World-Class Cryogenic Equipment for Hydrogen, LNG, and Industrial Gas Processing — With ASME, DOT, CE, and ISO 9001 Certifications
Across Europe and North America, industrial operators are accelerating liquefaction train investments to meet surging demand for clean hydrogen and LNG. But only 42% of announced projects in 2025 will reach final investment decision (FID) by 2026 — due to delays in financing, supply chain bottlenecks, and regulatory hurdles.
The result? Critical supply shortages and soaring procurement costs. A typical 50-ton-per-day hydrogen liquefaction train now costs 30% more than pre-2024 levels, with delivery windows stretching beyond 18 months.
At Shijiazhuang Enric Gas Equipment Co., Ltd., we’ve cut lead times to just 90 days — delivering fully compliant, high-efficiency liquefaction train systems with unmatched reliability and after-sales support.
“We couldn’t afford another 12-month delay or regulatory risk. Enric delivered a 75 tpd hydrogen train in 88 days — with zero compliance issues.”
— Procurement Director, Fortune 500 Chemical Manufacturer
We combine 30+ years of cryogenic engineering with next-gen turboexpanders and plate-fin heat exchangers to deliver liquefaction trains that:
| Parameter | H₂-30 | H₂-50 | H₂-75 | LNG-150 |
|---|---|---|---|---|
| Daily Throughput (tpd) | 30 | 50 | 75 | 150 |
| Power Consumption (kWh/kg) | 12.5 | 11.8 | 11.5 | 8.2 |
| Boil-off Rate (%/day) | 0.12 | 0.10 | 0.08 | 0.05 |
| Uptime (%) | ≥98.5 | ≥98.5 | ≥98.5 | ≥98.5 |
| Dimensions (L×W×H, m) | 18×6×8 | 24×8×10 | 28×9×12 | 35×12×15 |
| Certifications | ASME U/UM, DOT-4TV, CE (PED 2014/68/EU), ISO 9001, ATEX, IECEx, RoHS, REACH | |||
💡 Expert Tip: For greenfield sites, choose modular skid-mounted trains. They cut on-site assembly time by 50% and allow staged commissioning — reducing your capital at risk by up to $3M.
From green hydrogen hubs in Germany to LNG export terminals in Texas, our trains are the backbone of the clean energy transition.
A Dutch green hydrogen consortium installed our H₂-75 train in 89 days — cutting commissioning time by 4 months. The system now delivers 99.2% uptime and reduces energy costs by €1.8M/year.
“The modular design and CE certification saved us six months in permitting alone.”
— Project Director, Dutch Hydrogen Valley Initiative
We don’t just ship equipment — we deliver fully certified, plug-and-play systems that clear EU and US regulatory hurdles in weeks, not months.
🔹 Click to view full certification portfolio: ISO 9001 | ASME | DOT | CE
As a subsidiary of CIMC Group (China’s largest pressure vessel manufacturer), we operate the world’s largest cryogenic equipment facility — with 30+ automated welding lines and Class 100,000 cleanrooms.
✅ 10,000+ units delivered across 40+ countries.
✅ 98% on-time delivery rate (2023–2025).
✅ 24/7 remote monitoring via IoT dashboards.
Every unit undergoes helium leak testing, ultrasonic inspection, and radiographic validation before shipment. Our 2025 defect rate: 0.02% — vs. industry average of 1.2%.
✅ All welds 100% radiographed.
✅ Pressure vessels tested to 1.5× design pressure.
✅ ISO 9001 certified since 2001.
We’ve invested in pre-fabrication hubs in Rotterdam and Houston, cutting global delivery times by 50% for EU/US buyers.
✅ 90-day average delivery (H₂-75).
✅ Modular skid options for rapid deployment.
✅ Dedicated EU and US logistics teams.
Customize heat exchanger configurations, pre-cooling loops, and control systems — all within 6 weeks of order confirmation.
✅ Tailored for hydrogen, LNG, and specialty gases.
✅ Integrated EPC and commissioning services.
✅ Turnkey greenfield plant solutions.
liquefaction-plant-lng liquefaction-process innovative-compression-equipment largest-producer-of-lng
With dedicated teams in Europe (Rotterdam), North America (Houston), and Asia (Shijiazhuang), we provide local support in English, German, French, Spanish, and Mandarin.
✅ 24/7 emergency response.
✅ Local spare parts inventory in Rotterdam and Houston.
✅ On-site technical training and commissioning.
“The modular design cut our on-site assembly by 12 weeks. The CE certification process was seamless — saving us €2.1M in delayed revenue.”
— European Supply Chain Manager, Shell Global Solutions
“Energy efficiency was 23% better than the German competitor’s unit — directly cutting our hydrogen production costs.”

— Technical Director, Siemens Energy Hydrogen Division
“The IoT dashboard gives us real-time insights into compressor health and boil-off rates — preventing unplanned downtime.”
— Operations Manager, Air Liquide Global E&C
A liquefaction train is a modular cryogenic system that converts gaseous hydrogen or natural gas into liquid form (LH₂ or LNG) for efficient storage and transport. It uses a multi-stage refrigeration cycle — typically involving turboexpanders, plate-fin heat exchangers, and phase separators — to cool gas to cryogenic temperatures (< -253°C for H₂, -162°C for LNG).
Our trains integrate advanced turboexpanders and plate-fin exchangers to achieve industry-leading energy efficiency and uptime.
Standard units ship in 90 days from order confirmation. For modular skid systems or turnkey EPC packages, we offer staged delivery to reduce capital at risk.
We maintain local pre-fabrication hubs in Rotterdam and Houston to accelerate EU/US projects.
All units carry ASME U/UM, DOT-4TV, CE (PED 2014/68/EU), ISO 9001, ATEX, IECEx, RoHS, and REACH — ensuring full compliance in the EU, US, and APAC markets.
We provide full certification portfolios and engineering support to streamline local permitting.
Yes. We offer OEM/ODM design flexibility including custom heat exchanger configurations, pre-cooling loops, modular skids, and turnkey EPC packages. Lead time: 6 weeks from order confirmation.
Our modular designs are ideal for greenfield sites, cutting on-site assembly time by up to 50%.
All units are engineered for ≥98.5% uptime via redundant PLC systems, real-time IoT monitoring, and predictive maintenance alerts.
Our 2025 defect rate: 0.02% — vs. industry average of 1.2%.
Yes. We provide turnkey EPC services, including modular assembly, on-site commissioning, operator training, and 24/7 post-sales support.
Local service teams are available in Rotterdam, Houston, and Shijiazhuang for rapid response.
Most critical components ship within 5–7 business days from our Rotterdam or Houston hubs. We maintain local inventories for compressors, heat exchangers, and control systems.
Emergency response teams are on call 24/7 to minimize downtime.
Choose your preferred contact method:
🚀 Limited-Time Offer: Order by March 31, 2026 and receive a free IoT monitoring dashboard for the first 12 months — a $45,000 value.
“Natural gas will remain a critical bridge fuel through 2035, but only if paired with CCUS and renewable hydrogen integration. Liquefaction trains must achieve ≥20% energy efficiency gains to remain viable amid carbon pricing.”
“Low-emissions hydrogen production remains below 1% of global output, but electrolyzer deployments are scaling fast. By 2030, 75% of new liquefaction capacity must integrate renewable power to meet net-zero pledges.”
“The industrial gases market will reach $193B by 2034, driven by semiconductors, green hydrogen, and CCUS. Cryogenic liquefaction trains are the fastest-growing segment — with a 12% CAGR.”
“The modular skid design let us commission in stages — saving $2.3M in capital at risk. Energy efficiency beats our old Linde unit by 18%.”
— Procurement Manager, BASF Ludwigshafen
“The IoT dashboard caught a heat exchanger fouling issue 72 hours before it could impact production. Saved us a week of downtime.”
— Technical Director, Orsted Green Hydrogen Hub
Tell us your throughput, gas type, and timeline. We’ll send a custom proposal within 24 hours — including pricing, lead time, and certification roadmap.
🔒 Your privacy is protected. We never share your details with third parties.
About the Author
Alex Huang
Senior Cryogenic Engineer & Product Manager, Shijiazhuang Enric Gas Equipment Co., Ltd.
With 18 years in cryogenic equipment design and 12 years in international sales, Alex has delivered 300+ liquefaction trains across Europe, North America, and APAC. A graduate of Tsinghua University’s mechanical engineering program, he holds multiple patents in turboexpander efficiency optimization.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day