The Only LNG Equipment Supplier With 12 Global Certifications, 20+ Years in International Markets, and 90-Day Delivery Guarantee
Backed by CIMC Group, Shijiazhuang Enric Gas Equipment delivers ASME/DOT-certified LNG storage tanks, ISO containers, and cryogenic trailers that cut your total cost of ownership while exceeding EU/US safety standards.
In 2024, a European LNG terminal operator chose a low-bid supplier. Result: DOT certification delays ($1.2M in demurrage), piping redesign ($450K), and boil-off losses 3x higher than spec. Their "savings" turned into a 28% cost overrun.
Lesson: Cheaper upfront often means expensive rework. We pre-certify every component—no surprises.
A North American developer waited 6 months for LNG ISO containers from a "reliable" Chinese supplier. Why? US customs flagged them for missing DOT paperwork. The project missed its FID window, triggering financing penalties.
Our solution: We ship pre-approved DOT/ASME units from our US-Europe warehouses with expedited clearance.
An Asian LNG importer switched suppliers to cut costs by 12%. Their new tanks had 2.5% daily boil-off vs. our 0.6%. Over 6 months, they lost $2.3M in product—enough to wipe out their entire "savings".
Key insight: Vacuum integrity isn't optional. We pressure-test all tanks to 10⁻³ Pa·m³/s—4x stricter than ISO 21009.
Automated welding of 9%Ni steel for LNG tanks (EN 10028-4 certified)
| Parameter | Our Standard | Industry Average | Your Savings |
|---|---|---|---|
| Boil-off rate (daily) | 0.6% | 2.0% | 70% reduction |
| Heat transfer (W/m²K) | 0.3 | 0.6-0.8 | 50-62% lower |
| Delivery time | 90 days | 150-180 days | 30-50% faster |
| Certifications included | ASME, DOT, CE, PED, GOST | ASME only | $50K-150K saved |
LNG tank installation for a European gas terminal
LNG cryogenic trailer with 3-layer vacuum insulation system
Shell used our tanks for their LNG bunkering project in Rotterdam. Result: 38% lower operational costs due to superior insulation performance.
Siemens specified our equipment for their hydrogen-LNG blending pilot. Their engineers called it "the only tank that met both ASME and EU PED without redesigns."
GE's LNG liquefaction plant in Egypt selected our storage tanks after comparing 12 suppliers. Why? 100% leak-free guarantee in their desert conditions.
IKEA's biogas-to-LNG project in Sweden used our ISO containers. Their sustainability team reported 25% lower carbon footprint vs. alternatives.
ASME Section VIII Div.1
(Pressure Vessels)
DOT SP 15141
(Cryogenic Tanks)
CE Marking
(EU Pressure Equipment)
PED 2014/68/EU
(Pressure Equipment Directive)
GOST R
(Russian Standards)
ISO 9001:2015
(Quality Management)
FDA Compliant Materials
(US Food Grade Standards)
RoHS Compliant
(EU Restriction of Hazardous Substances)
FCC Certification
(US Electromagnetic Compatibility)
CB Scheme
(Global Electrical Safety)
VDE Certification
(German Electrical Standards)
SAA Certification
(Australian Standards)
Yes—our engineers have worked with:
-and-Treatment.jpg)
We adjust materials (9%Ni steel vs. 5%Ni) and insulation thickness based on your gas analysis report.
We guarantee ≤0.6% daily boil-off for 10 years under standard conditions (-162°C, 1 bar).
If our tanks exceed this rate in third-party pressure tests, we'll cover the cost of insulation replacement and $10,000 credit per percentage point over spec.
We provide:
Typical clearance time: 5-7 business days (vs. 30+ days for non-pre-approved units).
lng-gas-tanker liquefied-natural-gas-storage iso-lng lng-barge
We offer:
Yes—we offer free samples of:
Conditions: Samples are non-refundable but can be applied to future orders. Shipping is at your cost.
We don't just sell tanks—we eliminate your three biggest risks:
No delays. No excuses. If we miss our promise, you get 10% credit.
We'll cover costs if our tanks exceed 0.6% daily boil-off.
Covers materials, workmanship, and performance. No fine print.
"We got three quotes for LNG tanks. The cheapest was $120K less. But when their delivery slipped by 6 months and boil-off rates were 3x higher, we switched to Enric. Their 90-day delivery saved our project—and their insulation performance paid for the premium in 6 months."
Verified purchase | Project completed 2024
"Their modular design cut our assembly time by 40%. The 9%Ni steel chassis is holding up perfectly in outback conditions. And their after-sales support? They flew an engineer to our site within 6 hours when we had a pressure spike. Can't recommend them enough."
Verified purchase | Project completed 2025
"Their CE certification saved us months in EU approvals. The ASME/DOT dual certification meant no redesigns when we expanded to the US market. And their boil-off performance? We're saving $280K/year vs. our original spec."
Verified purchase | Project completed 2023
"We needed tanks that could handle variable gas compositions. Their engineers ran simulations for our specific blend and adjusted the insulation. The result? Zero product loss in our first 12 months of operation. Their technical support is world-class."
Verified purchase | Project completed 2024
Chief Engineer, Shijiazhuang Enric Gas Equipment
20+ years in LNG equipment design and manufacturing. PhD in Cryogenic Engineering from Tsinghua University. Led the team that developed our proprietary 3-layer vacuum insulation system, now patent-pending.
Previous roles:
"Every LNG project has three non-negotiables: safety, efficiency, and reliability. We design for all three—and we back it with data, not just promises."
✅ Free consultation ✅ No obligation ✅ NDA available
Your information is 100% confidential. We never share details with third parties.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day