% in the first year, we’ll refund 20% of your investment.
Contact Us Today:
Europe Region: Bowen Di | +86 15614368118 | dibowen@enricgroup.com
North America Region: Jeremy Wu | +86 15303302613 | wuzuoliang@enricgroup.com
Factory Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day