What Our Clients Get:
In today's volatile energy market, natural gas represents the most cost-effective bridge fuel between traditional hydrocarbons and renewable energy systems. Our LNG fuel equipment delivers:
According to the International Energy Agency's 2025 Global Hydrogen Review, LNG demand in marine applications has grown 18% annually since 2020, driven by:
Our LNG fuel equipment addresses these challenges with certified solutions that meet IMO Tier III, EPA 40 CFR Part 1045 and all major classification society requirements.
Many suppliers quote attractive tank prices but hide boil-off rates of 0.3-0.5% daily and hidden maintenance contracts costing $50,000/year.
ASME Section VIII Div.1, DOT 49 CFR, and EU PED requirements change frequently. Non-compliance risks shipping delays and $250,000 fines.
Traditional suppliers quote 6-9 month delivery times with no guarantee on spare parts availability for 15+ year equipment lifespans.
Many manufacturers provide no local service network and require parts shipped from Asia at $5,000+ per shipment.
Our LNG fuel equipment solutions eliminate these pain points through:
Built in our ISO 9001:2015 certified Shijiazhuang facility, our equipment incorporates:
Shijiazhuang Enric Gas Equipment's 50,000m² manufacturing base - one of China's largest LNG equipment production facilities
| Specification | Standard Model | Premium Model | Industry Average |
|---|---|---|---|
| Storage Capacity | 500kg - 20MT | Custom up to 100MT | 100kg - 15MT |
| Boil-Off Rate | 0.12% daily | 0.08% daily | 0.3-0.5% daily |
| Material | SA-240 304L Stainless | SA-240 316L + Duplex | Carbon Steel + Basic Coating |
| Pressure Rating | 1.6MPa (Standard) | Up to 4.0MPa | 0.8-1.2MPa |
| Certifications | ASME, DOT, CE, ISO 9001 | All above + DNV, ABS, LR | ASME or local equivalent |
| Warranty | 10 years (tank) | 15 years (premium models) | 1-5 years |
Our tanks use cryogenic 316L stainless steel with:
Our LNG fuel systems power operations across these critical sectors:
A Norwegian ferry company operating 4 vessels replaced diesel with our LNG systems:
Jan Olsen, Technical Director - Fjord Lines AS
Our LNG fuel equipment meets the most stringent international standards:
Each system includes:
"The vaporizer efficiency exceeded our expectations - we're seeing 99.2% heat transfer versus the 95% guaranteed. This translates to real fuel savings in our coastal operations."
- Captain Maria Rodriguez, Port Operations Manager, Mediterranean Shipping Company
"Their after-sales support is unmatched. When our remote monitoring system flagged a potential issue, their engineer was on-site in Singapore within 18 hours with the exact replacement part. That's service you can't put a price on."
- David Chen, Fleet Manager, NYK Line Asia
"We evaluated 8 suppliers before choosing Enric. Their boil-off management technology alone justified the premium. We're seeing 0.09% daily losses versus the 0.3% industry standard - that's 70% better performance."
- Hans Müller, Technical Director, Hapag-Lloyd
"The customization capabilities are exceptional. We needed a system that could handle our arctic operations with -40°C ambient temperatures. They modified the vaporizer design specifically for our needs - something no other supplier could do within our budget."
- Anna Petrov, Project Engineer, Sovcomflot
lng-as-a-fuel liquid-natural-gas-price liquefied-natural-gas-plant liquefied-gas-storage-tank-manufacturer
Most clients achieve ROI in 18-36 months depending on usage patterns. Our premium models with boil-off rates of 0.08% daily can achieve ROI in as little as 14 months in high-utilization applications.
Absolutely. We've supplied systems for Arctic operations in Siberia and desert environments in the Middle East. Our vaporizers feature patented anti-icing systems and our tanks use specialized insulation materials rated for -60°C to +80°C operating ranges.
Our systems are designed for minimal maintenance:
All maintenance is backed by our 10-year warranty.
Standard equipment ships in 90 days from order confirmation:
We maintain local inventory in Rotterdam, Singapore, and Houston for faster delivery to European and North American markets.
Yes, we provide multiple financing solutions:
Our finance team works directly with your procurement department to structure the optimal solution.
We provide the most comprehensive warranty in the industry:
All warranties include local service coverage with no hidden deductibles.
Offer valid until December 31, 2025 or until first 10 orders are placed

Europe & General Inquiries:
Bowen Di
📞 +86 15614368118
📱 WhatsApp: +86 18132059236
✉️ dibowen@enricgroup.com
North America & General Inquiries:
Jeremy Wu
📞 +86-15303302613
📱 WhatsApp: +86 13831019831
✉️ wuzuoliang@enricgroup.com
📞 +86-311-81663811
General Contact:
✉️ gasequipment@enricgroup.com
📍 No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
"The boil-off management is the real game-changer. We calculated we're losing 68% less fuel than with our previous supplier. That's $180,000 annually in savings."
- Captain Erik Svensson, Viking Line
"Their engineering team designed a system that fits our exact space constraints. The vaporizer is quieter than our diesel generators - our crew loves it."
- Maria Garcia, Port Engineer, Grimaldi Group
"The documentation was flawless - everything we needed for class society approval was included. That saved us 3 weeks in the certification process."
- Chen Wei, Project Manager, COSCO Shipping
Li Wei, Chief Engineer
LNG Systems Division
Shijiazhuang Enric Gas Equipment
● 23 years in LNG equipment design and manufacturing
● Led 50+ major LNG fuel system installations worldwide
● Holds 8 patents in cryogenic storage and vaporization technologies
● Published 12 technical papers on LNG safety and efficiency
With over two decades in the LNG equipment industry, I've seen the evolution from basic storage tanks to sophisticated integrated fuel systems. The real breakthrough came with the development of our boil-off management technology - reducing losses from 0.5% to 0.08% daily.
Our Shijiazhuang facility, one of China's largest LNG equipment manufacturing bases, produces systems that meet the most stringent international standards while maintaining competitive pricing. What sets us apart is our commitment to customization - we don't just sell equipment, we solve specific operational challenges.
The current market demands three critical qualities in LNG fuel equipment:
Our equipment delivers on all three. The ROI calculations are clear: LNG fuel systems pay for themselves in 18-36 months while reducing emissions by up to 95%.
Pro Tip: When evaluating suppliers, demand to see their boil-off rate guarantees in writing. Many quote attractive tank prices but hide inefficient vaporization systems that cost thousands annually in fuel losses.
Contact our experts today for a no-obligation consultation and quote.
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base
Shijiazhuang, 051430 Hebei Province, China
© 2025 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
Privacy Policy | Terms of Service
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day