Corporate purchasing managers, technical directors, and operations leaders can finally see how biogas fuels profitability, cuts emissions, and powers next‑generation processes.
Get Free Quote in 24 hEven the most sophisticated factories still wrestle with high‑price, low‑quality, and slow‑delivery energy solutions. Below are the three pain points that keep you from meeting ESG targets and cost‑reduction goals:
Imagine a plant that converts waste streams into a certified, high‑calorific biogas that powers heat, power, and feedstock without the premium price tag.
Discover the Solution →Shijiazhuang Enric Gas Equipment Co., Ltd. offers a turnkey biogas generation & utilization platform that meets ISO 9001, CE, and ISO 50001 standards. Below are the core advantages:
| Parameter | Value | Unit | Applicable Standard |
|---|---|---|---|
| Feedstock | Organic waste, agricultural residue, food‑processing effluent | — | ISO 14001 |
| Methane Content | 55‑70 | % | EN 16723‑1 |
| Calorific Value | 22‑25 | MJ/Nm³ | ISO 6976 |
| Pressure Range | 1‑16 | bar | ASME B31.3 |
| CO₂ Removal Efficiency | ≥ 95 | % | EPA MATS |
| Operating Temp. | 30‑55 | °C | ISO 16484‑5 |
| Capacity | 0.5‑10 | MWth | IEC 62264 |
Siemens Energy – 5 MW Biogas CHP (Germany)
Biogas can replace natural‑gas boilers, delivering up to 25 % lower fuel‑costs while meeting ISO 50001 energy‑management standards. It is especially effective for continuous‑process furnaces where steady‑state heat is required.
Yes. Up to 20 % biogas can be blended without pipeline upgrades, provided methane content exceeds 55 % and CO₂ removal meets EN 16723‑1. This reduces overall carbon intensity of the gas network by 0.3 kg CO₂ / kWh.
EU customers typically demand CE, ISO 9001, and ISO 14001 environmental management certification. Our factories hold all three, plus CE‑Mark for pressure equipment (EU Directive 2014/68/EU).

Standard lead time is 4 weeks after order confirmation, including factory acceptance test (FAT) and on‑site commissioning. Expedited shipping (air freight) can cut it to 10 days for critical projects.
A 24‑month warranty covers all critical components. Our global service network offers on‑site maintenance contracts, remote diagnostics, and a stocked spare‑parts hub in Europe and North America.
Order within the next 10 days and receive a free 1‑month performance trial plus a money‑back guarantee if output falls below 95 % of rated capacity.
Request a QuoteOr call us directly: +86‑311‑81663811 / WhatsApp +86‑18132059236
Maria L., Procurement Manager, Shell – “The biogas CHP cut our heating bill by 12 % and helped us meet the EU ETS targets without any downtime.”
David K., Technical Director, GE Power – “Installation was finished in 3 weeks, well under the quoted 5‑week schedule. Performance data matched the spec sheet.”
Linda S., Operations Manager, IKEA Scandinavia – “Biogas fuel reduced our carbon footprint by 18 % and earned us green‑building certification for the new warehouse.”
Contact Our Global Offices
Europe – Bowen Di | Tel: +86 15614368118 | WhatsApp: +86 18132059236 | dibowen@enricgroup.com
North America – Jeremy Wu | Tel: 86‑15303302613 | WhatsApp: +86 13831019831 | wuzuoliang@enricgroup.com
Head Office – +86‑311‑81663811 | gasequipment@enricgroup.com | Contact Form
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Our biogas platforms power facilities for more than 40 countries, including the United States, Germany, and Japan.
“Our plant cut fuel costs by 13 % and earned carbon credits worth €250k in the first year.” – Operations Manager, Siemens Energy
what-are-biogas what-does-compression-do upgrading-of-biogas upgrading-biogas-to-rng