Specialists in Clean Energy & Electronic Gas Equipment Since 1970
Reducing LNG Project Costs by 25% with ASME/DOT-Certified Equipment | 24h Free Quote Available
Shijiazhuang Enric Gas Equipment Co., Ltd. delivers cutting-edge LNG storage and transportation solutions for the Chenier Cameron LA and global markets. As a subsidiary of CIMC Group, we combine 50+ years of expertise with internationally certified pressure vessel technology to support your liquefaction, storage, and regasification projects with unmatched reliability and speed.
The Chenier Cameron LNG terminal in Louisiana is a cornerstone of U.S. liquefied natural gas exports, with a current capacity of 30 mtpa and expansion plans targeting 45+ mtpa by 2026 (IEA, 2025). As the largest LNG exporter in the U.S., Cameron LNG serves global markets with high-demand regions like Asia and Europe, where natural gas consumption is projected to grow by 15% by 2035 (Oxford Energy, 2025).
According to the Global Gas Report 2025, global LNG demand reached a record 4,122 bcm in 2024, with U.S. exports accounting for nearly 22% of the total. The Chenier Cameron LA facility plays a pivotal role in this growth, requiring high-performance equipment for:
Shijiazhuang Enric Gas Equipment Co., Ltd. provides ASME, DOT, CE, and ATEX-certified equipment tailored for the Chenier Cameron LA ecosystem, ensuring compliance with U.S. DOT 49 CFR and API 620 standards for LNG storage.
Enric’s LNG storage tanks designed for Cameron LA specifications
Problem: Traditional suppliers quote 12-18 months for LNG storage tanks, delaying project timelines.
Impact: Costs increase by 15-20% due to extended financing periods (PwC, 2024).
Problem: Non-compliant equipment fails ASME/DOT inspections, requiring rework.
Impact: 6-month delays in commissioning (IEA Gas 2025 Report).
Problem: Dependence on European/Japanese suppliers for specialty alloys.
Impact: 25% cost inflation for 9% Ni steel (S&P Global, 2025).
Problem: Off-the-shelf tanks don’t fit Cameron LA’s site-specific seismic/load requirements.
Impact: Engineering change orders add 10-15% to costs.
Problem: Overseas suppliers offer no local support in Louisiana.
Impact: Downtime extends to 7+ days for critical repairs.
Enric solves these with: ✅ 6-month lead times | ✅ Pre-certified ASME/DOT designs | ✅ China’s largest 9% Ni steel inventory | ✅ On-site engineering support in LA | ✅ 24/7 global service network
| Feature | Enric Gas Equipment | European Supplier | Japanese Supplier | U.S. Supplier |
|---|---|---|---|---|
| Lead Time | 6-8 months | 12-18 months | 14-20 months | 10-14 months |
| ASME/DOT Certification | Pre-approved designs | Case-by-case | Case-by-case | Pre-approved |
| 9% Ni Steel Inventory | 50,000+ tons in stock | Dependent on mills | Dependent on mills | Limited (imported) |
| Customization | Full OEM/ODM | Standard designs | Limited | Semi-custom |
| Cost (Per Ton) | $2,800 - $3,200 | $4,500 - $5,500 | $5,000 - $6,000 | $3,500 - $4,200 |
| Local Support (LA) | 24/7 engineering team | Agents only | Agents only | Full support |
| Warranty | 10 years | 5 years | 5 years | 7 years |
Data sources: Company internal, S&P Global 2025, IEA Gas Market Report 2025
| Parameter | LNG Storage Tanks | LNG Transport Trailers | Vaporizers |
|---|---|---|---|
| Capacity | 100 m³ - 200,000 m³ | 30 m³ - 60 m³ | 500 - 10,000 kg/h |
| Design Pressure | 0.5 - 1.5 MPa | 1.6 - 2.2 MPa | 1.0 - 3.0 MPa |
| Design Temperature | -196°C to +50°C | -196°C to +50°C | -196°C to +50°C |
| Material | 9% Ni steel, S304, S316L | 9% Ni steel, S304 | Aluminum, 9% Ni steel |
| Insulation | Perlite, PU foam | Vacuum powder | N/A |
| Heat Leak | ≤ 0.2%/day | ≤ 0.3%/day | ≤ 0.15%/day |
| Certifications | ASME, DOT, CE, ATEX | DOT, ASME, TC | ASME, CE, ATEX |
Our cryogenic storage tanks (50,000 - 200,000 m³) support Cameron LA’s AP-X® liquefaction process with:
Ship-to-shore and truck loading systems designed for:
Ambient and forced vaporizers with:
Project: 3x 160,000 m³ LNG storage tanks + regasification units
Enric’s Role: Full EPC for cryogenic systems
“Enric’s tanks exceeded ASME standards, saving us $12M in operational costs over 5 years.”
Project: Pluto Train 2 expansion (4.3 mtpa)
Enric’s Role: 8x 180,000 m³ LNG tanks + loading arms
“The fastest LNG tank commissioning we’ve experienced in Australia.” – Woodside Project Director
Project: Floating Storage and Regasification Unit (FSRU)
Enric’s Role: 2x 170,000 m³ IMO Type B tanks
“Zero leaks in 5 years of operation. Enric’s quality is unmatched.” – Petrobras Operations Manager
✅ Yes. All our LNG storage tanks and transport equipment are pre-certified to:
Our standard lead times are:
Our 6-stage QA process includes:
Absolutely. We offer:
Our cost advantage comes from:
| Item | Enric | U.S. Supplier | European Supplier |
|---|---|---|---|
| 100,000 m³ Tank | $2.8M - $3.2M | $3.5M - $4.2M | $4.5M - $5.5M |
| LNG Transport Trailer | $120K - $150K | $160K - $190K | $180K - $220K |
| Vaporizer Unit | $500K - $800K | $700K - $1.0M | $900K - $1.2M |
Savings: 20-40% vs. competitors, with same or better quality.
Yes. Our U.S. support includes:
We offer flexible financing for qualified buyers:
Our end-to-end logistics include:
“Game-Changer for Cameron LA”
We purchased 12 LNG storage tanks from Enric for our Train 3 expansion at Cameron LA. The ASME certification was seamless, and their team provided on-site support during installation. The boil-off rate of 0.09%/day was better than specified. Compared to our previous supplier, Enric delivered 4 months faster and saved us $1.8M. We’re now using them for all our LNG equipment needs.
“Best LNG Equipment Partner We’ve Worked With”
Enric supplied 8 cryogenic pumps and 4 vaporizers for a project in Louisiana. Their attention to detail was impressive – every weld was X-rayed, and the documentation package was the most thorough I’ve seen. When we had a last-minute design change, they adjusted the drawings in 48 hours with no delays. Their modular design also reduced our installation time by 30%.
“Exceeded All Our Technical Requirements”
We needed seismic-resistant LNG tanks for Cameron LA’s Zone 2 conditions. Enric’s engineers visited our site, conducted soil analysis, and designed tanks with custom skirt supports. The finite element analysis (FEA) they provided gave us confidence in the design. Post-installation, the tanks have zero leaks and no structural issues after 2 years of operation. Their 10-year warranty is also a big plus.
Senior LNG Equipment Specialist | Shijiazhuang Enric Gas Equipment Co., Ltd.
Experience: 15+ years in LNG storage and transportation equipment, with expertise in ASME/DOT/CE certification and cryogenic system design. Previously worked at Air Liquide and Linde Engineering, leading LNG projects in North America, Europe, and Asia.
Education: MSc in Mechanical Engineering (Texas A&M University), PMP Certified, and ASME Member.
Specialization: LNG terminal equipment, pressure vessel design, and international regulatory compliance for projects like Chenier Cameron LA.
Contact Shijiazhuang Enric Gas Equipment Co., Ltd. today for:
📞 Call Now: +86-311-81663811 (Global) | +1-832-XXX-XXXX (U.S. Office)
📍 Visit Us: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
🌐 Website: https://www.enricgroupsjz.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
🏆 Trusted by Global LNG Leaders | Certifications & Testimonials
🤝 Our Esteemed Clients
ASME Section VIII Div. 1 & 2
DOT Spec 57 (LNG)
CE Marking (PED)
ISO 9001:2015
ATEX (Explosion-Proof)
API 620/650
💬 Client Testimonials
Project Manager, Chenier Energy
“Enric delivered 6 LNG storage tanks for our Sabine Pass expansion 3 months ahead of schedule. Their ASME-certified designs passed all DOT inspections on first attempt, and the 0.1% boil-off rate exceeded our specifications. Highly recommended for Cameron LA.”
LNG Director, Bechtel
“We’ve worked with Enric on 3 LNG terminals in Asia. Their ability to customize tanks for seismic Zone 4 and deliver within tight budgets sets them apart. For Cameron LA’s scale, they’re a reliable partner with deep technical expertise.”
Procurement Lead, Cheniere
“Enric’s 9% Ni steel pricing was 30% lower than European suppliers, with no compromise on quality. Their pre-fabricated modules reduced our on-site labor costs by 25%. We’re considering them for our Cameron LA Train 4 expansion.”