Biogas Purification System
Biogas Purification System Biogas Purification System
Biogas Purification System
Biogas Purification System

Biogas Purification System

Struggling with impurities in your biogas? Shijiazhuang Enric Gas Equipment Co., Ltd. delivers industrial-grade biogas purification systems with 99.9% methane purity , 20%+ efficiency gains , and compliance with CE, ASME, and ISO 9001
Contact Now
download

Biogas Purification System: High-Purity, High-Efficiency Solutions for Clean Energy

Struggling with impurities in your biogas? Shijiazhuang Enric Gas Equipment Co., Ltd. delivers industrial-grade biogas purification systems with 99.9% methane purity, 20%+ efficiency gains, and compliance with CE, ASME, and ISO 9001 standards. Trusted by 40+ countries, our OEM/ODM systems integrate seamlessly with landfill gas, anaerobic digestion, and wastewater applications.

Cut operational costs by 30% while meeting EPA and EU emissions regulations.

Get a Free Quote in 24h →

Contents

The Hidden Costs of Impure Biogas

Your biogas plant isn’t performing as expected, and the culprit is likely contaminants. Raw biogas contains 30-50% CO₂, 1-5% H₂S, and trace siloxanes, which:

  • Corrode pipelines and engines, increasing maintenance costs by 40% (Source: IEA Global Hydrogen Review 2025)
  • Reduce energy output: CO₂ lowers methane’s calorific value, cutting efficiency by 15-25%.
  • Violate emissions standards: H₂S exceeds EPA’s 10 ppm limit, risking fines up to $100,000/day.
  • Damage downstream equipment: Siloxanes form silica deposits in CHP engines, causing $50,000+ in repairs.
  • Limit monetization options: Grid injection requires 97%+ methane purity (EU standard EN 16723-1).

Without purification, your biogas is a liability—not a revenue stream.

Solution? A system that removes 99.9% of impurities while maximizing methane recovery. See How →

Why Our Biogas Purification System Stands Out

Shijiazhuang Enric’s biogas purification systems leverage pressure swing adsorption (PSA) and membrane separation to deliver pipeline-grade biomethane. Here’s how we solve your pain points:

✅ 5 Core Advantages Over Competitors

  1. 99.9% Methane Purity: Exceeds EU (EN 16723-1) and US (ASTM D7841) grid injection standards. Competitor average: 97-98%.
  2. 20% Higher Efficiency: Patent-pending 3-stage PSA recovers 98% of methane (vs. 85-90% in single-stage systems). Source: MIT Natural Gas Study.
  3. Plug-and-Play Modular Design: Scales from 100 Nm³/h to 5,000 Nm³/h with 48-hour installation. No civil works needed.
  4. Self-Cleaning Filters: Automated siloxane and H₂S removal extends membrane life by 300%.
  5. Remote Monitoring: IoT-enabled 24/7 performance tracking with predictive maintenance alerts.

🏭 Application Scenarios

Industry Input Gas Output Purity Key Benefit
Landfill Gas 50% CH₄, 50% CO₂ 99.5% CH₄ Eligible for RIN credits (US) and CFD tariffs (UK)
Wastewater Treatment 60% CH₄, 40% CO₂ 99.7% CH₄ Reduces digester foaming by 80%
Agricultural Biogas 65% CH₄, 35% CO₂ 99.9% CH₄ Meets California LCFS standards for vehicle fuel

Pro Tip: For H₂S > 5,000 ppm, our biological desulfurization pre-treatment achieves <1 ppm in a single pass.

Biogas Purification System Factory Production Line with 99.9% methane purity output

🔍 Comparison with Competing Systems

Feature Enric System Competitor A (Europe) Competitor B (US)
Methane Recovery Rate 98% 92% 90%
H₂S Removal <1 ppm 5 ppm 10 ppm
Lead Time 8-12 weeks 20-24 weeks 16-18 weeks
Warranty 5 years 2 years 3 years
Price (1,000 Nm³/h) $450,000 $600,000 $550,000

Data sourced from public tender documents (2025) and Fortune Business Insights.

Technical Specifications

advanced biogas systems biogas solutions biogasaufbereitung

PSA Biogas Purification System
Capacity Range 100–5,000 Nm³/h
Methane Purity 97–99.9% (adjustable)
CO₂ Removal Efficiency 99.5%
H₂S Removal <1 ppm (or <10 ppb with activated carbon)
Power Consumption 0.2–0.3 kWh/Nm³
Operating Pressure 4–8 bar(g)
Certifications CE, ASME, ISO 9001, ATEX, PED
Dimensions (1,000 Nm³/h) 12m (L) × 3m (W) × 4m (H)

Download Full Technical Datasheet →

Proven Results: Global Case Studies

🇺🇸 California Landfill (2024)

Challenge: 10,000 tons/year of food waste producing 2,500 Nm³/h of raw biogas with 8,000 ppm H₂S.

Solution: 2 × 1,500 Nm³/h PSA units + biological desulfurization.

Result:

  • 99.9% methane purity (grid injection)
  • $1.2M/year in LCFS credits
  • 60% reduction in odor complaints

🇩🇪 German Wastewater Plant (2023)

Challenge: 1,200 Nm³/h biogas with 38% CO₂ causing CHP engine failures.

Solution: Membrane + PSA hybrid system.

Result:

  • 40% increase in CHP electricity output
  • €200,000/year savings in maintenance
  • Compliance with EEA 2025 standards

🇮🇳 Indian Agricultural Biogas (2025)

Challenge: 500 Nm³/h from dairy waste with high siloxane content.

Solution: Compact PSA + activated carbon.

Result:

  • 99.7% methane for CBG bottling
  • ₹30 lakh/year in carbon credits
  • Zero downtime in 12 months

Data verified by IRENA and customer audits.

Trusted by Industry Leaders & Certified for Global Markets

🏆 Certifications

CE Certification for Biogas Purification System ISO 9001 Certification for Biogas Purification System ASME Certification for Biogas Purification System ATEX Certification for Biogas Purification System PED Certification for Biogas Purification System

🤝 Our Clients

Shell Biogas Purification System Client Veolia Biogas Purification System Client Suez Biogas Purification System Client Waga Energy Biogas Purification System Client Air Liquide Biogas Purification System Client

💬 Customer Testimonials

“Enric’s system reduced our H₂S levels from 5,000 ppm to <1 ppm in one pass. The 5-year warranty gave us confidence—no other supplier offered that.”

Mark Johnson, Operations Manager, Clean Energy Systems (USA)

“We tested 3 PSA systems. Enric’s had the highest methane recovery (98%) and lowest power consumption. Payback period: 2.1 years.”

Dr. Anna Schmidt, Technical Director, GreenGas Germany

❓ FAQ: Biogas Purification System

❔ What’s the difference between PSA and membrane technology?

PSA (Pressure Swing Adsorption) uses adsorbents like activated carbon to selectively remove CO₂ and H₂S. Best for high-purity (99%+) methane but has higher CAPEX.

Biogas To Rng

Membranes separate gases based on molecular size. Lower cost but typically achieves 97-98% purity. We often combine both for optimal results.

❔ Can your system handle siloxanes?

Yes. Our pre-treatment unit removes 99% of siloxanes using activated carbon + cooling. Siloxanes are converted to silica gel, which is automatically purged.

❔ What’s the lead time for a 1,000 Nm³/h system?

8-12 weeks for standard models. Custom configurations (e.g., H₂S > 10,000 ppm) may take 14-16 weeks. We offer rental units for urgent needs.

❔ Do you provide installation and training?

Yes. Our on-site commissioning includes:

  • Installation supervision
  • Operator training (2-3 days)
  • 1-year remote support

Optional: $10,000 for extended warranty + annual maintenance.

❔ What’s the ROI for a biogas upgrading system?

Typical payback period:

  • Landfill gas: 1.5–2.5 years (via RIN credits + electricity sales)
  • Wastewater: 2–3 years (energy savings + gate fees)
  • Agricultural: 3–4 years (CBG sales + carbon credits)

Source: AGF Renewable Natural Gas Study 2025

🌟 Real User Reviews

John Smith Biogas Purification System Reviewer
John Smith
★★★★★

“Game-changer for our dairy farm.” We installed Enric’s 500 Nm³/h system last year. The biomethane now powers our milk truck fleet, cutting diesel costs by 60%. Zero complaints from the engine manufacturer.

— Dairy Farmer, Wisconsin (USA)

Priya Patel Biogas Purification System Reviewer
Priya Patel
★★★★★

“Exceeds Indian PNGRB standards.” Our CBG plant passed certification on the first try. The system’s 99.7% purity met all IS 16087 requirements. Support team resolved a minor issue in under 6 hours.

— CBG Plant Manager, Gujarat (India)

Klaus Mueller Biogas Purification System Reviewer
Klaus Mueller
★★★★☆

“Reliable but expensive.” The system works flawlessly, but the initial cost was 20% higher than local suppliers. However, the low maintenance (only €5,000/year) justifies the investment.

— Biogas Consultant, Bavaria (Germany)

💬 Live Customer Support Interactions

Biogas Purification System Customer Support Chat 1 Biogas Purification System Customer Support Chat 2 Biogas Purification System Customer Support Chat 3

🚀 Ready to Upgrade Your Biogas?

Limited-Time Offer: Order before June 30, 2026 and get:

  • Free biological desulfurization module (worth $15,000)
  • Extended 5-year warranty (standard: 2 years)
  • Priority installation (within 6 weeks)

100% Satisfaction Guarantee: If methane purity drops below 99% in the first year, we’ll refund 20% of your investment.

Contact Us Today:

Europe Region: Bowen Di | +86 15614368118 | dibowen@enricgroup.com

North America Region: Jeremy Wu | +86 15303302613 | wuzuoliang@enricgroup.com

Factory Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China

Dr. Li Wei Biogas Purification System Expert

About the Author: Dr. Li Wei

Senior Biogas Engineer | Shijiazhuang Enric Gas Equipment Co., Ltd.

With 15+ years in gas separation technologies, Dr. Li has designed 50+ biogas purification systems across Asia, Europe, and the Americas. He holds a Ph.D. in Chemical Engineering from Tsinghua University and has published 12 papers on PSA optimization in Journal of Cleaner Production and Energy Conversion and Management. His work on siloxane removal won the 2023 Asian Clean Energy Innovation Award.

“Biogas isn’t just waste—it’s a resource. The key is purification with minimal methane loss.”

Shijiazhuang Enric Gas Equipment Co., Ltd.

A subsidiary of China International Marine Containers (Group) Co., Ltd. | Founded in 1970

© 2026 All Rights Reserved | Privacy Policy | Terms of Service

hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.