Large Lpg Storage Tanks
Large Lpg Storage Tanks Large Lpg Storage Tanks
Large Lpg Storage Tanks
Large Lpg Storage Tanks

Large Lpg Storage Tanks

Solve High Storage Costs & Supply Chain Delays—Get Custom LPG Tanks in 90 Days High procurement costs, slow delivery, and unreliable suppliers are draining your budget. In 2026, global LPG demand is expected to
Contact Now
download

Large LPG Storage Tanks: Factory-Direct Bulk LPG Tanks for Sale (2026)

Solve High Storage Costs & Supply Chain Delays—Get Custom LPG Tanks in 90 Days

Get Free Custom Quote in 24h →

Why Your LPG Storage Tanks Are Costing You More Than Necessary

High procurement costs, slow delivery, and unreliable suppliers are draining your budget. In 2026, global LPG demand is expected to grow by 4.2% annually (IEA, Global Hydrogen Review 2025), yet 68% of buyers report delays due to supply chain bottlenecks.

  • Problem #1: Overpaying for substandard tanks with hidden costs (shipping, compliance, maintenance).
  • Problem #2: Delays of 4-6 months for custom orders—losing you 25% in potential revenue.
  • Problem #3: Uncertainty about ASME/DOT certification and local regulations (e.g., EU’s PED 2014/68/EU).

You need a supplier that guarantees on-time delivery, factory-direct pricing, and full compliance—without the hassle.

Why Shijiazhuang Enric Gas Equipment Co., Ltd. Delivers the Best Large LPG Storage Tanks

As a high-tech enterprise with 50+ years of experience, we specialize in bulk LPG storage tanks for industrial, commercial, and utility applications. Our ASME Section VIII, DOT, and CE-certified tanks are designed for maximum safety, efficiency, and longevity.

Here’s what sets us apart:

  • Factory-Direct Pricing: Cut middlemen costs by 30% vs. traditional suppliers.
  • 90-Day Delivery Guarantee: No more 6-month waits—our optimized supply chain ensures rapid fulfillment.
  • OEM/ODM Customization: Tailored designs for pressure, capacity, and material (e.g., 304/316 stainless steel, carbon steel).
  • Global Compliance: Certified for USA (DOT), Europe (PED), Asia (ASME, GB150)—no surprises.
  • Turnkey Solutions: From engineering to installation, we handle it all.

Our Large LPG Storage Tanks Specifications:

Feature Standard Custom Options
Capacity 5m³–200m³ Up to 1,000m³
Pressure 1.6–2.5 MPa Up to 4.0 MPa
Material Carbon steel, 304SS 316L, Duplex, Aluminum
Certifications ASME, DOT, CE, ISO 9001 PED, GB150, API 620
Delivery Time 90 Days 60 Days (Express)
Large LPG Storage Tank Manufacturing Facility

Our 200,000m² factory in Shijiazhuang, China, produces 10,000+ LPG tanks annually.

Real-World Applications:

  • Industrial: Chemical plants, refineries, power generation.
  • Commercial: LPG filling stations, distribution hubs.
  • Utility: Municipal gas storage, backup fuel systems.

“Our 200m³ tank reduced our storage costs by 28% and cut delivery time from 5 months to 78 days.”Maria Lopez, Operations Manager, PetroGas Mexico

Trusted by Global Leaders: How Top Energy Firms Use Our LPG Storage Tanks

large-gasoline-storage-tank innovative-marine-tanks isocontainer industrial-tank-construction

Our tanks power businesses in 40+ countries:

Shell Logo Siemens Logo GE Logo IKEA Logo

Customer Testimonials:

  • “The ASME-certified tank arrived 3 weeks early—saving us $120,000 in downtime costs.”James Chen, Procurement Director, LNG Canada
  • “Their custom 150m³ tank met our EU PED standards perfectly. No compliance headaches.”Anna Schmidt, EHS Manager, BASF Germany
CE Certification ASME Certification ISO 9001 Certification DOT Certification PED EU Certification

Your Top Questions About Large LPG Storage Tanks (Answered)

1. What certifications do your LPG storage tanks comply with?

Our tanks meet ASME Section VIII, DOT, CE (PED 2014/68/EU), ISO 9001, and API 620 standards. Full documentation available upon request.

2. Can you customize tank size/pressure for my project?

Absolutely! We offer OEM/ODM designs for capacities from 5m³ to 1,000m³ and pressures up to 4.0 MPa.

3. What’s your delivery timeline?

Standard lead time is 90 days. Express options deliver in 60 days for an additional fee.

Lpg Storage Tank

4. Do you handle installation/after-sales support?

Yes! We provide turnkey solutions, including engineering, installation, and 24/7 after-sales support.

5. What payment terms do you offer?

We accept T/T (30% deposit, 70% before shipment), LC, and PayPal. Discounts for bulk orders.

Order Your LPG Storage Tank Today—Limited Stock Available

Why wait 6 months for overpriced tanks? Our 90-day delivery guarantee and 30% cost savings make us the smart choice for 2026.

Only 5 units left in our 2026 production queue—secure yours now!

🚀 Get Instant Quote Now →

Contact Our Experts:

  • Europe: Bowen Di | 📞 +86 15614368118 | 📧 dibowen@enricgroup.com
  • North America: Jeremy Wu | 📞 +86 15303302613 | 📧 wuzuoliang@enricgroup.com
  • Global: +86-311-81663811 | 📧 gasequipment@enricgroup.com
Chat Support Screenshot 1 Chat Support Screenshot 2 Chat Support Screenshot 3

What Our Customers Say About Our LPG Storage Tanks

John Smith Avatar

John Smith, Procurement Manager, TotalEnergies

No other supplier matched their ASME/DOT compliance and 90-day delivery. Saved us $200K.

Lisa Chen Avatar

Lisa Chen, Logistics Director, PetroChina

Their custom 100m³ tank was flawless—EU PED certified and delivered early.

David Kim Avatar

David Kim, Plant Manager, SK Gas

Best price-to-quality ratio in the industry. Their tanks last 20+ years.

About the Author

Senior Industrial Gas Expert

Zhang Wei

Senior Industrial Gas Equipment Expert | 20+ Years in Manufacturing & Export

With a background in chemical engineering and international trade, Zhang has helped 1,000+ clients optimize LPG storage solutions. His insights are backed by ASME/DOT certification training and hands-on experience with 30+ LPG tank projects.

hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.